• Title/Summary/Keyword: Settlement Structure

Search Result 464, Processing Time 0.032 seconds

The study changes of the settlement structure on Bronze Age in Yongdong area (영동지역 청동기시대 취락구조의 변천)

  • Park, Yeong-Gu
    • KOMUNHWA
    • /
    • no.69
    • /
    • pp.5-40
    • /
    • 2007
  • The research against Youngdong area Bronze Age settlement structure the condition where the investigation against the area and the remains which are limited becomes accomplished and Only the dwelling site will be investigated from the early settlement of most and recognition there is not a possibility which it will investigate synthetically. The Early settlement to the time which reaches the size of the settlement is small and From Bangnae-ri phases the house possession area increases inside the hill and it follows on south and if dwelling site numbers under increasing, from the aspect where the size of the settlement is magnified seems and it is a position. The Middle settlement currently was confirmed as the beginning from the room village A ruins, it investigates a settlement structure to, the increase of data is necessary. Is Pottery with clay stripes, phases the Later Settlement which Dwelling site, Storeage, Earthenware Kiln, Ditch enclosure and Tomb, the Public dwelling site back large scale Pottery with clay stripes settlement of formation will be investigated from Bangdong-ri settlements which correspond to Songhyun-ri settlement which is a hill characteristic settlement which is located in rivers circumference and the higShland characteristic settlement to provide the data the cultural aspect and character and a settlement structure of Bronze Age postscript and it will be able to grasp.

  • PDF

Settlement behavior and controlling effectiveness of two types of rigid pile structure embankments in high-speed railways

  • Wang, Changdan;Zhou, Shunhua;Wang, Binglong;Guo, Peijun;Su, Hui
    • Geomechanics and Engineering
    • /
    • v.11 no.6
    • /
    • pp.847-865
    • /
    • 2016
  • In this study, a series of geotechnical centrifugal tests were conducted to investigate the effectiveness of settlement control of two types of rigid pile structure embankments (PRSE) in collapsible loess under high-speed railway embankments. The research results show that ground reinforcement is required to reduce the post-construction settlement and settlement rate of the embankments. The rigid pile structure embankments using rigid piles can substantially reduce the embankment settlement in the construction of embankments on collapsible loess, and the efficiency in settlement reduction is affected by the pile spacing. The pile-raft structure embankments (PRSE) have much stronger ability in terms of the effectiveness of settlement control, while the pile-geogrid structure embankments (PGSE) provides rapid construction as well as economic benefits. Rational range of pile spacing of PRSE and PGSE are suggested based on the requirements of various railways design speeds. Furthermore, the time effectiveness of negative skin friction of piles and the action of pile-cap setting are also investigated. The relevant measures for improving the bearing capacity and two parts of transition zone forms as positive control mean have been suggested.

Experimental investigation of earth pressure on retaining wall and ground settlement subjected to tunneling in confined space

  • Jinyuan Wang;Wenjun Li;Rui Rui;Yuxin Zhai;Qing He
    • Geomechanics and Engineering
    • /
    • v.32 no.2
    • /
    • pp.179-191
    • /
    • 2023
  • To study the influences of tunneling on the earth pressure and ground settlement when the tunnel passes through the adjacent underground retaining structure, 30 two-dimensional model tests were carried out taking into account the ratios of tunnel excavation depth (H) to lateral width (w), excavation width (B), and excavation distance using a custom-made test device and an analogical soil. Tunnel crossing adjacent existing retaining structure (TCE) and tunnel crossing adjacent newly-built retaining structure (TCN) were simulated and the earth pressure variations and ground settlement distribution during excavation were analyzed. For TCE condition, the earth pressure increments, maximum ground settlement and the curvature of the ground settlement curve are negatively related to H/B, but positively related to H/s and H/w. For TCN condition, most trends are consistent with TCE except that the earth pressure increments and the curvature of ground settlement curve are negatively related to H/w. The maximum ground settlement is larger than that observed in tunnel crossing the existing underground structure. This study provides an assessment basis for the design and construction under confined space conditions.

A Study on Behavior of Elastic Settlement of Coastal Structure on Sandy Ground (모래층 지반 안벽구조물의 탄성침하거동 연구)

  • Yoo, Nam-Jae;Jun, Sang-Hyun;Jeon, Jin-Yong
    • Journal of Industrial Technology
    • /
    • v.27 no.B
    • /
    • pp.201-208
    • /
    • 2007
  • This paper is research results of investigating the elastic settlement behavior of the coastal caisson structure built on the sandy deposit by comparing results of centrifuge model experiments and those of existing methods of estimating elastic settlement. Basic soil property tests such as specific gravity test, grain size distribution test and organic content test with disturbed soil sampled from the site were carried out. The centrifuge experiment of model satisfying the required design criteria was performed under 50 of artificial accelerated gravitational force condition. The Centrifuge model experimental results were compared and analyzed with the current methods of estimating settlement based on the elastic modulus obtained from the results of odeometer tests and empirical methods from literature reviews.

  • PDF

Settlement Evaluation of Caisson-Type Quay Wall Using PSI of Velocity During Earthquake (지진시 속도의 PSI를 활용한 케이슨식 안벽의 침하량 평가 )

  • Gichun Kang;Hyunjun Euo;Minje Baek;Hyunsu Yun;Jungwook Choi;Seong-Kyu Yun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.2
    • /
    • pp.71-83
    • /
    • 2023
  • It is very important to predict the amount of settlement in order to maintain the function of the coastal structure. Finite element analysis methods and real and model experiments are used as methods for this, but this has the disadvantage of requiring a lot of cost and time. Therefore, this study was conducted for the purpose of a simple formula proposal that can easily predict the amount of settlement of the caisson-type quay wall structure. In the research process, after calculating the PSI (Power Spectrum Intensity) of the velocity, the amount of settlement of the structure is calculated by substituting it into the simple formula of the existing gravity breakwater. By comparing and analyzing the amount of settlement of the structure obtained through numerical analysis, it was confirmed that the error between the amount of settlement of the existing simple formula and the amount of settlement of the numerical analysis was large, and it was confirmed that the background could not be considered in the case of the existing simple formula. Therefore, this study proposed a correction factor for the background of the quay wall structure, indicating a simple formula that can obtain the amount of settlement of the caisson-type quay wall structure. Compared to the numerical analysis settlement amount, it was judged that this simple formula had sufficient precision in calculating the caisson-type quay wall settlement amount. In addition, facilities vulnerable to earthquake resistance can be easily extracted in situations where time and cost are insufficient, and it is expected to be used as a screening technique.

Settlement Behavior of Wing-wall type Foundation on Soft Grounds (연약지반에서 날개벽 기초의 침하량 산정)

  • Jang, Si-Kyung;Lee, Kwang-Yeol;Hwang, Jae-Hong;Chung, Chin-Gyo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1164-1169
    • /
    • 2009
  • Piled raft foundation is commonly used for structure on deep soft soil deposit rather than end bearing piles to control differential settlement. However, it is still expensive for light weight structures. Wing-wall type foundation has been successfully applied to reduce average settlement for light weight structure. This study will further investigate this type of foundation using bench scale experiments on clay and sand. Numerical analysis and approach method are used to verify load settlement curve of wing-wall foundation on experimentally study. Furthermore, normalized settlement curves are applied to define prediction of settlement on wing-wall foundation. In the result settlement on wing-wall foundation can be effectively done by increasing the length of wall instead of number of walls and equation for calculating average settlement can be derived using normalized load settlement curve.

  • PDF

Experimental Study to Evaluate the Adjacent Construction Effect on the Bearing Capacity and Settlement of Nearby Foundation Structures (근접시공이 기초 구조물의 지지력 및 침하량에 미치는 영향 평가를 위한 실험 연구)

  • Baek, Mun-Kyeong;Lee, Sang Duk;Chang, Ilhan
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.8
    • /
    • pp.15-24
    • /
    • 2021
  • Recently, cases for inevitable adjacent construction are increasing due to the limited spaces in urban area. When a new structure is constructed near an existing structure, interference effects induced by the pre-existing structure should be considered. Thus, numbers of studies have been conducted to investigate the effects of adjacent construction, while laboratory scales studies are not well reported. In this study, laboratory scale experiments have been conducted to investigate the bearing capacity and settlement variations with different adjacent construction cases. Results show an optimistic ground bearing capacity increase of the new foundation structure due to the existing foundation structure, while concerns on the increased settlement of the pre-existing structure. Thus, both bearing capacity of the new foundation structure and subsequent settlement of the existing foundation structure have to be considered when assessing the technical applicability of adjacent structure construction on site.

Long-term Settlement of High Speed Railway Embankment Compacted under Dry/Wet Condition (고속철도 토공구간 쌓기 재료의 다짐함수비 조건에 따른 장기침하 특성)

  • Lee, Sung-Jin;Lee, Il-Wha;Lee, Jin-Uk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1268-1277
    • /
    • 2008
  • Recently, the high speed railway comes into the spotlight as the important and convenient traffic infrastructure. In Korea, Kyung-Bu high speed train service began in about 400km section at 2004, and the Ho-Nam high speed railway will be constructed by 2017. The high speed train will run with a design maximum speed of 300-350km/hr. Since the trains are operated at high speed, the differential settlement of subgrade under the rail is able to cause a fatal disaster. Therefore, the differential settlement of the embankment must be controlled with the greatest care. Furthermore, the characteristics and causes of settlements which occurred under construction and post-construction should be investigated. A considerable number of studies have been conducted on the settlement of the natural ground over the past several decades. But little attention has been given to the compression settlement of the embankment. The long-term settlement of compacted fills embankments is greatly influenced by the post-construction wetting. This is called 'hydro collapse' or 'wetting collapse'. This wetting collapse problem for the compressibility of compacted sands, gravels and rockfills, has been recognized by several researchers. For this wetting settlement problem, we showed the test results carried out with 4 fill materials. These tests were performed under the condition that the fill materials were inundated at the first wetting. Subsequently, in this study, we investigated the long-term settlement characteristics of the fill materials under the repeated partial wetting and rising of the ground water table happend by rainfall.

  • PDF

An Application of Micropile to Restrain the Settlement of Structure on the Ground Surface caused by Shield Tail Void (실드테일보이드에 의해 발생하는 지표구조물의 침하 억제를 위한 마이크로파일의 적용)

  • 임종철;윤이환;박이근;고호성
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.177-184
    • /
    • 1999
  • In soft ground tunneling, shield method is very good for safety of neighboring structures. Although shield tunnel method has the merits to minimize the deformation of ground around tunnel, ground deformations occurred until the material grouted in tail void hardens are inevitable. In this study, the effects of micropile used as one method to restrain the settlement of neighboring structures by the tail void are studied by laboratory model tests. As a basic test result, the effective direction of micropile and the restraint rate of settlement by micropile reinforcement are known.

  • PDF

Tunnel Convergence and Crown settlement using 3D Laser Scanning (고밀도 레이저 측량을 이용한 터널의 천단 및 내공 변위 관측)

  • Lee Ja-One;Jang Sang-Kyu;Lim Young-Bin;Moon Doo-Youl;Yun Bu-Yeol
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.507-512
    • /
    • 2006
  • There are many risks in constructing tunnel-structure. To prevent these risks from occurring and secure safety, the precise and rapid survey of inside displacement of the tunnel is required. But nowadays the measurement of the crown settlement, convergency, and surface settlement depends on general kinds of method which use total station or level. In the way to provide data about maintaining structure according to recent improvement and progress of measuring technology, 3D laser scanning is used. It solves the problem of reliability in measuring displacement of existing structure, provides material that enables to estimate shape change of structure visually, and makes it possible to deliberate speedy countermeasure. By this three dimensioning it is possible to make efficient use of structure maintenance and field measurement

  • PDF