• Title/Summary/Keyword: SIMMOD

Search Result 2, Processing Time 0.019 seconds

A Comparative Study on Delay Calculation Method of Airport Capacity (공항 수용량의 지연시간 산출방식 비교 연구)

  • Lee, HyoJu;Kim, DoHyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.28 no.2
    • /
    • pp.47-52
    • /
    • 2020
  • Air transport demand is on a sharp rise due to growth in the aviation market. To prepare for this rapidly growing demand for aviation, airport operators are interested in the processing airport capacity. Airport throughput is determined to be the smallest of the facility capacities that make up the airport, but it is customary to determine the cost and time consuming runway capacity as airport capacity. Previous studies have shown that while recent studies have been conducted on airport capacity, there is little research on the criteria for determining capacity. In this study, we would like to determine the extent to which airport capacity is affected by the airport's operating hours and the resulting delays.

Estimation of Incheon International Airport Capacity by using Aircraft Delay Simulation Model (시뮬레이션 모델을 활용한 인천국제공항 수용량 산정에 관한 연구)

  • Bang, Jun;Kim, DoHyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.27 no.1
    • /
    • pp.20-25
    • /
    • 2019
  • To prepare for the ever-increasing demand for air transport, airport operators should be well aware of the timing of the saturation of the facility and increase the capacity of the airport through extension or extension. The capacity of an airport is determined by the smallest value of the facilities that make up the airport, but it is generally customary to determine the capacity of the costly and time-consuming runway as a whole for the airport. For analyzing the capacity of the runway capacity, the study used the most accurate microscopic air traffic simulation, Simmod-PRO, to analyze the saturation time of three runways currently in Incheon International Airport's operation, and calculate the appropriate time for operation of the 4th runway. The study also calculate the relocation of Airport's high-speed exit taxiway for analyzing the increasing of capacity.