• Title/Summary/Keyword: Stream monitoring

Search Result 486, Processing Time 0.032 seconds

Relationship between the Flow data on the Unit Watersheds and on the Stream Flow Monitoring Network (수질오염총량관리 단위유역 유량자료와 하천유량 측정망 자료의 연계성 분석)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.1
    • /
    • pp.55-65
    • /
    • 2013
  • It is very difficult to apply stream flow data directly to the management of Total Maximum Daily Loads because there are some differences between the unit watershed and the stream flow monitoring network in their characteristics such as monitoring locations and its intervals. Flow duration curve can be developed by linking the daily flow data of stream monitoring network to 8 day interval flow data of the unit watershed. This study investigated the current operating conditions of the stream flow monitoring network and the flow relationships between the unit watershed and the stream flow monitoring network. Criteria such as missing and zero value data, and correlation coefficients were applied to select the stream flow reference sites. The reference sites were selected in 112 areas out of 142 unit watersheds in 4 river basins, where the stream flow observations were carried out in relatively normal operating conditions. These reference sites could be utilized in various ways such as flow variation analysis, flow duration curve development and so on for the management of Total Maximum Daily Loads.

Development of Long Term Flow Duration Curves in 4 River Basins for the Management of Total Maximum Daily Loads (수질오염총량관리를 위한 4대강수계 장기유황곡선 작성방안)

  • Park, Jun Dae;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.3
    • /
    • pp.343-353
    • /
    • 2013
  • Flow duration curve (FDC) can be developed by linking the daily flow data of stream flow monitoring network to 8-day interval flow data of the unit watersheds for the management of Total Maximum Daily Loads. This study investigated the applicable method for the development of long term FDC with the selection of the stream flow reference sites, and suggested the development of the FDC in 4 river basins. Out of 142 unit watersheds in 4 river basins, 107 unit watersheds were shown to estimate daily flow data for the unit watersheds from 2006 to 2010. Short term FDC could be developed in 64 unit watersheds (45%) and long term FDC in 43 unit watersheds (30%), while other 35 unit watersheds (25%) were revealed to have difficulties in the development of FDC itself. Limits in the development of the long term FDC includes no stream monitoring sites in certain unit watersheds, short duration of stream flow data set and missing data by abnormal water level measurements on the stream flow monitoring sites. To improve these limits, it is necessary to install new monitoring sites in the required areas, to keep up continuous monitoring and make normal water level observations on the stream flow monitoring sites, and to build up a special management system to enhance data reliability. The development of long term FDC for the unit watersheds can be established appropriately with the normal and durable measurement on the selected reference sites in the stream flow monitoring network.

A Review of Stream Assessment Methodologies and Restoration: The Case of Virginia, USA

  • Bender, Shera M.;Ahn, Chang-Woo
    • Environmental Engineering Research
    • /
    • v.16 no.2
    • /
    • pp.69-79
    • /
    • 2011
  • Rapid population growth and land use changes have severely degraded streams across the United States. In response, there has been a surge in the number of stream restoration projects, including stream restoration for mitigation purposes. Currently, most projects do not include evaluation and monitoring, which are critical in the success of stream restoration projects. The goal of this study is to review the current status of assessment methodologies and restoration approaches for streams in Virginia, with the aim of assisting the restoration community in making sound decisions. As part of the study, stream restoration projects data from a project in Fairfax County, Virginia was assessed. This review revealed that the stream assessment methodologies currently applied to restoration are visuallybased and do not include biological data collection and/or a method to incorporate watershed information. It was found from the case study that out of the twenty nine restoration projects that had occurred between 1995 and 2003 in Fairfax County, nineteen projects reported bank stabilization as a goal or the only goal, indicating an emphasis on a single physical component rather than on the overall ecological integrity of streams. It also turned out that only seven projects conducted any level of monitoring as part of the restoration, confirming the lack of evaluation and monitoring. However, Fairfax County has recently improved its stream restoration practices by developing and incorporating watershed management plans. This now provides one of the better cases that might be looked upon by stakeholders when planning future stream restoration projects.

Follow-up Monitoring & Adaptive Management after Ecological Restoration for the Stream - Focused the Hakui Stream in Anyang City - (생태하천 복원 후 모니터링과 적응관리 - 안양시 학의천을 중심으로 -)

  • Choi, jungkwon;Choi, mikyoung;Choi, cheolbin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.18 no.6
    • /
    • pp.85-95
    • /
    • 2015
  • Recent years, nationwide projects for ecological restoration are implemented with emerging issues on the stream ecosystem. In order to enhance effectiveness of the ecosystem restoration and reduce negative impact, the appraisal of effectiveness through the follow-up monitoring and the adaptive management process are executed in consecutive phase. In this study, planning phase, monitoring and adaptive management in Hakui stream which is part of An Yang stream restoration project is introduced as representative ongoing case of effective adaptive management. The aim of this study is to verify the adaptive management process and suggest direction of effective restoration. Restoration project of Hakui stream resulted in increasing number and diversity of species (vegetation, fish, bird, invertbrates, amphibian and reptilia) according to monitoring from 2004 to 2013, and enhancing natural river landscape by evaluation of river naturalness among 2001(before restoration), 2007 (after), 2015 (recent). However, excessive vegetation expansion or sediment deposition on channel over time caused unexpected results such as terrestrialization or degradation of habitats. Adaptive management action such as removing disturbance species (Humulus japonicus)(2007), coppicing willow (2007), release of march snail (2007), creation of wetland (2014) were implemented based on monitoring results. And then appraisal of management action was discussed.

Temporal and Spatial Analysis of Hydrology and Water Quality in Small Rural Streams for Stream Depletion Investigation (건천화된 농촌소하천의 시·공간적 수문 수질 특성분석)

  • Lee, Ye Eun;Kim, Sang Min
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.6
    • /
    • pp.177-186
    • /
    • 2013
  • The purpose of this study was to analyze the temporal and spatial characteristics of the stream flow of small rural streams for investigating the status of stream depletion located downstream of irrigation reservoir. Bonghyun and Hai reservoirs and each downstream were selected for this study. Streamflow was measured for 8 stations downstream from two reservoirs from 2010 to 2012. The water quality samples were collected monthly from the 8 stream stations and 2 reservoir stations from 2011 to 2012. The stream depletion was found in most of the downstream of reservoirs for the non-irrigation period and even in the irrigation period when there were a lot of antecedent precipitation. We found that the stream segments where there were few streamflow, vegetation covers the stream and block the streamflow which makes the stream lost its original function as a stream. Water quality monitoring results of Bonghyun stream indicated that the concentration of SS, Turbidity, TOC, COD were decreased as the stream flows from the reservoir to downstream while the TN and TP were increased. The correlation analysis for water quality data indicated that the correlation between T-N and T-P was high for Bonghyeon and Sukji streams, respectively. Continuous monitoring for rural streams located in downstream of reservoirs are required to quantify the status of stream flow depletion and determine the amount of environmental flows.

Water Quality Management System for a Farm Village Stream -watershed monitoring and the system design- (농촌마을 하천의 수질관리 시스템 - 시험유역 조사 및 시스템 설계 -)

  • 정하우;최진용
    • Journal of Korean Society of Rural Planning
    • /
    • v.2 no.2
    • /
    • pp.109-117
    • /
    • 1996
  • The purpose of this study Is to develop water quality management system fort a farm village stream. The framework design of the system and the ecological monitoring of a test watershed were carried out, The system consists of GIS(Geographic Information System ), database, pollution source management, water quality and hydrologic analysis. Suri watershed located on Idong, Yongin city, Kyunggi Province, was selected as the test watershed for the application of the system. The fifteen's monitoring stations were chooses at up- and down-stream of the watershed. The results of an aquatic ecological monitoring were analyzed by the GPI(Group Pollution Index) method. The GPI revealed that water quality was varied within the stream. GPI and DO map for the watershed stream were developed, These maps facilitated to analyze the spatial distribution of the water quality.

  • PDF

Design and Implementation of Advanced Traffic Monitoring System based on Integration of Data Stream Management System and Spatial DBMS

  • Xia, Ying;Gan, Hongmei;Kim, Gyoung-Bae
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.2
    • /
    • pp.162-169
    • /
    • 2009
  • The real-time traffic data is generated continuous and unbounded stream data type while intelligent transport system (ITS) needs to provide various and high quality services by combining with spatial information. Traditional database techniques in ITS has shortage for processing dynamic real-time stream data and static spatial data simultaneously. In this paper, we design and implement an advanced traffic monitoring system (ATMS) with the integration of existed data stream management system (DSMS) and spatial DBMS using IntraMap. Besides, the developed ATMS can deal with the stream data of DSMS, the trajectory data of relational DBMS, and the spatial data of SDBMS concurrently. The implemented ATMS supports historical and one time query, continuous query and combined query. Application programmer can develop various intelligent services such as moving trajectory tracking, k-nearest neighbor (KNN) query and dynamic intelligent navigation by using components of the ATMS.

  • PDF

Analysis of Hydrodynamic Characteristics Apply to Nature-Friendly Stream Protection Method (자연형 호안공법을 적용한 소하천의 수리특성 분석)

  • Lee, Gang-Seuk;Park, Jong-Hwa;Yeon, Kyu-Bang
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.71-81
    • /
    • 2010
  • Stream Pilot Project, which began in May 2003 and finished in December 2003, was selected to develop effective methods applicable to nature-like streams. Stream restoration projects aim to maintain or increase ecosystem goods and services while protecting downstream and coastal ecosystems. Fields environmental monitoring such as flow discharge and precipitation were conducted along the Idong stream for amount of channel zone change in 2007. This study selected three monitoring positions to measure the water level and discharge of flowing water. A stage-discharge relation is obtained from direct discharge measurements for three stations by fitting an empirical relationship to the data set. Since discharge measures are made only for low flow conditions, a curve of discharge against stage can then be built by fitting these data with a power curve. And this study used data obtained from floodmark checkup as well as HEC-RAS model to analyze the hydrodynamic characteristics of monitoring sites. Reach-averaged hydraulic parameters for the supply reach were calculated from the small area's HEC-RAS model for Idong stream, and a HEC-RAS model used to analyze hydraulics for a period in 2007, after the stream was considered bank stabilization.

  • PDF

Monitoring of Agro-Ecological Environments at Small Watershed (농업유역의 생태환경 모니터링 기법 연구)

  • 박승우;윤광식
    • Journal of Korean Society of Rural Planning
    • /
    • v.2 no.2
    • /
    • pp.91-102
    • /
    • 1996
  • Monitoring techniques for afro-ecological environments were studied, Hydrologic and ecological components in conjunction with water quality were monitored in the Balkan watershed. The hydrologic monitoring program consists of four water level gauging stations along creeks and stream at the watershed having 26.5 km2. Stage - storage relationship of reservoir, rainfall amount of the watershed, and rating curve of the stream gauging stations were established. Soil type, land use, hydrologic soil group, population and economic activities within the watershed were surveyed. Water quality data from the streams were sampled weekly and chemical analysis was conducted. Temporal variations of water quality were investigated and water quality map of each reach of stream was made to identify spatial variations. Seasonal and spatial variations of vegetation densities along stream in the watershed were investigated using grid, Density variations of insect species such as arthropod, flying insect, spider spices, rice insects were also monitored to determine seansonal surveying density. These monitored data will be used to develop monitoring techi%ues and afro - ecological environment models.

  • PDF