• 제목/요약/키워드: Sequence Maintenance

검색결과 113건 처리시간 0.037초

FMEA 개념과 사례베이스추론 기법을 이용한 보전작업순서결정시스템의 개발 (Development of Maintenance Sequence System by Using Modified FMEA and CBR)

  • 김광만
    • 대한안전경영과학회지
    • /
    • 제3권4호
    • /
    • pp.103-112
    • /
    • 2001
  • In Factory, as the number of machine is increased the more maintenance efforts are necessary. Multi maintenance issues may occur at a certain time and the determination of maintenance sequence is needed. In this study, we first compare the priority of machines and the impact value using modified FMEA(Failure Mode Effect and Analysis) method. Also, CBR(Case-based Reasoning) approach is applied to retrieve similar fault cases of current machine problem. The proposed methodology will be useful to implement decision support system of maintenance sequence for CMMS/EAM (Computerized Maintenance Management System/Enterprise Asset Management).

  • PDF

강합성형 교량의 합리적인 타설방법과 순서에 관한 연구 (The Reasonable Concrete-Placing Methods and Sequences of Composite Steel Bridge)

  • 조병완;서석구
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제3권2호
    • /
    • pp.205-212
    • /
    • 1999
  • Recently, unexpected cracks in the concrete deck slab of composite steel bridges have been widely reported at an early age of concrete placing due to the concrete placing sequence and methods. Accordingly, the analytical research was carried out to verify the negative moment at an internal supports due to the several concrete pouring sequence and to determine the reasonable concrete placing method on the deck slab of composite steel bridge. The results show that the conventional concrete-placing method, which pours concrete first on the positive moment regions and then negative regions, leads to the minimum moment at an internal supports. However, the conventional method produces two impractical construction joints on every spans and makes field engineer to pour concrete continuously. In conclusion, this concrete-placing method was verified to be reasonable only when the construction joint was placed at the $\frac{5}{8}l{\sim}\frac{6}{8}l$ location of the middle span.

  • PDF

SFC로 설계된 공정제어에서 선택시퀀스의 메모리효율향상 (Improvement of Memory Efficiency for Alternative Sequence in Process Control System Described by SFC)

  • 유정봉
    • 조명전기설비학회논문지
    • /
    • 제24권5호
    • /
    • pp.55-61
    • /
    • 2010
  • PLC 제어 시스템은 SFC 언어를 사용하여 설계할 경우, SFC 언어를 사용하면 제어의 흐름을 이해하기 쉽고, 유지보수가 용이하며 프로그램의 기술성이 뛰어나다. SFC 언어는 단일 시퀀스, 선택 시퀀스, 병렬 시퀀스로 나누어지며, 선택 시퀀스로 프로그래밍 하면 단일 시퀀스로 프로그램할 때보다 메모리의 크기가 커져야 한다. 본 논문에서는 선택 시퀀스의 기능을 단일 시퀀스로 구현하여 메모리의 크기를 줄여서 메모리의 효율을 향상시키는 방법을 제시하고, 실례를 통해 타당성을 확인하였다.

Optimum maintenance scenario generation for existing steel-girder bridges based on lifetime performance and cost

  • Park, Kyung Hoon;Lee, Sang Yoon;Yoon, Jung Hyun;Cho, Hyo Nam;Kong, Jung Sik
    • Smart Structures and Systems
    • /
    • 제4권5호
    • /
    • pp.641-653
    • /
    • 2008
  • This paper proposes a practical and realistic method to establish an optimal lifetime maintenance strategy for deteriorating bridges by considering the life-cycle performance as well as the life-cycle cost. The proposed method offers a set of optimal tradeoff maintenance scenarios among other conflicting objectives, such as minimizing cost and maximizing performance. A genetic algorithm is used to generate a set of maintenance scenarios that is a multi-objective combinatorial optimization problem related to the lifetime performance and the life-cycle cost as separate objective functions. A computer program, which generates optimal maintenance scenarios, was developed based on the proposed method using the life-cycle costs and the performance of bridges. The subordinate relation between bridge members has been considered to decide optimal maintenance sequence and a corresponding algorithm has been implemented into the program. The developed program has been used to present a procedure for finding an optimal maintenance scenario for steel-girder bridges on the Korean National Road. Through this bridge maintenance scenario analysis, it is expected that the developed method and program can be effectively used to allow bridge managers an optimal maintenance strategy satisfying various constraints and requirements.

Integrating Machine Reliability and Preventive Maintenance Planning in Manufacturing Cell Design

  • Das, Kanchan;Lashkari, R.S.;Sengupta, S.
    • Industrial Engineering and Management Systems
    • /
    • 제7권2호
    • /
    • pp.113-125
    • /
    • 2008
  • This paper presents a model for designing cellular manufacturing systems (CMS) by integrating system cost, machine reliability, and preventive maintenance (PM) planning. In a CMS, a part is processed using alternative process routes, each consisting of a sequence of visits to machines. Thus, a level of 'system reliability' is associated with the machines along the process route assigned to a part type. Assuming machine reliabilities to follow the Weibull distribution, the model assigns the machines to cells, and selects, for each part type, a process route which maximizes the overall system reliability and minimizes the total costs of manufacturing operations, machine underutilization, and inter-cell material handling. The model also incorporates a reliability based PM plan and an algorithm to implement the plan. The algorithm determines effective PM intervals for the CMS machines based on a group maintenance policy and thus minimizes the maintenance costs subject to acceptable machine reliability thresholds. The model is a large mixed integer linear program, and is solved using LINGO. The results point out that integrating PM in the CMS design improves the overall system reliability markedly, and reduces the total costs significantly.

최소차량운용문제에 대한 실용적 해법 (A pragmatic algorithm for the Minimum Railway Stock Maintenance Routing Problem)

  • 홍성필;김경민;이경식;박범환;홍순흠
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2006년도 춘계공동학술대회 논문집
    • /
    • pp.25-32
    • /
    • 2006
  • Given a schedule of train to be routed by a Railway Stock, Railway Stock Routing Problem determine a sequence of train while satisfying turnaround time and maintenance restrictions. The objective is to minimize the Railway Stock during a week and each day simultaneously. And we prove that Railway Stock Routing Problem with maintenance restrictions is NP-hard. In this paper, we present two stage approaches that solve the Railway Stock Routing Problem in a reasonable time. In first stage we relax maintenance restrictions and formulate as a Min-cost-flow problem. Then, in the second stage, we attempt to satisfy maintenance restrictions using ours heuristic algorithm. We show the computational result of applying to an actual train schedule data.

  • PDF

철도 위험도 통합 평가 방법 및 도구 개발 (Development of Integrated Method and Tool for Railway Risk Assessment)

  • 한상훈;안광일;왕종배;이호중
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1132-1139
    • /
    • 2006
  • Railway risk is evaluated by a method of linking event trees and fault trees as the general PSA(Probabilistic Safety Assessment) model for the risk assessment of complex systems. Accident scenarios causing undesirable events are modeled by event trees comprised of several accident sequences. Each branch located in the accident progression of the event tree is modeled by an fault tree or can be represented by some value too simply. We usually evaluate the frequency of the whole sequence by adding them after calculating the frequency of each sequence at a time. However, since there are quite a number of event trees and fault trees in the railway risk assessment model, the number of sequence to evaluate increases and preparation for the risk assessment costs much time all the more. Also, it may induce errors when analysts perform the work of quantification. Therefore, the systematic maintenance and control of event trees and fault trees will be essential for the railway risk assessment. In this paper we introduce an integrated assessment method using one-top model and develop a risk assessment tool for the maintenance and control of the railway risk model.

  • PDF

공정제어에서 선택시퀀스를 위한 효율적인 리모트 콘트롤 제어방법 (An Efficient Method of Remote Control for Select Sequence in Process Control)

  • 공헌택;김치수;유정봉
    • 한국산학기술학회논문지
    • /
    • 제11권1호
    • /
    • pp.107-112
    • /
    • 2010
  • PLC를 사용한 제어시스템에서 SFC 언어를 사용하면 전체 공정의 흐름을 이해하기 쉽고 유지보수가 용이하다. SFC 언어는 단일 시퀀스, 선택 시퀀스, 병렬 시퀀스로 나누어지고, 여러 조건에 맞게 처리하는 선택시퀀스로 프로그램 할 때 선택분기 스텝에 에러가 발생하면 전체 공정이 정지하게 된다. 이 에러스텝이 전체 공정에 크게 영향을 안주는 공정이라면 전체 공정을 정지시키지 않고 에러를 처리하면 손실은 줄어들게 된다. 본 논문에서는 선택시퀀스에서 리모트 콘트롤을 사용하여 선택시퀀스를 효율적으로 제어하는 방법을 제시하고 적용 예를 통해 그의 타당성을 확인하였다.

비연속 시스템 제어를 위한 확장된 safe petri net 모델과 실시간제어를 위한 scanning algorithm의 개발 (Development of extended safe petri net model for discrete system control and scanning algorithm for real time control)

  • 황창선;서정일;이재만
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1988년도 한국자동제어학술회의논문집(국내학술편); 한국전력공사연수원, 서울; 21-22 Oct. 1988
    • /
    • pp.338-342
    • /
    • 1988
  • Recently, in sequence control systems, high flexibility and maintenance of control software are required. This is because product life cycles become shorter and control specification must be changed frequently. The authors extend the concept of Safe Petri Net to develop the design and analysis tool for sequence control systems taking the safeness and notation of input/output functions into consideration. Extended Safe Petri Net (S-Net) is proposed as such a new graph model and real time scanning algorithm based on S-Net is developed.

  • PDF

SFC로 설계된 공정제어에서 Remote Control에 의한 선택 시퀀스 제어 방법 (A Method of Select Sequence Control by Remote Control in Process Control designed by SFC)

  • 유정봉
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.134-136
    • /
    • 2007
  • Sequential Function Chart(SFC) is very easy to grasp the sequential flow of control logic and has the compatability for a maintenance, In process control, when an error is occurred, to execute other routine by force, we control the process by remote control. In this paper, we proposed the method of select sequence control by remote control in process control designed by Sequential Function Chart(SFC).

  • PDF