• Title/Summary/Keyword: Start-up operation

Search Result 279, Processing Time 0.029 seconds

A Study on the Automatic Start-up of a Drum-type Boiler Using Fuzzy Logic (퍼지 논리를 이용한 드럼형 보일러의 자동기동에 관한 연구)

  • ;;;Zeungnam Bien
    • Journal of the Korean Institute of Telematics and Electronics B
    • /
    • v.30B no.2
    • /
    • pp.87-96
    • /
    • 1993
  • Because of the complexity, nonlinearity and long-time delay of power plant, the star-up operation of a fossil power plant is very difficult to automate. So the start-up operation is always carried out by the skilled human operators, who utilize their knowledges and experiences for the predesigned start-up schedules and procedures. In this paper, a fuzzy logic controller is designed for the start-up operation of the power plant. And the operators experiences are modeled in terms of fuzzy sets and variables. To validate the controller, a drum-type boiler of the Seoul Power Plant is constructed via the signal flow diagram. Using the model, the suggested automatic start-up operation is verified, and the results are also presented.

  • PDF

A Study on the Start-up and Shut-down Characteristics for PEMFC System (고분자 연료전지시스템의 기동 및 정지특성에 관한 연구)

  • Lee, Jung-Woon;Seo, Won-Seok;Kim, Young-Gyu
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2008.05a
    • /
    • pp.29-32
    • /
    • 2008
  • Testing was conducted to determine the performance of a residential fuel cell system when subjected to DSS and WSS operation, especially for start-up and shut-down characteristics. In terms of start-up time, it took about 70min to start output power generation and stably to reach 1kW at cold start. Measurement of the characteristics of heat and power generation were carried out at start-up and shut-down time. Fuel gas is used for heating both reformer and stack from start-up to the beginning of power generation. In terms of start-up and shut-down characteristics, it was important to control the reformer temperature precisely. The average output water temperature during the rated output operation(960W) was $63.2^{\circ}C$ constantly. The results of the investigation are being used to develop a new test protocols for residential fuel cell system.

  • PDF

Modeling for the Automation of Start-up Operation in Boiler Plant (보일러 플랜트의 Start-Up 운전자동화를 위한 모델링)

  • 윤영진;황규석
    • Journal of the Korean Society of Safety
    • /
    • v.12 no.1
    • /
    • pp.60-70
    • /
    • 1997
  • Since, human error is a major factor contributing to disaster during start-up of operation in Boiler plant. it is necessary to develop an automation system which prevent mode of operation that are known to be dangerous and to bring a loss of energy. The aim of this study is to suggest a model for the computer-aided synthesis of operation sequence as a part of automation system for start-up operation. Synthesis is accomplished by the formation of a hierarchical network of goals which decide sequence of operations. Hierarchical Network is formed by using method which upper goals ( i.e. upper operation al situation) are classified by the function of themselves into lower goals (i.e. lower operational situation). Knowledge for deciding operation sequence is generated by putting In order the knowledge of hazard operation and energy management.

  • PDF

A Comparative Study on Start-up and Normal Operation Data for Phosphorus Removal in WWTPs (인 처리시설 시운전 및 정상운전 자료 비교·분석 연구)

  • Yun, Soyoung;Ryu, Jaena;Kim, Jonguk;Oh, Jeill
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.113-120
    • /
    • 2013
  • This study aimed to obtain quantitative data for WWTP operators in phosphorus removal process. This was done by reviewing and comparing phosphorus removal efficiency(%), coagulants dosage(Al/P and $Al_2O_3$(mg/L)), sludge production($kg/m^3$), and operation cost($won/m^3$) of start-up and normal operation data. Phosphorus removal efficiency of all tertiary treatment process was up to 70 ~ 89 % in start-up and normal operation. Average molar ratio(Al/P) was similar as 5 in both operations, but average coagulants dosage (mg/L) of start-up (8.5 mg/L) was higher than normal operation (6.2 mg/L). Average operation cost was higher for start-up ($33.6won/m^3$) than normal operation ($28.4won/m^3$), while electricity cost required for the normal operation ($9.0won/m^3$) was higher by $3.5won/m^3$.

Start-up Strategy for the Successful Operation of Continuous Fermentative Hydrogen Production (연속 혐기성 수소발효 공정에서 성공적인 start-up 방법)

  • Lee, Chang-Kyu
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.24 no.2
    • /
    • pp.99-106
    • /
    • 2013
  • The variations of performance and metabolites at an early stage were investigated for the successful start-up technology in continuous fermentative hydrogen production. Unsuccessful start-up was observed when the operation mode was changed from batch to continuous mode after the yield was reached to 0.5 mol $H_2$/mol $hexose_{added}$ by batch mode. $H_2$ production continued till 12 hours accompanied by butyrate production, but did not last with propionate production increase. It was suspected that the failure was due to the regrowth of propionic acid bacteria during batch mode which were inhibited by heat-shock but not completely killed. Thus, successful start-up was tried by early switchover from batch to continuous operation; continuous operation was started after the $H_2$ yield was reached to 0.2 mol $H_2$/mol $hexose_{added}$ by batch mode. Although $H_2$ production rate decreased at an early stage, stable $H_2$ yield of 0.8 mol $H_2$/mol $hexose_{added}$ was achieved after 10 days by lowering down propionate production. And it was also concluded that the reason for $H_2$ production decrease at an early stage was due to alcohol production by self detoxification mechanism against VFAs accumulation.

Simulator for a Micro-Turbine during Start-up by Constant Power Output Motoring Method using Starter (시동기의 정 출력 시동 기법에 의한 마이크로터빈 시동 구간의 운전 시뮬레이터 개발)

  • Rho, Min-Sik
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.58 no.10
    • /
    • pp.2028-2037
    • /
    • 2009
  • This paper presents the simulator for dynamic modeling of a MT(micro turbine) during start-up period. The simulator is implemented by modeling a dynamic power of main components of a MT including compressor, combustor and turbine. A modeling for a MT under steady state operation can be accurately built from thermodynamics analysis. But dynamic modeling during start-up period is very difficult because efficiency of main components is very low and the designed value has big error and nonlinear characteristics during start-up. In this paper, new method without using thermodynamics analysis during start-up is proposed for the simulator. The power models of main components are derived from analysis of the experimental operation data by test motoring using a electric starter under constant power output. The simulator is developed using MATLAB/Simulink. For constant power output control, sensorless vector inverter is designed and algorithms for starting from stall and method for controling a output power are proposed. The performance of developed simulator is verified by comparing experimental and simulation start-up results.

A Study on BI's Plan to Achieve the Performance of Start-up Companies (BI의 창업기업 성과달성 방안에 관한 연구)

  • Hwang, Kyoo-il
    • Journal of Venture Innovation
    • /
    • v.5 no.1
    • /
    • pp.75-90
    • /
    • 2022
  • Start-up is a very important task for the development of the country as well as individuals for entrepreneurs with novel ideas, experiences, and know-how. Most of the new start-ups often have no start-up experience, and the government and universities operate start-up incubator centers so that start-up companies can grow and develop. The goal is to improve the success rate of technology-based start-ups. It supports various needs of start-up companies and supports start-up companies to succeed by enabling them to maximize their potential. The expected effect of the start-up incubator center can be said to be a contribution to the development of the national economy through the revitalization of start-ups. This study aims to consider ways to achieve performance through the efficient operation of domestic start-up incubator centers.

Development of Start-up Process Repository System (스타트업 프로세스 리파지토리 시스템 개발)

  • Sung, Sanghyun;Sohn, Youngwoo
    • Knowledge Management Research
    • /
    • v.20 no.3
    • /
    • pp.107-117
    • /
    • 2019
  • Successful start-ups are driven by opportunities, teams, and the resources needed to grow the business. Systematic business process management is required to maximize the efficiency of business operations. However, the existing entrepreneurial process research has limitations that it is difficult to intuitively and dynamically provide the necessary information for start-up operation, and it is necessary to define necessary information (resources, stakeholders, activities). In this study, we suggest the "Start-up Process Repository System" which overcomes limitations of existing entrepreneurial process research. The architecture for the Start-up Process Repository System provides five layers and enables each layer to interact four interfaces between each layer. This study improves start-ups' accessibility to the start-up business process repository created from the existing repository architecture and increases the utility derived from it by providing methodologies for components that offer useful start-up knowledge.

Optimal Operation Model of Heat Trade based District Heating and Cooling System Considering Start-up Characteristic of Combined Cycle Generation (가스터빈 복합발전의 기동특성을 고려한 열거래 기반 지역 냉난방 시스템의 최적 운영 모델)

  • Kim, Jong-Woo;Lee, Ji-Hye;Kim, Hak-Man
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.11
    • /
    • pp.1610-1616
    • /
    • 2013
  • Recently, district heating and cooling (DHC) systems based on combined cycle generation (CCG) providers are increasing in Korea. Since characteristics of combined heat and power (CHP) generators and heat demands of providers, heat trading between DHC providers based on the economic viewpoint is required; the heat trading has been doing. In this paper, a mathematical model for optimal operation based on heat trading between DHC providers is proposed. Especially, start-up characteristic of CCG is included. The operation model is established by mixed integer linear programming (MILP).

A Study on the Chilling Start-up Characteristics and Performance of a Gas Loaded Heat Pipe (가스내장 히트파이프의 냉시동특성과 성능에 관한 연구)

  • Hong, Sung-Eun;Kang, Hwan-Kook
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.18 no.11
    • /
    • pp.915-922
    • /
    • 2006
  • Considering heat pipe design principles in fabrication and operational performances, water is one of the most recommended working fluids to make mid to low tempera lure heat pipes. But the conventional water heat pipes might encounter the failure in a cold start-up operation when socked at a chilling temperature lower than the freezing point. If they are subjected to a heat supply for start-up at a temperature around $-20^{\circ}C$, the rate of the vapor flow and the corresponding heat transfer from the evaporator to the condenser is so small that the vapor keeps to stick on the surface of the chilling condenser wall, forming an ice layer, resulting in a liquid deficiency in the evaporator. This kind of problems was resolved by Kang et al. in 2004 by adopting a gas loading heat pipe technology to the conventional water heat pipes. This study was conducted to examine a chilling start-up procedure of gas loading heat pipes by investigating the behaviors of heat pipe wall temperatures. And the thermal resistance of the gas loaded heat pipe that depends on the operating temperatures and heat loads was measured and examined. Two water heat pipes were designed and fabricated for the comparison of performances, one conventional and the other loaded with $N_2$ gas. They were put on start-up test at a heat supply of 30 W after having been socked at an initial temperature around $-20^{\circ}C$. It was observed that the gas loaded one had succeeded in chilling start-up operation.