• Title/Summary/Keyword: Schedule Information

Search Result 1,089, Processing Time 0.033 seconds

A study on the Information for the Schedule Management of the Construction based BIM (BIM기반 건설공사 일정관리를 위한 정보에 관한 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of Digital Contents Society
    • /
    • v.16 no.4
    • /
    • pp.555-564
    • /
    • 2015
  • Since the size of the construction project has become massive, complicated and specialized, the use for a substantial amount of information provided from diverse participants is considered important. Schedule information obtained from a variety of sources is key during the construction project. Misunderstanding of schedule management information causes delay of construction period and low quality of construction. Currently, interest in BIM (Building Information Modeling) that produces the necessary data for the entire life cycle of the building process is rising. The study is to construct the BIM-base-information system in order to systematically manage schedule information of the construction work. For this purpose, the study established a BIM-base-schedule-management-business process and drew a classification system for the work for schedule-information construction. The study also drew information that can be extracted from the BIM model among properties required to build certain information. The schedule is made upon consideration of information needed for schedule management, and information required to schedule a timeline of the construction project by process is established.

A Basic Study for Accumulation of IFC-based Schedule Information (IFC 기반의 공정정보 축적을 위한 기초연구)

  • Song, Jong-Kwan;Choi, Won-Sik;Won, Ji-Sun;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5890-5896
    • /
    • 2013
  • This Study aimed at suggesting the plan for accumulating and utilizing schedule information of IFC file in BIM-based delivery system. For this Propose, First, literature review is conducted for analyzing utilization plan of schedule information and the IFC standard. Second, Schedule Planning process is analyzed to draw Schedule elements, and schedule information items is derived by analyzing schedule process and commercial software. Also, schedule elements in the IFC schema is derived by analyzing IFC schema through drawn schedule information. Finally, this study suggests a concept model accumulating and utilizing Schedule information included in IFC schema, and a conceptual delivery process of BIM model by analyzing BIM Application Guideline for Facility Project by PPS (Public Procurement Service) for accumulating IFC delivery files This study will expects to contribute to accumulate information of BIM model at the point of nationally introducing BIM.

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Design and Implementation of Real-Time Progress Management System Using UML (Unified Modeling Language) - The Focus on Steel Structural Construction - (UML을 이용한 실시간 진도관리 시스템의 설계 및 구현 - 로봇 크레인 기반 철골공사를 중심으로 -)

  • Park, Jung-Lo;Kim, Kyung-Hwan;Kim, Jael-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.163-166
    • /
    • 2009
  • All sorts of technique for schedule progress management is being developed recently, These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using UML, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Research of Earned Schedule Method to forecast progressed schedule of IT Project (IT 프로젝트 수행 시 추진 일정 예측을 위한 Earned Schedule Method 활용에 관한 연구)

  • Eom, Seung-Wook;Lee, Seouk-Joo;Kang, Jae-Woo
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.1352-1355
    • /
    • 2011
  • Earned value management(EVM)는 프로젝트 진행 상태를 파악하기 위해 주로 비용과 일정 편차, 성과지표를 통합하여 분석하는 것으로 비용/원가 관리를 위해 발전되어 사용되어 왔다. 그러나 최근에는 경영환경 변화에 따라 불확실성이 증가하여 프로젝트 전체 일정의 예측에 대한 성과지표로 사용되고 있다. 본 연구에서, 비용관점에서 분석된 earned value management의 성과 지표와 시간관점에서 분석된 earned schedule의 성과 지표를 비교하여 차이점을 도출하고 비용관점에서의 지표가 프로젝트 전체 일정을 예측하는 것에서는 신뢰성이 떨어지는 현상을 발견하였다. 향후 본 연구를 통해 프로젝트 비용관리와 더불어 earned schedule의 성과 지표를 이용한 일정 예측을 통해 성공적인 프로젝트 수행에 도움이 되도록 하고자 한다.

A Study on the Development of a Real-Time Schedule Progress Control System in Steel Structural Construction (철골골조공사의 실시간 진도관리 시스템 구축에 관한 연구)

  • Kim, Kyong-Hoon;Kim, Kyung-Hwan;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.886-891
    • /
    • 2007
  • All sorts of technique for schedule progress management is being developed recently. These can change and develop the abstractive concept model to a detailed model that describes the visual 3D image about a schedule plan. but, this technique is troublesome, because this requires the handwork by means of connection between 3D-CAD and scheduling Program. In this study, the process of real-time schedule progress control system using the integrated database by 3D-CAD object information system and schedule module is presented. This study present the process of a schedule progress management using IDEF0 model, and the process of real-time schedule progress management using RFID system. Through this study, we want to realize the rapid generation of estimated schedule information and to simulate and analyze actual schedule information by real-time.

  • PDF

Method of Deriving Activity Relationship and Location Information from BIM Model for Construction Schedule Management (공정관리 활용을 위한 BIM모델의 공정별 수순 및 위치정보 추출방안)

  • Yoon, Hyeongseok;Lee, Jaehee;Hwang, Jaeyeong;Kang, Hyojeong;Park, sangmi;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.33-44
    • /
    • 2022
  • The simulation function by the 4D system is a representative BIM function in the construction stage. For the 4D simulation, schedule information for each activity must be created and then linked with the 3D model. Since the 3D model created in the design stage does not consider schedule information, there are practical difficulties in the process of creating schedule information for application to the construction stage and linking the 3D model. In this study, after extracting the schedule information of the construction stage using the HDBSCAN algorithm from the 3D model in the design stage, authors propose a methodology for automatically generating schedule information by identifying precedence and sequencing relationships by applying the topological alignment algorithm. Since the generated schedule information is created based on the 3D model, it can be used as information that is automatically linked by the common parameters between the schedule and the 3D model in the 4D system, and the practical utility of the 4D system can be increased. The proposed methodology was applied to the four bridge projects to confirm the schedule information generation, and applied to the 4D system to confirm the simplification of the link process between schedule and 3D model.

An Efficient Scheme to write a Transmission Schedule using Convergence after Interactive Operations in a Stored Video (대화형 연산 후 수렴을 이용한 저장된 비디오의 효율적인 전송 스케줄 작성 방안)

  • Lee, Jae-Hong;Kim, Seung-Hwan
    • The Transactions of the Korea Information Processing Society
    • /
    • v.7 no.7
    • /
    • pp.2050-2059
    • /
    • 2000
  • In a video-on-Demand(VOD) service, a server has to return to he normal playback quickly at a certain new frame position after interactive operations such as jump or last playback. In this paper, we propose an efficient scheme to write a transmission schedule for a playback restart of a video stream at a new frame position after interactive operations. The proposed scheme is based on convergence characteristics, that is transmission schedules with different playback startup frame position in a video stream meet each other at some frame position. The scheme applies a bandwidth smoothing from a new frame position to a convergence position without considering all remaining frames of a video stream. And then the scheme transmits video dta according to the new schedule from the new frame position to the convergence position, and then transmits the remaining video data according to the reference schedule from the convergence position, and then transmits the remaining video data according to the reference schedule from the convergence position to the last frame position. In this paper, we showed that there existed the convergence position corresponding to nay frame position in a video stream through many experiments based on MPEG-1 bit trace data. With the convergence we reduced the computational overhead of a bandwidth smoothing, which was applied to find a new transmission schedule after interactive operations. Also, storage overhead is greatly reduced by storing pre-calculated schedule information up to the convergence position for each I frame position of a video stream with video data off-line. By saving information on a transmission schedule off-line along with the video data and searching the schedule corresponding to the specified restarting frame position, we expect the possibility of normal playback of a video stream with small tolerable playback startup delay.

  • PDF

Integrated Management of Process Schedule and Quantity Take-Off for Steel Structures using BIM Information (BIM정보를 활용한 강구조물의 공정 물량 통합관리)

  • Kim, Jin-Uk;Shin, Tae-Song
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.10-18
    • /
    • 2018
  • BIM technologies store, share and integrate the information produced in each sector of the construction industry. From this point on, it increases the efficiency of the work. Currently, quantity take-off and process schedule are derived separately based on BIM technology. When calculating the quantity by process, relevant information shall be collected, reinterpreted, and reevaluated as required by the practice. The purpose of this study is to develop an integrated process and quantity management system through BIM collaboration and to build prototypes for steel structures. The main research is to build a construction BIM model for steel structures and a process BIM model through BIM collaboration. Furthermore, necessary information was selected and processed according to the user's needs for integrated management. Relevant integration outcomes are visualized graphically to maximize utilization. Through these studies, a system for integrated control of processes and supplies is provided, and the results are expected to contribute to the improvement of working efficiency and are easily and quickly reflected in design change and process change. In this study, we intended to enhance the usability of information by linking process schedules with quantity calculations based on BIM. Thus, the process for integrated control of the quantity of structural components by process unit and the BIM based schedule information was established. In addition, the efficiency of the information link of the integrated management system was considered for design changes and process schedule changes.

A Stay Detection Algorithm Using GPS Trajectory and Points of Interest Data

  • Eunchong Koh;Changhoon Lyu;Goya Choi;Kye-Dong Jung;Soonchul Kwon;Chigon Hwang
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.15 no.3
    • /
    • pp.176-184
    • /
    • 2023
  • Points of interest (POIs) are widely used in tourism recommendations and to provide information about areas of interest. Currently, situation judgement using POI and GPS data is mainly rule-based. However, this approach has the limitation that inferences can only be made using predefined POI information. In this study, we propose an algorithm that uses POI data, GPS data, and schedule information to calculate the current speed, location, schedule matching, movement trajectory, and POI coverage, and uses machine learning to determine whether to stay or go. Based on the input data, the clustered information is labelled by k-means algorithm as unsupervised learning. This result is trained as the input vector of the SVM model to calculate the probability of moving and staying. Therefore, in this study, we implemented an algorithm that can adjust the schedule using the travel schedule, POI data, and GPS information. The results show that the algorithm does not rely on predefined information, but can make judgements using GPS data and POI data in real time, which is more flexible and reliable than traditional rule-based approaches. Therefore, this study can optimize tourism scheduling. Therefore, the stay detection algorithm using GPS movement trajectories and POIs developed in this study provides important information for tourism schedule planning and is expected to provide much value for tourism services.