• Title/Summary/Keyword: Repowering

Search Result 10, Processing Time 0.019 seconds

A techno-economic analysis of partial repowering of a 210 MW coal fired power plant

  • Samanta, Samiran;Ghosh, Sudip
    • Advances in Energy Research
    • /
    • v.3 no.3
    • /
    • pp.167-179
    • /
    • 2015
  • This paper presents a techno-economic analysis of a partial repowering scheme for an existing 210 MW coal fired power plant by integrating a gas turbine and by employing waste heat recovery. In this repowering scheme, one of the four operating coal mills is taken out and a new natural gas fired gas turbine (GT) block is considered to be integrated, whose exhaust is fed to the furnace of the existing boiler. Feedwater heating is proposed through the utilization of waste heat of the boiler exhaust gas. From the thermodynamic analysis it is seen that the proposed repowering scheme helps to increase the plant capacity by about 28% and the overall efficiency by 27%. It also results in 21% reduction in the plant heat rate and 29% reduction in the specific $CO_2$ emissions. The economic analysis reveals that the partial repowering scheme is cost effective resulting in a reduction of the unit cost of electricity (UCOE) by 8.4%. The economic analysis further shows that the UCOE of the repowered plant is lower than that of a new green-field power plant of similar capacity.

A Study on Repowering of Domestic Aged Coal-fired Power Plant

  • Baek, SeHyun;Kim, YoungJoo;Kim, HyunHee;Park, SangBin;Jang, JiHoon
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.3 no.1
    • /
    • pp.35-39
    • /
    • 2017
  • Recently, the public opinion is growing that the main cause of greenhouse gas, fine dust and nitrogen oxide, sulfuric acid emission is coal-fired power plant, and now the decommission or conversion to other clean fuel is being demanded. However, it is a huge national loss to decommission coal-fired power plant with remaining life, and also simple fuel converting to natural gas will lead to drastic rise on power generating cost. Therefore, this study aims to provide the analysis result about the reduction effect of $CO_2$, environment emission, and to influence to power plant performance and facilities when repowering with adding gas turbine is applied to domestic aged coal-fired power plant.

Characteristics and Economic Evaluation of a CO2-Capturing Repowering System with Oxy-Fuel Combustion for Utilizing Exhaust Gas of MCFC (MCFC 배기가스를 이용하는 순산소연소 $CO_2$ 회수형 발전시스템의 특성과 경제성 평가)

  • Pak, Pyong-Sik;Lee, Young-Duk;Ahn, Kook-Young;Jeong, Hyun-Il
    • Proceedings of the KSME Conference
    • /
    • 2008.11b
    • /
    • pp.2940-2945
    • /
    • 2008
  • The scale of 2.4 MW MCFC was taken to construct a high-efficiency and economical power generation system without CO2 emission into the atmosphere for utilizing its exhaust gas. The conventional steam turbine power generation system (STGS) was evaluated and the net generated power (NGP) was estimated to be only 133 kW and the STGS is not economically feasible. A CO2-caputuring repowering system was proposed, where low temperature steam (LTS) produced at HRSG by using exhaust gas from MCFC is utilized as a main working fluid of a gas turbine, and the temperature of LTS was raised by combusting fuel in a combustor by using pure oxygen, not the air. It has been shown that NGP of the proposed system is 264 kW, and CO2 reduction amount is 608 t-CO2/y, compared to 306 t-CO2/y of STGS. The CO2 reduction cost was estimated to be negligible small, even when the costs of oxygen production and CO2 liquefaction facilities etc. were taken into account.

  • PDF

Economic Analysis on Repowering Plans for a Outworn Anthracite Power Plant (노후 무연탄발전소의 리파워링 방안에 대한 경제성 분석)

  • Kim, Su-Man;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.9 no.1
    • /
    • pp.36-42
    • /
    • 2013
  • In this study, repowering scenarios are analyzed and evaluated from the economical point of view on a case by case basis. Based on the result of evaluation, the IRR indicates 2.34% on single 750 MW LNG combined cycle unit, 3.56% on 500 MW sub-bituminous PC units and 2.31% on 200 MW circulating fluidized bed combustion units, resulting in not reaching 7% rate of discount rate and being concluded uneconomical. However, proposes that it is most economical and feasible to repower power plant into 750 MW LNG combined cycle unit as long as the economic feasibility can be improved and it is necessary for old anthracite power plant to be repowered than rebuilt under the circumstances of lacking power supply.

  • PDF

Industrial Trend Analysis of Windturbine's Part and System (풍력발전기 부품 및 시스템의 산업동향 분석)

  • Kwon, young-il
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2010.05a
    • /
    • pp.554-556
    • /
    • 2010
  • 풍력발전기의 수요가 유럽에서 북미, 아시아로 확대되고 있으며, 육상 풍력발전에 비해 대형 발전기 설치에 공간적 제약이 없는 해상 풍력발전이 선진국들에 의해 채택되고 있고 발전기의 대형화(Repowering)를 통한 에너지효율 증대, 단위 용량당 건설비 감소 등의 유리한 점 때문에 풍력발전기가 대형화되는 추세이다.

  • PDF

Speed Estimation at Coasting Condition in a Sensorless Induction Motor Drive for Railway Vehicle Traction System (철도차량 추진 제어를 위한 유도전동기 센서리스 구동 시스템에서 타행운전시 속도 추정)

  • Kim, Sang-Hoon;Park, Nae-Chun
    • Journal of Industrial Technology
    • /
    • v.30 no.A
    • /
    • pp.31-35
    • /
    • 2010
  • In this paper, a speed estimation method at coasting operation in an induction motor speed sensorless control for railway vehicle traction systems is presented. At coasting operation, there is no information obtaining rotor speed since all switches of an inverter are turned off. The inverter frequency should be synchronized with the rotor frequency for repowering at coasting condition. The proposed method injects DC current to the induction motor during a short time, then the flux angle and rotor speed needed for control can be estimated rapidly.

  • PDF

EBS for BIM based maintenance management of Thermal Power Plant (BIM기반 화력발전시설 유지관리를 위한 EBS(Elements Breakdown Structure)개발)

  • Kim, Chang-Soo;Cha, Sang-Hoon;Ji, Soung-Min
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.81-82
    • /
    • 2015
  • BIM has been a reliable construction project management tool to handle various kinds of construction information generated in the facility life cycle. To take these advantages, researchers have been promoted numerous studies in a residential, a commercial, and an educational facilities with a large number of on-going projects. However, despite running as the role of essential energy supplier, power plant related BIM research is relatively insufficient than others. In particular, due to the extending of the facility service period and the requirement of the complicated construction project management for 'overhaul' and 'repowering' in the power plant maintenance phase, the needs for using BIM have been increased gradually. For using BIM based maintenance, it is needed to consider an information collecting methods and necessary to develop an appropriate breakdown structure to share information. Therefore, 'EBS' is produced by reviewing the previous research related to BIM and analyzing the repair activities in the maintenance phase. Proposed 'EBS' must be useful not only a judgment between capital expenditure versus revenue expenditure but also appropriate maintenance strategies development for property management.

  • PDF

두만강지역개발계획(RADP)에 관련된 동북아시아 지역 전력계통의 연계 및 안전성 강화방안

  • 윤갑구
    • Proceedings of the Korean Professional Engineer Association Conference
    • /
    • 1996.12a
    • /
    • pp.76-102
    • /
    • 1996
  • 북한은 전력부족난과 전기품질의 저하로 인하여 주요 생산기업에 지장을 주고 있으며, 노후 발전소의 성능저하도 함께 진행되고 있는 것으로 추정된다. 이에 대한 적절한 대책이 없는 한 그 상황은 더욱 악화될 전망이다. 한반도 에너지 개발기구(KEDO)가 추진하고 있는 경수로 원자력 발전기가 6~7년 후에 준공된다고 해도 이처럼 불안정한 전력계통에 병입되어 원활한 운전이 가능할런지 기대하기 곤란하다. 이러한 실정에서 \circled1 전력부족으로 주파수가 저하될 때 우선 순위가 낮은 부하를 제한하는 자동 부하제한 방식을 포함한 자동 주파수 제어 계통개선 \circled2 기존발전소 성능과 이용을 향상을 위한 재가동(Repowering) 등의 리 엔지니어링 \circled3 가스터빈 복합화력과 열병합발전(Co-generation) 등과 같이 건설기간이 짧고 비용이 적게 들며 송전 설비 건설도 불필요한 분산형 전원의 건설 \circled4 수력발전소와 조력발전소의 건설 \circled5 양수발전 등 전력에너지 저장설비의 개발 \circled6 송전전압격상과 배전방식개선 및 종합전력정보시스템 구축 \circled7 남ㆍ북한 전력계통 내지는 동북아시아 전력계통을 연계하는 평화망사업(Peace Network Project)등의 추진이 경수로 사업에 선행되어야 한다. 특히 러시아, 중국, 한국, 일본의 발전 에너지원 분포와 년간 부하곡선을 고려할 때 동북아시아 전력계통의 연계는 관련국 상호간에 에너지 환경과 경제적 측면에서 상당한 이득과 안정성을 강화해 줄 것이며, 기술발전과 평화공존에 크게 기여 할 것이다. 이를 위하여 관련국의 전력계통연계 전문가들이 참여하는 남\ulcorner북한전력 계통연계연합회(Co-Pia ; Co-rea Power Systems Interconnection Association)와 동북아지역전력 계통연합회(Near Pia=North-Eastern Asia Region Power Systems Interconnection Association)의 구성을 제안하는 바이다. 주요용어(Key Words): 자동주파수 제어(AFC), 리엔지니어링(Re-Engineering), 분산형 전원(Dispersed Generation System), 전력저장(Power Storage), 부하조절기(Load Conditioner), 수요관리(DSM) 연계(Interconnection), 인터시스템(Intersystem), 통합자원계획(IRP), 안전성 강화(Security Enhancement), 전력시장개방(Electricity Free Maket), 통일비용(Unification Expense, Unification Cost), 남ㆍ북한전력계통연계연합회(Co-Pia), 동북아지역전력 계통연계연합회(Nea,-Pia).

  • PDF

Evaluation of Wind Turbine Efficiency of Haengwon Wind Farm in Jeju Island based on Korean Wind Map (풍력-기상자원지도에 기반한 제주 행원 풍력발전단지 효율성 평가)

  • Byon, Jae-Young;Kang, Mi-Sun;Jung, Hyun-Sook
    • Journal of the Korean earth science society
    • /
    • v.34 no.7
    • /
    • pp.633-644
    • /
    • 2013
  • This study evaluates wind farm efficiency at Haengwon in Jeju Island. The actual energy production at Haengwon wind farm is compared with the estimated energy production based on Korean wind map which is developed at the National Institute of Meteorological Research/KMA. The validation of wind map at Gujwa located near the Haengwon wind farm shows that the wind speed is overestimated. The diurnal variation of wind speed shows a maximum value in the afternoon due to the effect of sea-land breeze. The ratio of the actual energy production at Haengwon wind farm and the estimated energy production based on the Korean wind map is 24.8%, while the distribution of energy frequency is similar each other. The difference of energy production is caused by mechanical error of the turbine and the overestimation of the simulated wind map. This study will contribute to the repowering of turbines for improving the efficiency of wind farm in the future.

An Experimental Study on Reinforcement Method for Reuse of Onshore Wind Turbine Spread Footing Foundations (육상풍력터빈 확대기초의 재사용을 위한 보강방법에 관한 실험적 연구)

  • Song, Sung Hoon;Jeong, Youn Ju;Park, Min Su;Kim, Jeong Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.1
    • /
    • pp.1-11
    • /
    • 2021
  • In order to reuse existing onshore turbine foundations, it is important to redesign and reinforce the existing foundations according to the upgraded tower diameter and turbine load. In the present study, a slab extension reinforcement method and structure details of an anchorage part were examined in consideration of the reuse of spread footings, which are the most widely used foundation type in onshore wind turbine foundations. Experiments were conducted to evaluate the load resistance performance of a reinforced spread footing according to structure details of an anchorage part. The results showed that (1) the strength of an anchorage part could be increased by more than 30 % by adding reinforcement bars in the anchorage part, (2) pile-sleeves attached to an anchor ring contributed to an increase in rotational stiffness by preventing shear slip behavior between the anchor ring and the concrete, and (3) slab connectors contributed to an increase in the strength and deformation capacity by preventing the separation of new and old concrete slabs.