The International Standard Trends of MV Power Cable Installation Test and its Application on Korean Standard (지중배전케이블 준공시험 관련 국제규격 동향과 국내기준 개선 방안)

  • Lee, Jae-Bong;Jung, Yeon-Ha;Song, Il-Keun;Cho, Soung-Hoon
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.11
    • /
    • pp.1933-1937
    • /
    • 2008
  • XLPE insulated power cables are introduced in Korea in 1980s. The cable installation test has been carried out according to the Korean Technical Reference of Electrical Facilities. But recent research results shows DC Hipot test cannot detect the serious defects in XLPE insulated cables. VLF test is recommended as a installation test of XLPE insulated cables by CENELEC and IEEE standards in 1996 and 2001 respectively. We suggest to apply VLF test as an installation test for XLPE insulated MV cables in Korea.

Study of Selection Plan of Circuit breakers, Cables and Modeling of Korean Low Voltage Electrical Installation integration Test Site based on IEC 60364 (IEC 60364 기반의 한국형 저압전기설비 통합 실증단지 모델링 및 차단기와 케이블의 선정 방안 고찰)

  • Kim, Doo-Ung;Ryu, Kyu-Sang;Kim, Han-Soo;Shin, Dae-Sung;Ryu, Ki-Hwan;Kim, Chul-Hwan
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.29 no.9
    • /
    • pp.59-64
    • /
    • 2015
  • IEC is an international standards which are used in many countries with Europe as the center. IEC standard is introduced in Korea according to WTO/TBT agreements, however until now there are no buildings in Korea which are designed applying IEC standard. Therefore, KEA(Korea Electric Association) is scheduled to construct Korean low voltage electrical installation integration test site which is designed applying IEC standard. In this paper, before being under construction of Korean low voltage electrical installation integration test site, power substation is modeled based on real design parameters and method to select circuit breakers and cables is presented applying IEC standard in the modeled power substation. EMTP(ElctroMagnetic Transient Program) is used for simulation program. EMTP which is power system analysis program is easy to model power system and power substation.

Installation Damage Assessment of Rigid Geogrid by Field Tests (현장실험에 의한 강성 지오그리드의 내시공성 평가)

  • Cho, Sam-Deok;Oh, Se-Yong;Lee, Kwang-Wu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.978-985
    • /
    • 2004
  • Geogrid may be damaged during its installation in the filed. The installation damage mainly depends on two factors, which are materials used and construction activities. Materials relate to geogrid and soils, and construction activities are mainly related to installation of geogrid and compaction of soils. This paper describes the results of a series of field tests, which were conducted to assess the installation damage of the various geogrids according to different fill materials. After field installation damage tests, the change in tensile strength of geogrids was determined from wide width tensile tests using both damaged and undamaged specimens.

  • PDF

A Study on The Improvement of Weapon System Test and Evaluation - Focusing on the weapon system in the research development stage - (연구개발무기체계 시험평가 발전방안에 관한 연구)

  • Lee, Kang-Un;Boo, Joon-Hyo
    • Journal of National Security and Military Science
    • /
    • s.8
    • /
    • pp.383-420
    • /
    • 2010
  • This article is focusing on the improvement of weapon system test & evaluation, aimed at the weapon system in the research development stage. This article suggests improvement directions in three aspects(organization and system, skilled manpower and technology, test facilities of weapon system test & evaluation) as follows. 1) Weapon system test & evaluation organization and system a. Establishment of comprehensive test & evaluation system b. Making regulation for comprehensive test infrastructure management. c. Standardization of test & evaluation process, which can be used in special subject to army, navy and air force. 2) Skilled manpower and technology of weapon system test & evaluation a. Training & education, management of test & evaluation experts. b. Establishment of skill management system of test & evaluation. 3) Test facilities of weapon system test & evaluation a. Establishment of comprehensive improvement direction of test & evaluation installation and equipment. b. Consideration of counter measures to prevent overlapping investment, and to use the test & evaluation resources efficiently. c. Establishment of organic network for the effective use of test & evaluation installation and equipment. d. Establishment of detailed cooperation plan for the commonage of test & evaluation facility and equipment.

  • PDF

Interpretational Consideration of Geosynthetics Shear Behaviors (지오신세틱스 전단거동의 해석학적 고찰)

  • Jeon, Han-Yong;Kim, Cho-Rong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.293-302
    • /
    • 2010
  • 2 types of geogrids and geotextiles was used to evaluate shear behaviors after installation damage test. Shear behaviors were compared after installation damage test and coefficient of resistance to direct sliding($f_{ds}$) was estimated by theoretical shear analysis. Shear strength of damaged geogrid decreased under high normal stress of 150kPa and shear strength of geotextile decreased with increasing normal stress. It is seen that $f_{ds}$ values after installation damage decreased than before installation damage through comparison calculated $f_{ds}$ by direct theoretical shear analysis. $f_{ds}$ values to be calculated by theoretical shear analysis were changed with before and after installation damage.

  • PDF

Experimental Study for Installation Damage Assessment of Geogrid (지오그리드의 시공중 손상 평가를 위한 실험적 연구)

  • Cho, Sam-Deok;Lee, Kwang-Wu;Oh, Se-Yong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.8 no.1
    • /
    • pp.27-36
    • /
    • 2005
  • Geosynthetic reinforcements may be damaged during its installation in the filed. The installation damage mainly depends on two factors such as materials used and construction activities. This paper describes the results of a series of field tests, which are conducted to assess the installation damage of geogrid according to different maximum grain sizes of fills (40, 60, and 80 mm). These tests are done in three sites for twelve different kinds of geogrids. After field tests, the changes in tensile strength of the geogrids is determined from wide width tensile tests using both damaged and undamaged specimens. In the results of tests, tensile strength of the relatively flexible geogrids after field installation tests was decreased about from 20% to 40% according to the increment of the maximum grain size. On the other hand, for the relatively stiff geogrids, the loss of the tensile strength after site installation was examined below 5.2% independent of the maximum grain size of the soils. The results of this study show that the installation damage significantly depends on the stiffness of geogrid and is more obvious to a flexible geogrid and a fill material having higher maximum grain size.

A Study on the Test and Installation Standards of the Video Fire Detector (영상화재감지기 시험과 설치기준에 관한 연구)

  • Lee, Jeong-Hyun;Baek, Dong-Hyun
    • Fire Science and Engineering
    • /
    • v.30 no.4
    • /
    • pp.1-5
    • /
    • 2016
  • This research performed tests of Video Fire Detector and criteria of installation to make suggestions regarding the criteria that must be reflected in NFSC 203 by comparing the standards of FM Approvals, UL, ISO7240 and NFPA 72. FM Standard related to Video Fire Detector test has been classified as Smoke, Flame type, but the UL Standard has classified only as a Smoke type. This research examined 6 cases of fire phenomenon detection case in ISO 7240 and 3 cases in NFPA 72, respectively. There are 15 items required for the installation standard of a Video Fire Detector and each field standard is presented as a per installation method. To apply a Video Fire Detector, the pertinent items (the definition of term, detector's classification, structure and function among its test item) must be inserted. In addition, 7 items of the fire test, i.e., the sensitivity adjustment, prevent false alarm, ambient temperature test, the effective sensitivity and detection distance and viewing angle, aging test, flood test, must be applied to the actual test. For installation in the field, the operation environment and levels of illumination, and NFSC 203 must be set, and standards relevant to the sound system, indicators' installation distance, etc. need to be inserted.

Evaluation of Installation Damage Factor for Geogrid with Particle Size (입도에 따른 지오그리드의 시공손상계수 산정)

  • Lim, Seong-Yoon;Song, Chang-Seop
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.3
    • /
    • pp.113-120
    • /
    • 2010
  • Reduction factor for installation damage required to calculate design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demand lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method to evaluate reduction factor for installation damage using maximum particle size in backfill material is suggested.

Long-Term Performance of Geosynthetic Reinforcement Materials with Field Installation Condition

  • Jeon, Han-Yong;Mok, Mun-Sung;Cho, Seong-Ho;Byun, Sung-Weon;Lee, Joon-Seok
    • Proceedings of the Korean Fiber Society Conference
    • /
    • 2003.10b
    • /
    • pp.305-306
    • /
    • 2003
  • In the case of the geosynthetics usage to soil structure, there are some damages by compaction. And these damages by the installation compaction result in the unexpected changes of short and long term properties of the structure. So in the case of index test, there are some problems to the exact evaluation on the installation damage. Therefore, to the more definite evaluation on the installation damage of geosynthetics, the real site installation damage test is encouraged. (omitted)

  • PDF

Analysis of Thermal Characteristics and Insulation Resistance Based on the Installation Year and Accelerated Test by Electrical Socket Outlets

  • Kim, Kyung Chun;Kim, Doo Hyun;Kim, Sung Chul;Kim, Jae Ho
    • Safety and Health at Work
    • /
    • v.11 no.4
    • /
    • pp.405-417
    • /
    • 2020
  • Background: Electrical socket outlets are used continuously until a failure occurs because they have no indication of manufacturing date or exchange specifications. For this reason, 659 electrical fires related to electrical socket outlets broke out in the Republic of Korea at 2018 only, an increase year on year. To reduce electrical fires from electrical socket outlets, it is necessary to perform an accelerated test and analyze the thermal, insulation resistance, and material properties of electrical socket outlets by installation years. Methods: Thermal characteristics were investigated by measured the temperature increase of electrical socket outlets classified according to year with variation of the current level. Insulation resistance characteristics was measured according to temperature for an electrical socket outlets by their years of use. Finally, to investigate the thermal and insulation resistance characteristics in relation to outlet aging, this study analyzed electrical socket outlets' conductor surface and content, insulator weight, and thermal deformation temperature. Results: Analysis showed, regarding the thermal characteristics, that electrical socket outlet temperature rose when the current value increased. Moreover, the longer the time that had elapsed since an accelerated test and installation, the higher the electrical socket outlet temperature was. With respect to the insulation resistance properties, the accelerated test (30 years) showed that insulation resistance decreased from 110 ℃. In relation to the installation year (30 years), insulation resistance decreased from 70 ℃, which is as much as 40 ℃ lower than the result found by the accelerated test. Regarding the material properties, the longer the elapsed time since installation, the rougher the surface of conductor contact point was, and cracks increased. Conclusion: The 30-year-old electrical socket outlet exceeded the allowable temperature which is 65 ℃ of the electrical contacts at 10 A, and the insulation resistance began to decrease at 70 ℃. It is necessary to manage electrical socket outlets that have been installed for a long time.