• Title/Summary/Keyword: Size of the Construction Company

Search Result 99, Processing Time 0.03 seconds

A study on management and judgement of defect-repair in private housing construction company (민간 주택건설회사의 하자보수에 대한 인식 및 실태에 관한 연구)

  • 윤정숙
    • Journal of the Korean Home Economics Association
    • /
    • v.33 no.5
    • /
    • pp.143-151
    • /
    • 1995
  • The purpose of this study is to suggest a defect-repair management and judgement of apartment housing for the private housing construction company. The objectives are : 1) to investigate how the defect-repair were managed and 2) to suggest the range, period of defect-repair and the proper managial size of housing company. Data were collected by the interviews from the heads of management departments of housing construction companies. Twenty-one companies selected were divided into three groups according to the amount of housing supply. Major result were as follows : 1) departments of defect-repair in housing construction company are divided into sub-system according to the size of housing supply. 2) the judgement of the range and period of defect-repair are extracted. They are, according to the order of their importance, constructional defect, functional defect, aesthetical defect and the defect in use.

  • PDF

Construction Company TQM Impact on the Activities Performance (건설회사 TQM 활동이 성과에 미치는 영향)

  • Kim, Ja-Yeon;Kang, In-Won
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.319-330
    • /
    • 2015
  • This study examines the factors configuration management quality of the construction company, and to analyze the impact of these factors on Project Performance and Company Performance. That quality construction management configuration factors, chief executives, corporate strategy, organizational management, information technology, and partners five variables, Project Performance variables, process management, quality management, cost management, safety management, environmental management five variables, and Company Performance parameters of financial competence and organizational satisfaction, quality of work three variables, the overall causal relationship between the presence of specific activities and management quality, classified according to the size of the company were verified by the difference in impact between the two groups.

Technology for the Detection of Corrosion Defects in Buried Pipes of Nuclear Power Plants with 3D FEM (3D 유한요소법을 이용한 원전 매설배관 부식결함 탐상기술 개발)

  • Kim, Jae-Won;Lim, Bu-Taek;Park, Heung-Bae;Chang, Hyun-Young
    • Corrosion Science and Technology
    • /
    • v.17 no.6
    • /
    • pp.292-300
    • /
    • 2018
  • The modeling of 3D finite elements based on CAD data has been used to detect sites of corrosion defects in buried pipes. The results generated sophisticated profiles of electrolytic potential and vectors of current distributions on the earth surface. To identify the location of defects in buried pipes, the current distribution on the earth surface was projected to a plane of incidence that was identical to the pipe locations. The locations of minimum electrolytic potential value were found. The results show adequate match between the locations of real and expected defects based on modeling. In addition, the defect size can be calculated by integrating the current density curve. The results show that the defect sizes were $0.74m^2$ and $0.69m^2$, respectively. This technology may represent a breakthrough in the detection of indirect damage in various cases involving multiple defects in size and shape, complex/cross pipe systems, multiple anodes and stray current.

Impact of Fluctuations in Construction Business on Insolvency of Construction Company by Size (건설경기 변동이 규모별 건설기업 부실화에 미치는 영향 분석)

  • Lee, Sanghyo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.8
    • /
    • pp.147-156
    • /
    • 2016
  • This study analyzed the impact of changes in the construction business on construction company insolvency according to their size using the vector error correction model. First, this study applied EDF (Expected Default Frequency), which was calculated by KMV (Kealhofer, McQuown and Vasicek) model, as a variable to indicate the insolvency of construction companies. This study set 30 construction companies listed to KOSPI/KOSDAQ for estimating the EDF by size and construction companies were divided into two groups according to their size. To examine the construction business cycles, the amount of construction orders according to the type-residential, non-residential, and civil work- was used as a variable. The serial data was retrieved from TS2000 established by the Korea Listed Companies Association (KLCA), Statistics Korea. The analysis period was between the second quarter of 2001 and fourth quarter of 2015. As a result of calculating the EDF of construction companies by size, as it is generally known, the large-sized construction companies showed lower levels of insolvency than relatively smaller-sized construction companies. On the other hand, impulse response analysis based on VECM confirmed that the level of insolvency of large-scaled companies is more sensitive to business fluctuations than relatively smaller-sized construction companies, particularly changes in the residential construction market. Hence it is a major factor affecting the changes in insolvency of large-sized construction companies.

Analyzing on the Fluctuation Characteristics of Management Condition of Construction Company (건설업체 경영상태 변동에 대한 특성 분석)

  • Jang, Ho-Myun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1118-1125
    • /
    • 2014
  • The past IMF foreign exchange crisis and subprime financial crisis had a big influence on variability of macroeconomics, even if the origin of its occurrence might be different. This not only had a significant infrequence on the overall industries, but also produced many insolvent companies by being closely linked with a management environment of an individual construction company leading the construction industry. The purpose of this research is to investigate characteristics of management condition of construction company according to the size of construction company using KMV model developed on the basis of the Black & Scholes option pricing theory. This research has set 28 construction companies listed to KOSPI/KOSDAQ for applying the KMV model and measuring the level of the default risk of construction companies. The data was retrieved from TS2000 established by Korea Listed Companies Association (KLCA), Statistics Korea. The analysis period is between first quarter of 2004 and fourth quarter of 2010. This research examine characteristics of the level and fluctuation process of the management condition of construction company according to the size of construction company.

Comparative Analysis of the Weights of Performance Measures Index According to the Size of Construction Companies (건설기업의 규모에 따른 성과지표 가중치 비교분석)

  • Jung Won-Jo;Yu, Il-Han;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.419-422
    • /
    • 2004
  • Qualitative management structure of construction companies in Korea are relatively inadequate in comparison with quantitative growth. To improve qualitative management structure, we need to make impartial performance measurement system which arouse participants responds. It is important to select and decide performance measurement index to company and participants. And it is also important to take the weights. For that, we figure out the weights of performance measurement with HSC by Kaplan & Norton.'1'o find out the characteristics of the weights which was classified according to size of the construction company, we analyse and compare with each weights. The result of this Paper will contribute to operate performance measurement system that make raise efficiency and maximize the performance of companies.

  • PDF

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

Comparison Analysis for the Safety Climate Level of Construction Company According to Business Size in South Korea (국내 건설기업의 규모별 안전분위기 인식 수준 비교 연구)

  • Son, Seung-Hyun;Ha, Sun-Geun;Choi, Sang-Cheol;Kim, Sun-Kuk;Son, Ki-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.4
    • /
    • pp.373-382
    • /
    • 2019
  • In order to reduce the accident rate of construction in South Korea, governments and its affiliates have been tried to establish a safety culture, however they reached the limit. In addition, researchers recently have conducted regarding the safety climate and concluded that safety climate effect on the safety performance. Although organizational culture and enterprise types are different based on business size, they generalized the level of safety climate with a group only. Therefore, in order to solve this issue, the objective of this study is to analyze the safety climate level of construction company depending on business size in South Korea. In addition, the improvements are suggested on the level of safety climate after problems are drawn from considering organizational culture, enterprise type and construction industry in South Korea. In the future, this study will be used as a baseline for the effects of the safety climate on the safety performance in construction site based on business size.

A Study of Models for Marketing Strategy in the Eco-friendly Apartment Housing Using Discriminant Analysis (판별분석을 이용한 친환경 아파트의 마케팅 전략에 관한 연구)

  • Kil, Ki-Suck;Lee, Joo-Hyung
    • KIEAE Journal
    • /
    • v.7 no.3
    • /
    • pp.11-20
    • /
    • 2007
  • The purpose of this study is to analyse the effects of the eco-friendly factors on the apartment housing price rise and to suggest the desirable way of marketing strategy for apartment housing. For the analysis, the data of apartment sites in Seoul had been collected from September 2006 to February 2007. The data consisted of 95 apartment sites in Seoul. Data were analyzed with descriptives, crosstabs, and discriminant analysis by SPSS/PC for Window. Following result was obtained. The eco-friendly apartment housing price rate in Seoul was determined by eco-friendly landscape, green space rate, house unit size, installment sale price per pyeong, floor space index, distance from subway station when it was not considered the impact of building age, construction company's brand, and autonomous districts. Findings of this research can provide valuable information for marketing strategy of housing construction company.

The Study on Problems in Bidding Guideline and Suggestion for Improvement in Architectural Turnkey project in Construction - Focused on Preventing Claim- (건축턴키공사 입찰안내서의 문제점과 개선방안에 관한 연구 - 클레임예방을 중심으로 -)

  • Yoon Jun-Seon
    • Journal of Arbitration Studies
    • /
    • v.15 no.3
    • /
    • pp.303-324
    • /
    • 2005
  • Turnkey project in construction which accounts for about $10\%$ of the total annual construction orders in the nation is expected to grow in size as an effort to strengthen international competitiveness and improve quality of construction work. However, problems of turnkey project in construction raise concern for many possible cases of possible claims. Based on the understanding that bidding guidelines which plays a critical role in turnkey project in construction actually contain some unequal clauses and causes for problems which undermine development of turnkey construction and further create possible cases of claims, the paper aims to identify and analyze the unequal clauses and problems contained in the guidelines in order to make suggestions for improvement. Among all the turnkey construction orders that has been placed since 2000 when domestic turnkey project in construction became relatively formulated, 13 constructions costing more than 50 billion won were selected for this study since their construction scale were large enough that the bidding guidelines for them were regarded as containing little difference among one another. In order to enhance construction technology and to prevent claims while trying to achieve the original purpose of Turnkey system, the parties involved in or schedule to take part in Turnkey project including ordering institution, Construction Company and Design Company should make an effort to have more reasonable bidding guidelines drawn up.

  • PDF