• Title/Summary/Keyword: Technology Forecast

Search Result 638, Processing Time 0.03 seconds

Optimal Operating Method of PV+ Storage System Using the Peak-Shaving in Micro-Grid System (Micro-Grid 시스템에서 Peak-Shaving을 이용한 PV+ 시스템의 최적 운영 방법)

  • Lee, Gi-hwan;Lee, Kang-won
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.2
    • /
    • pp.1-13
    • /
    • 2020
  • There are several methods of peak-shaving, which reduces grid power demand, electricity bought from electricity utility, through lowering "demand spike" during On-Peak period. An optimization method using linear programming is proposed, which can be used to perform peak-shaving of grid power demand for grid-connected PV+ system. Proposed peak shaving method is based on the forecast data for electricity load and photovoltaic power generation. Results from proposed method are compared with those from On-Off and Real Time methods which do not need forecast data. The results also compared to those from ideal case, an optimization method which use measured data for forecast data, that is, error-free forecast data. To see the effects of forecast error 36 error scenarios are developed, which consider error types of forecast, nMAE (normalizes Mean Absolute Error) for photovoltaic power forecast and MAPE (Mean Absolute Percentage Error) for load demand forecast. And the effects of forecast error are investigated including critical error scenarios which provide worse results compared to those of other scenarios. It is shown that proposed peak shaving method are much better than On-Off and Real Time methods under almost all the scenario of forecast error. And it is also shown that the results from our method are not so bad compared to the ideal case using error-free forecast.

International Comparative Analysis for Korean, Japanese, German and French Delphi Forecasting in Information and Communication (정보통신분야의 델파이 기술예측 국제비교분석-한국.일본.프랑스.독일)

  • 홍순기;오정묵
    • Journal of Technology Innovation
    • /
    • v.5 no.1
    • /
    • pp.223-248
    • /
    • 1997
  • In this study the comparative analysis of four nations' Delphi technological forecasts in information and communication industry was carried out. The nations were Korea, Japan, Germany and France. The reliability test of realization time forecast was also conducted. There were some technologies of which four nations forecast almost same realization time whereas other technologies which four nations showed large variance in forecasting realization time. This means that experts from different nations had different views and prospects on the same technology. It is expected that prospecting international technological trend from this study will contribute to formulating long-range plan for technological development in information and communication in Korea. The result of the comparative analysis of four nations' forecasts in information and communication technology can be summarized as follows. a)As for the realization time, most of the technologies were forecast by four nations to be similar, the differences ranging from one to three years. It was found that on the whole, the longer the time of the forecast, the bigger the variance. The German forecast showed the biggest variance. b)In reliability test Korean was found to be the most reliable and Japan, France and Germany were in descending order. The response of all panel members was found to be more reliable than that of the panel members with high expertise, which means that there were substantially different views among panel members with high expertise on the realization time of the same technology.

  • PDF

A Method for the Discrimination of Precipitation Type Using Thickness and Improved Matsuo's Scheme over South Korea (층후와 개선된 Matsuo 기준을 이용한 한반도 강수형태 판별법)

  • Lee, Sang-Min;Han, Sang-Un;Won, Hye Young;Ha, Jong-Chul;Lee, Yong Hee;Lee, Jung-Hwan;Park, Jong-Chun
    • Atmosphere
    • /
    • v.24 no.2
    • /
    • pp.151-158
    • /
    • 2014
  • This study investigated a method for the discrimination of precipitation type using thickness of geopotential height at 1000~850 hPa and improved Matsuo's scheme over South Korea using 7 upper-level observations data during winter time from 2003 to 2008. With this research, it was suggested that thickness between snow and rain should range from 1281 to 1297 gpm at 1000~850 hPa. This threshold was suitable for determining precipitation type such as snow, sleet and rain and it was verified by investigation at 7 upper-level observation and 10 surface observation data for 3 years (2009~2011). In addition, precipitation types were separated properly by Matsuo's scheme and its improved one, which is a fuction of surface air temperature and relative humidity, when they lie in mixed sectors. Precipitation types in the mixed sector were subdivided into 5 sectors (rain, rain and snow, snow and rain, snow, and snow cover). We also present the decision table for monitoring and predicting precipitation types using model output of Korea Local Analysis and Prediction System (KLAPS) and observation data.

A Study on Forecast of the Promising Fusion Technology by US Patent Analysis (특허분석을 통한 유망융합기술의 예측)

  • Gang, Hui-Jong;Eom, Mi-Jeong;Kim, Dong-Myeong
    • Journal of Technology Innovation
    • /
    • v.14 no.3
    • /
    • pp.93-116
    • /
    • 2006
  • This study provides a quantitative forecasting method to identify promising fusion technology and it also applies the method based on patent analysis to IT. This study defines fusion technology, promising technology, fusion index, promising index and promising fusion technology. From the analysis, this study found that the next generation computer network is the most promising in IT area. This result is consistent with the forecasts made by the interviews and discussion of experts.

  • PDF

Improving Wind Speed Forecasts Using Deep Neural Network

  • Hong, Seokmin;Ku, SungKwan
    • International Journal of Advanced Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.327-333
    • /
    • 2019
  • Wind speed data constitute important weather information for aircrafts flying at low altitudes, such as drones. Currently, the accuracy of low altitude wind predictions is much lower than that of high-altitude wind predictions. Deep neural networks are proposed in this study as a method to improve wind speed forecast information. Deep neural networks mimic the learning process of the interactions among neurons in the brain, and it is used in various fields, such as recognition of image, sound, and texts, image and natural language processing, and pattern recognition in time-series. In this study, the deep neural network model is constructed using the wind prediction values generated by the numerical model as an input to improve the wind speed forecasts. Using the ground wind speed forecast data collected at the Boseong Meteorological Observation Tower, wind speed forecast values obtained by the numerical model are compared with those obtained by the model proposed in this study for the verification of the validity and compatibility of the proposed model.

Prediction Intervals for Day-Ahead Photovoltaic Power Forecasts with Non-Parametric and Parametric Distributions

  • Fonseca, Joao Gari da Silva Junior;Ohtake, Hideaki;Oozeki, Takashi;Ogimoto, Kazuhiko
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.4
    • /
    • pp.1504-1514
    • /
    • 2018
  • The objective of this study is to compare the suitability of a non-parametric and 3 parametric distributions in the characterization of prediction intervals of photovoltaic power forecasts with high confidence levels. The prediction intervals of the forecasts are calculated using a method based on recent past data similar to the target forecast input data, and on a distribution assumption for the forecast error. To compare the suitability of the distributions, prediction intervals were calculated using the proposed method and each of the 4 distributions. The calculations were done for one year of day-ahead forecasts of hourly power generation of 432 PV systems. The systems have different sizes and specifications, and are installed in different locations in Japan. The results show that, in general, the non-parametric distribution assumption for the forecast error yielded the best prediction intervals. For example, with a confidence level of 85% the use of the non-parametric distribution assumption yielded a median annual forecast error coverage of 86.9%. This result was close to the one obtained with the Laplacian distribution assumption (87.8% of coverage for the same confidence level). Contrasting with that, using a Gaussian and Hyperbolic distributions yielded median annual forecast error coverage of 89.5% and 90.5%.

Improving Forecast Accuracy of Wind Speed Using Wavelet Transform and Neural Networks

  • Ramesh Babu, N.;Arulmozhivarman, P.
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.3
    • /
    • pp.559-564
    • /
    • 2013
  • In this paper a new hybrid forecast method composed of wavelet transform and neural network is proposed to forecast the wind speed more accurately. In the field of wind energy research, accurate forecast of wind speed is a challenging task. This will influence the power system scheduling and the dynamic control of wind turbine. The wind data used here is measured at 15 minute time intervals. The performance is evaluated based on the metrics, namely, mean square error, mean absolute error, sum squared error of the proposed model and compared with the back propagation model. Simulation studies are carried out and it is reported that the proposed model outperforms the compared model based on the metrics used and conclusions were drawn appropriately.

Error Forecasting Using Linear Regression Model

  • Ler, Lian Guey;Kim, Byung-Sik;Choi, Gye-Woon;Kang, Byung-Hwa;Kwang, Jung-Jae
    • Journal of Wetlands Research
    • /
    • v.13 no.1
    • /
    • pp.13-23
    • /
    • 2011
  • In this study, Mike11 will be used as the numerical model where a data assimilation method will be applied to it. This paper aims to gain an insight and understanding of data assimilation in flood forecasting models. It will start with a general discussion of data assimilation, followed by a description of the methodology and discussion of the statistical error forecast model used, which in this case is the linear regression. This error forecast model is applied to the water level forecast simulated by MIKE11 to produced improved forecast and validated against real measurements. It is found that there exists a phase error in the improved forecasts. Hence, 2 general formula are used to account for this phase error and they have shown improvement to the accuracy of the forecasts, where one improved the immediate forecast of up to 5 hours while the other improved the estimation of the peak discharge.

The Simulation and Forecast Model for Human Resources of Semiconductor Wafer Fab Operation

  • Tzeng, Gwo-Hshiung;Chang, Chun-Yen;Lo, Mei-Chen
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.47-53
    • /
    • 2005
  • The efficiency of fabrication (fab) operation is one of the key factors in order for a semiconductor manufacturing company to stay competitive. Optimization of manpower and forecasting manpower needs in a modern fab is an essential part of the future strategic planing and a very important to the operational efficiency. As the semiconductor manufacturing technology has entered the 8-inch wafer era, the complexity of fab operation increases with the increase of wafer size. The wafer handling method has evolved from manual mode in 6-inch wafer fab to semi-automated or fully automated factory in 8-inch and 12-inch wafer fab. The distribution of manpower requirement in each specialty varied as the trend of fab operation goes for downsizing manpower with automation and outsourcing maintenance work. This paper is to study the specialty distribution of manpower from the requirement in a typical 6-inch, 8-inch to 12-inch wafer fab. The human resource planning in today’s fab operation shall consider many factors, which include the stability of technical talents. This empirical study mainly focuses on the human resource planning, the manpower distribution of specialty structure and the forecast model of internal demand/supply in current semiconductor manufacturing company. Considering the market fluctuation with the demand of varied products and the advance in process technology, the study is to design a headcount forecast model based on current manpower planning for direct labour (DL) and indirect labour (IDL) in Taiwan’s fab. The model can be used to forecast the future manpower requirement on each specialty for the strategic planning of human resource to serve the development of the industry.

Performance Assessment of Weekly Ensemble Prediction Data at Seasonal Forecast System with High Resolution (고해상도 장기예측시스템의 주별 앙상블 예측자료 성능 평가)

  • Ham, Hyunjun;Won, Dukjin;Lee, Yei-sook
    • Atmosphere
    • /
    • v.27 no.3
    • /
    • pp.261-276
    • /
    • 2017
  • The main objectives of this study are to introduce Global Seasonal forecasting system version5 (GloSea5) of KMA and to evaluate the performance of ensemble prediction of system. KMA has performed an operational seasonal forecast system which is a joint system between KMA and UK Met office since 2014. GloSea5 is a fully coupled global climate model which consists of atmosphere (UM), ocean (NEMO), land surface (JULES) and sea ice (CICE) components through the coupler OASIS. The model resolution, used in GloSea5, is N216L85 (~60 km in mid-latitudes) in the atmosphere and ORCA0.25L75 ($0.25^{\circ}$ on a tri-polar grid) in the ocean. In this research, we evaluate the performance of this system using by RMSE, Correlation and MSSS for ensemble mean values. The forecast (FCST) and hindcast (HCST) are separately verified, and the operational data of GloSea5 are used from 2014 to 2015. The performance skills are similar to the past study. For example, the RMSE of h500 is increased from 22.30 gpm of 1 week forecast to 53.82 gpm of 7 week forecast but there is a similar error about 50~53 gpm after 3 week forecast. The Nino Index of SST shows a great correlation (higher than 0.9) up to 7 week forecast in Nino 3.4 area. It can be concluded that GloSea5 has a great performance for seasonal prediction.