• Title/Summary/Keyword: Reservoir Flood Routing

Search Result 45, Processing Time 0.032 seconds

A Forecasting Model for the Flood Peak Stage and Flood Travel Time by Hydraulic Flood Routing

  • Yoon, Yong-Nam;Park, Moo-Jong
    • Korean Journal of Hydrosciences
    • /
    • v.4
    • /
    • pp.11-19
    • /
    • 1993
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole large reservoir system in the Han River, Korea. The computed flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by a rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood travel time, release rate and duration from the upper dam.

  • PDF

Analysis on Flood Control Effect of Siphon Spillway by Reservoir Routing (저수지 추적을 통한 사이펀 여수로의 홍수조절 효과 분석)

  • Ko, Suhyeon;Kim, Jaeyoung;Lee, Giha
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.11
    • /
    • pp.55-63
    • /
    • 2013
  • Agricultural small dam reservoirs in Korea are vulnerable to flooding because of insufficient flood control capacity and deterioration such that reservoir water level is likely to rise rapidly and a large amount of water release quickly to downstream without flood warning. In this study, we performed hydrologic analysis to estimate design flood(200 years return period ${\times}1.2$) and also evaluated the effect of siphon spillway as a structural countermeasure for flood control and mitigation by applying reservoir routing to the Jipyeong reservoir, located in Sangju, Korea. The results show that the design flood was calculated at $284.3m^3/s$, and water level and water release decreased by 40cm and $91m^3/s$, respectively.

Effect of Temporal Distribution of Rainfall on Water-Surface Level of Sihwa Lake (강우분포유형이 저수지의 홍수위에 미치는 영향 (시화호를 중심으로))

  • Lee, Jong-Kyu;Lee, Jai-Hong
    • Journal of Korea Water Resources Association
    • /
    • v.36 no.2
    • /
    • pp.325-343
    • /
    • 2003
  • In this study, several types of rainfall time distribution of the probabilistic rainfall amount have been applied to the Sihwa Lake, located in Gyounggi Province, Korea and their runoff characteristics, obtained by the Hec-Hms program, according to the rainfall distribution types, were compared and analysed. And then, the influences of the above rainfall distribution types of the highest water level of the reservoir, computed through the reservoir flood routing, were analysed. The tidal variation was considered, performing the flood routing and, in addition, the new program, called “IWSEA”, which can compute the reservoir water level, was developed. To conclude, when the Mononobe type of the rainfall distribution was used, the largest inflow flood discharge into the reservoir was performed and the highest reservoir water level was obtained when the Pilgrim-Cordery type of the rainfall distribution was applied.

Theory and Example of Flood Routing (공수조절의 이론 및 계산예)

  • 김동만
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.6 no.1
    • /
    • pp.721-736
    • /
    • 1964
  • Flood routing is one of the most important engineering problems for the design of a spillway, and the procedures for the routing should be thoroughly understood by the engineers engaged in the planning of a spillway. There are many methods for the flood routing such as Muskingum, Steinberg, Puis, Holton, Goodrich, Rutter, Graves, Snyder, etc., which are being used in many countries. This article introduces the theory of the modified PuIs Method in detail which is exclusively being used in the Bureau of Reclamation, Department of Interior, U.S.A. Also, this article includes a routing example worked by the writter for the Ee-dong Reservoir of the Ki-ho Irrigation Association. in Kyong-gi Province.

  • PDF

Flood Routing Analysis Considering the Effects of Dams in Han River (한강수계에서의 댐의 영향을 고려한 홍수추적)

  • Han, Kun-Yeun;Choi, Kyu-Hyun;Kim, Won;Kim, Dong-Hyun
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.9 s.158
    • /
    • pp.747-760
    • /
    • 2005
  • This study has performed flood routing computations considering the upstream and intermediate dams in Han River using DAMBRK. Hypothetical reservoirs with variable dimensions are used to compare the validity of the reservoir routing methods, that are storage routing and dynamic routing. The flood events in September, 1990 and August, 1995 are used to verify the applicability of the model. The model performs the flood analysis more accurately considering multiple dam effects in Han River. The methodologies presented in this study will give a good contribution for basin-wide flood forecasting in Han River basin.

Forecasting of Peak Flood Stage at Downstream Location and the Flood Travel Time by Hydraulic Flood Routing (수리학적 홍수추적에 의한 댐 방류시 하류수위 및 주요 하도구간별 홍수도달 시간의 예측)

  • 윤용남;박무종
    • Water for future
    • /
    • v.25 no.3
    • /
    • pp.115-124
    • /
    • 1992
  • The peak flood discharge at a downstream station and the flood travel time between a pair of dams due to a specific flood release from the upper reservoir are computed using a hydraulic river channel routing method. The study covered the whole reservoir system in the Han River. The computed peak flood discharges and the travel times between dams were correlated with the duration and the magnitude of flood release rate at the upstream reservoir, and hence a multiple regression model is proposed for each river reach between a pair of dams. The peak flood discharge at a downstream location can be converted to the peak flood stage by rating curve. Hence, the proposed regression model could be used to forecast the peak flood stage at a downstream location and the flood travel time between dams using the information on the flood release rate and duration from the upper dam.

  • PDF

Development of Flood Analysis Module for the Implementation of a Web-Based Flood Management System (웹기반 홍수관리시스템 구현을 위한 홍수분석모듈개발)

  • Jung, In Kyun;Park, Jong Yoon;Kim, Seong Joon;Jang, Cheol Hee
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.56 no.6
    • /
    • pp.103-111
    • /
    • 2014
  • This study was to develop the flood analysis module (FAM) for implementation of a web-based real-time agricultural flood management system. The FAM was developed to apply for an individual watershed, including agricultural reservoir. This module calculates the flood inflow hydrograph to the reservoir using effective rainfall by NRCS-CN method and unit hydrograph calculated by Clark, SCS, and Nakayasu synthetic unit hydrograph methods, and then perform the reservoir routing by modified Puls method. It was programmed to consider the automatic reservoir operation method (AutoROM) based on flood control water level of reservoir. For a $15.7km^2$ Gyeryong watershed including $472{\times}10^4m^3$ agricultural reservoir, rainfall loss, rainfall excess, peak inflow, total inflow, maximum discharge, and maximum water level for each duration time were compared between the FAM and HEC-HMS (applied SCS and Clark unit hydrograph methods). The FAM results showed entirely consistent for all components with simulated results by HEC-HMS. It means that the applied methods to the FAM were implemented properly.

Assessment of Flood Impact on Downstream of Reservoir Group at Hwangryong River Watershed (황룡강 유역 저수지군 하류하천 영향평가)

  • Hwang, Soon-Ho;Kang, Moon-Seong;Kim, Ji-Hye;Song, Jung-Hun;Jun, Sang-Min;Lee, Sang-Hyun;Choi, Jin-Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.54 no.3
    • /
    • pp.103-111
    • /
    • 2012
  • Works for dam heightening plan have dual purposes: flood disaster prevention by securing additional storage volume and river ecosystem conservation by supplying stream maintenance flow. Now, the dam heightening project is in progress and there are 93 dam heightened reservoir. After the dam heightening project, 2.2 hundred million ton of flood control volume in reservoirs will be secured. Thus it is necessary to evaluate the effects of the dam heightening project on watershed hydrology and stream hydraulics, and resulting flood damages. This study was aimed to assess the impact of outflow from the dam heightened reservoir group on the Whangryong river design flood. The HEC-HMS (Hydrologic Engineering Center-Hydrologic Modeling System) model was used for estimating flood discharge, while HEC-5 (Hydrologic Engineering Center-5) was used for reservoir routing. This study analysed flood reduction effect on 100yr and 200yr return periods about the before and after heightening of agricultural dams. Based on the results of this study, the reduction of flood peak discharge at downstream of the reservoir group was estimated to be about 41% and 53% for 100yr and 200yr frequencies, respectively.

Development of System for Sizing Flood Detention Storages (홍수 저류지 규모결정 시스템 개발)

  • Noh, Jae-Kyoung;Oh, Jin-Young;Yoo, Jae-Min
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.884-888
    • /
    • 2006
  • A system was developed to size flood detention storages at the planned Dangjin residing district. Components of system is consisted of module for deriving relationship between elevation and storage, module for calculating sediment elevation, module for setting outflow sizes and elevations, module for reservoir flood routing, and module for ascertaining sizes of detention facilities. And a system was constructed with Visual Basic 6.0. Using this system, sizes of flood detentions are able to be determined very easily and rapidly only by pushing command buttons and by viewing results.

  • PDF

Analysis of Small reservoir system by Flood control ability augmentation (치수능력 증대에 따른 저수지시스템 분석)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.11
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.