• Title/Summary/Keyword: Total Life Cycle System Management

Search Result 105, Processing Time 0.027 seconds

Analysis of Economic Life Cycle for Hydro-Generator Based on Annual Equivalent Cost Method (연간등가비용법을 이용한 수력발전기의 경제적 수명주기 분석)

  • Lee, Sung-Hun;Chang, Jeong-Ho;Kim, Jin-O;Lee, Heung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.11
    • /
    • pp.1993-1999
    • /
    • 2011
  • Today, the power utilities is setting on the slow load growth and the aging of power equipment, and then could spend the efforts on the stability of system performance. Asset management may be defined as the process of maximizing corporate profit by maximizing performance and minimizing cost over the entire life cycle of power equipment. Therefore, asset management is great way to fulfill the economic investment and the stability of system performance. This paper presents the application of effective asset managem ent from an economic perspective. A proposed method is considering the life cycle analysis using life cycle cost methodology for hydro-generator during the total life cycle. The life cycle cost methodology include a way to calculating maintenance and operating costs. The proposed method will be expected to play an important role in investment decision making considering economic evaluation.

Analysis of Life-Cycle Cost for Urban Transit System using RAM (RAM을 고려한 도시철도시스템의 수명주기비용 분석)

  • Han, Seok-Youn;Hong, Soon-Ki;Ha, Chen-Soo
    • IE interfaces
    • /
    • v.18 no.4
    • /
    • pp.477-484
    • /
    • 2005
  • This paper is concerned with the life-cycle cost(LCC) of the urban transit system which was developed by KRRI and is now under test in Gyeongsan, Korea. Its reliability, availability and maintainability(RAM) were analyzed. LCC is the core part of analyzing the total cost of acquisition and ownership of a system. LCC analysis of a system is the most effective when it is applied in the it's early design phase. In this paper, we present IEC 60300-3-3(Life Cycle Costing) in detail and propose how to apply LCC in assessing the urban transit system according to RAM process. This case study demonstrates that reliability management system is very effective in reducing the operating cost of subway corporations in Korea.

INCORPORATION OF TOTAL TIME MANAGEMENT INTO HIGHWAY PROJECT TIME MANAGEMENT SYSTEM

  • Yuan Jianbo;Liu Weijun;Zhang Jianren
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.796-801
    • /
    • 2005
  • Time management is one of the critical tasks in project management. Based on the theories of total quality management, this authors presented a project time management method, total time management (TTM), so as to facilitate highway project time management. This paper discussed the four fundamental characteristics of TTM: total factors management, staff management, project life cycle management, and Plan-Do-Check-Action (PDCA) cycle management. Now, most managers use computer software to manage the project. In order to make the theory of TTM more executable, the authors develop a project time management system suitable for TTM. This paper presents this time management system's analysis processes including system requirement, key functions etc..

  • PDF

A Study on the Effect of R&D Project Management System on R&D Project Performance: Focusing on the Mediating Effects of Integrated Management and Life Cycle Management (R&D 프로젝트관리시스템이 R&D 프로젝트성과에 미치는 영향에 대한 연구: 통합관리 실행 및 전주기관리 실행의 매개효과를 중심으로)

  • Jongho Won;Sungyong Choi;Heekyung Kim;Sohyun Park
    • Journal of Information Technology Services
    • /
    • v.22 no.3
    • /
    • pp.65-83
    • /
    • 2023
  • Due to the development of modern technology and the enlargement of industrial scale, the scale of many projects is expanding and the complexity is also increasing. Individual management of existing projects cannot effectively manage projects in this trend, and it is necessary to systematically manage the entire process from initiation to completion. Accordingly, the need for integrated management and life cycle management that can efficiently manage the entire project is emerging, and for this, a systematic project management system is also required. PMS enables efficient project management by linking business processes such as resource, schedule, scope, and output management of a project with separately separated infrastructure accordingly. In this paper, a research model was proposed to manage the project from the perspective of implementing integrated management and life cycle management, especially during R&D project execution, and to prove the mediating role between PMS and R&D project performance for this purpose. The proposed research model will be able to help companies and organizations that feel the need to implement integrated management and life cycle management and are preparing to build a PMS-type system or that have already been established to efficiently perform project management.

PLM System Development for Data Management of KSLV-II Program (한국형발사체개발사업 정보 관리를 위한 PLM 시스템 구축)

  • Kwon, Byung-Chan;Park, Chang-Su;Kim, Keun-Taek
    • Journal of Aerospace System Engineering
    • /
    • v.8 no.2
    • /
    • pp.49-54
    • /
    • 2014
  • The main purpose of Korea Space Launch Vehicle II(KSLV-II) Program is to develop a domestic launch vehicle that can deliver a 1.5ton class application satellite into a Low Earth Orbit(600~800km). The data management is an essential factor in systems engineering for success of large-scale complex systems development, and it systematically manages the information and technical data for the total life-cycle of a system. In this paper, data management policies and processes on KSLV-II program are presented, and product life-cycle management system for KSLV-II program is also presented.

A Study on the Improvement of Public Facility Management System Using Life-cycle Management (Life-cycle Management를 활용한 공공시설 유지관리 시스템 개선방안)

  • Jeon Ick-Sung;Shon Jeong-Rak;Kim Kyung-Suk;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.55-63
    • /
    • 2004
  • A building structures was used the facility management phase through $planing\cdotdesign\cdotconstruction$. phase. building's length of life was shorter than its physical length of life, because of the lack of law and institution, the lack of related agencies' preparation and owner's preparation. Also, considering the construction life-cycle, the facility phase accounted for $70\%$ of whole official lift, therefore, it needed to be opposed to systemic facility management. Current facility management system practically managed the defect of facility and almost never communicated between the other phase. In the side of policy, domestic law, institution, and policy related to building structure focused built-up market. and then the management of existing facilities was not consolidated efficiently. The purpose of this study was to suggest the direction of facility management construction for managing, utilizing, and operating public facilities, moreover, to study the direction of current facility management system improvement corresponding to total computer integrated construction system under government agencies.

Exploration of Life-cycle Management for Government R&D Program: the Case of Preliminary Feasibility Study on R&D Program (국가연구개발사업의 전주기 관리방안 탐색: 연구개발 부문 예비타당성조사 제도를 중심으로)

  • Ahn, Sang-Jin;Park, Eun-Ji;Lee, Yoon Been
    • Journal of Korea Technology Innovation Society
    • /
    • v.17 no.1
    • /
    • pp.124-145
    • /
    • 2014
  • Market failure occurs when Pareto efficiency is not achieved through market mechanism. In order to solve this problem, government intervene market; paying great attention to the optimum state of resource allocation. However, as the size of government investment in R&D goes up, many professionals emphasize the importance in efficient management system. This work is the result of exploratory study to look into life-cycle management of governmental R&D program. Literature reviews and empirical research on governmental R&D programs elicit improvements for effective life-cycle management of governmental R&D program as follows: consistent discrimination between capital expenditure and recurring expenditure, dual management system by spending properties, implementing total cost management system in capital expenditure, and discrimination between preliminary feasibility study with confirming total program cost in recurring expenditure.

Korean Security Risk Management Framework for the Application of Defense Acquisition System (국방획득체계 적용 한국형 보안위험관리 프레임워크)

  • Yang, Woo-sung;Cha, Sung-yong;Yoon, Jong-sung;Kwon, Hyeok-joo;Yoo, Jae-won
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.32 no.6
    • /
    • pp.1183-1192
    • /
    • 2022
  • Information and Information processing systems must maintain a certain level of security during the total life cycle of Information. To maintain a certain level of security, security management processes are applied to software, automobile development, and the U.S. federal government information system over a life cycle, but theme of no similar security management process in Korea. This paper proposes a Korean-style security risk management framework to maintain a certain level of security in the total life cycle of information and information processing system in the defense sector. By applied to the defense field, we intend to present the direction of defense security work in the future and induce an shift in security paradigm.

C4I Maintenance Priority Decision using Maintenance Metric

  • Kim, Kiwang;Kang, Dongsu
    • Journal of the Korea Society of Computer and Information
    • /
    • v.22 no.12
    • /
    • pp.145-153
    • /
    • 2017
  • Systemic management is required at each phase of the C4I system life cycle to achieve information advantage in the battlefield through stable operation of the C4I system under the NCOE. In particular, the maintenance phase is the longest period of the C4I system life cycle, and it is easy to utilize and analyze data such as faults that occur during system operation. However, according to the previous research, the maintenance is evaluated as a phase in which the definition and management of comprehensive indicators are insufficient compared to other phase. In this paper, we propose the method of C4I Maintenance Priority decision using Maintenance metric. As a result of modifying the Naval Tactical C4I System's preventive maintenance cycle according to the priority, the total number of faults is reduced and the maintenance efficiency is improved.

Design and Implementation of a Web-based Expert System for the Total Quality Management (종합적 품질경영을 위한 웹 기반 분산형 전문가시스템의 설계 및 구축)

  • 김성인;조정용
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.2
    • /
    • pp.168-190
    • /
    • 2004
  • In these days of world-wide business environment, the characteristics of quality management are variety, specialty, decentralization, totality, etc. Thus nowadays quality management is demanded to incorporate these new concepts. We propose a web-bused distributed expert system for this purpose. The system consists of four expert systems for design of experiment, acceptance inspection, statistical process control and reliability management corresponding to design quality, incoming-material quality, manufacturing quality and usability quality, respectively, throughout the total product life cycle. Each distributed expert system at the horizontal level in the hierarchy carries out its own quality jobs independently. At the lower level in the hierarchy there is an expert system for measurement analysis to provide reliable data, and at the upper level, an expert system for total quality management to coordinate, integrate and make final decisions. A prototype has been developed and its application is presented.