• Title/Summary/Keyword: Total Station Surveying

Search Result 111, Processing Time 0.032 seconds

Application of Non-prism Total Station for Topographic Surveying (지형측량을 위한 무 프리즘 토털스테이션의 활용)

  • Lee Jong-Chool;Kim Hee-Kyu;Ha Dae-Hwan;Seo Jae-Su
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.27-32
    • /
    • 2006
  • Applications for developed non-prism total station which can decides three dimensional position without prism are increasing in variety survey fields. However, distance measurement using non-prism method is lower accurate than prism method because laser strength reflected from materials is varied by angle of reflection and materials. Therefore, distance measured using non-prism total station by angle of reflection and materials is compared with that using pnsm method, and its characters are introduced applying non prism total station in topographic surveying.

  • PDF

Comparing Efficiency of Numerical Cadastral Surveying Using Total Station and RTK-GPS (토탈스테이션과 RTK-GPS 측량을 이용한 수치지적측량의 작업효율성 비교)

  • Hong, Sung-Eon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.3
    • /
    • pp.87-96
    • /
    • 2007
  • In the numerical cadastral surveying field, the cadastral surveying would be measured with the Total Station surveying (electronic plane table surveying) system that consist the Total Station for surveying and the computing system for recording and editing the measured coordinates data by the TS. This study would suggest the advanced method, which is used on the RTK-GPS instead of TS for surveying and the computing system for handling the coordinates data and mapping. As a result of this study, although the measurement accuracy of the RTK-GPS and TS surveying make no greate difference, the suggested method reduces the cost of time and work force with the TS surveying. Besides, the new survey method would be more efficient due to directly handling the data and mapping in the field.

  • PDF

A Study on Application of Global Positioning System for Cadastral Surveying (지적측량을 위한 GPS의 활용방안에 관한 연구)

  • Yim, Hyon-Cheol
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.4
    • /
    • pp.41-50
    • /
    • 2007
  • This study aims to suggest efficient setting up of GPS (Global Positioning System) for cadastral surveying. In order to perform it effectively, worldly used modern surveying technology GPS introduced. In a practical analysis, GPS observation had been performed in the research area and the results had been compared and analysed with the results of Total Station. As a results, it is shown that GPS is more efficient rather than current surveying method in terms of time, cost and economy. The results of GPS surveying were included in the scope of error tolerance, being accepted by cadastral laws, showing high accuracy of GPS surveying method. With the results of analysis, how to application of GPS for cadastral surveying was suggested.

  • PDF

The Efficiency Evaluation of One Person Non-Prism Surveying System for Tunnel Measurement (터널계측을 위한 1인 무프리즘 측량시스템의 효율성 평가)

  • Park, Kyeong-Sik;Hahm, Chang-Hahk;Lee, Jae-Kee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.15 no.4
    • /
    • pp.89-96
    • /
    • 2007
  • The tunnel measurement data such as deficiency quantity, outbreak quantity, inner displacement and crown settlement are very important elements in tunnel sites under construction and obtained mostly by displacement gauge and total station. However, it is difficult and dangerous to install targets or measurement equipments on the points in tunnel construction site and also we need several persons to work in the tunnel. Non-prism total station with remote control system which is developed recently has various efficient functions for tunnel measurement. Therefore, for efficient tunnel measurement, this study suggested one person surveying system which consisted of non-prism total station and notebook PC to control total station remotely, and we evaluated the suggested tunnel measurement system. In this study, the tunnel site under construction was chosen as the test field and tunnel surveying was done by existing surveying method and suggested method separately. As result of the test, we analyzed processing time and accuracy to demonstrate the superiority of suggested one person non-prism surveying system.

  • PDF

On the Bridge Construction in Marine by GPS (GPS측량을 이용한 연륙교 가설공사에 관한 연구)

  • 오창수;최광희;임학량;조형식
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2004.11a
    • /
    • pp.111-116
    • /
    • 2004
  • This study is given that on the bridge construction in marine by GPS, specially, choice of station for footing construction of marine bridge. You can get positive datum in the checking of marine excavation, if you use together Total Station and GPS. In the result of comparision of upper surveying methods, Surveying datum is gotten error of less than 30mm(The depth of water 10~l5mm, station 7~10mm). This study show that hereafter if you use GPS in bridge construction in marine you can get accurateiy datum.

  • PDF

Establishing PC-based Object-Oriented Urban Infrastructure Information System using GPS and TotalStation (GPS 및 Total Station을 이용한 PC용 개체지향 도시 기반 시설물 관리 시스템 구축)

  • 유상근;이규석
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.1
    • /
    • pp.41-49
    • /
    • 2000
  • This study was performed to establish PC-based Urban Infrastructure Information System(UIIS) using GPS and TotalStation as an alternative to UNIX-based UIIS. After carryig out this study, the following conclusions were derived: PC-based UIIS costs less time and money than UNIX-based UIIS. The coordinates of the control point of the site were obtained using DGPS, then based on this point, locational data were obtained using RTK GPS and TotalStation in the site with realtime data capture to enhance the accuracy of locational data. And image data were also entered into database together with the text data. So, the multimedia database is possible in UIIS.

  • PDF

Accuracy Evaluation of Reflective Sheet Target Total Station for Applying in Cadastral Resurvey (지적재조사 측량에 적용을 위한 반사시트 타깃 토털스테이션 측량의 정확도 평가)

  • Park, Ki Heon;Hong, Sung Eon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.22 no.4
    • /
    • pp.91-97
    • /
    • 2014
  • In this research, we would try to evaluate the applicability in cadastral resurvey surveying by analysing the accuracy of building boundary surveying using the reflective sheet total station surveying. When we analyse it, we refer the reflective sheet which can supplement not only the difficulties of total station surveying and GPS surveying caused by the diversity of the building structure but also the errors of non prism total station caused by material of the object. Each reflected angles $90^{\circ}$ and $60^{\circ}$, $30^{\circ}$ of RMSE results were analyzed by RMSE between 1.2mm~2.8mm and 2.2mm~4.0mm, 2.5mm~4.4mm for each distance. The result of X RMSE was analyzed to be 0.0043m in a boundary surveying for existing building between prism surveying and reflective sheet surveying, and also Y RMSE was 0.038m. The source of error is estimated that the body of the prism can not be exactly attached to the edge of a building. Therefore, it will be very helpful to use a reflective sheet surveying with a prism in both the limit of collimation and error reductions as a building boundary measurement in cadastral resurvey surveying.

Comparison of the Accuracy to the Surveying Data by Terrestrial LiDAR and Total Station (지상LiDAR와 토탈스테이션에 의한 측량성과의 정확도 비교분석)

  • Yang, In-Tae;Shin, Moon-Seung;Lee, Sung-Koo;Shin, Myung-Seup
    • Journal of Industrial Technology
    • /
    • v.31 no.B
    • /
    • pp.9-15
    • /
    • 2011
  • Nowadays, the Surveying field is growing rapidly in terms of technology such as TS(Total Station) surveying, photographic surveying, digital aerial photogrammetry, utilization of GIS(Geographic Information System) using high-resolution satellite imagery, obtaining 3D Coordinate using GPS. But control point surveying, benchmark measuring, and field Surveying are still performed by the engineers in the field. So, 3D yerrestrial laser scanner comes to the fore recently. 3D terrestrial laser scanner can get 3D coordinate about a number of sites of the subject in a short period with high accuracy. This paper compared the accuracy of data from the performance using 3D terrestrial laser scanner with that of TS. It also obtained the geopositioning accuracy result equivalent to the surveying result of TS. With further researches in the future, it is expected to be used not only in LiDAR itself but also in various areas like reconnaissance Surveying and construction by combining with TS or other Surveying equipments.

  • PDF

Analysis of Incidence Angle Using Total Station in Leveling

  • Roh, Tae-Ho;Seo, Dong-Ju;Lee, Jong-Chool
    • Korean Journal of Geomatics
    • /
    • v.1 no.1
    • /
    • pp.21-26
    • /
    • 2001
  • Total Station (TS) is currently widespread and used in many fields of surveying projects. However, its application functions are not perfectly understood and so insufficiently used. One of them is indirect leveling method using TS. Because we can reach a considerable accuracy level with this method, it is gradually expanding for public surveying works such as construction of roads, airports and harbors. This paper gives results of an experiment to increase accuracy of indirect leveling by TS without direct leveling, which is more comfortable and quick to determine elevation.

  • PDF

Accuracy Analysis of Network RTK Surveying for Cadastral Re-survey Project (지적재조사사업에서 Network RTK 측량의 적용 정확도 분석)

  • Park, Chun Soo;Park, Ki Heon;Hong, Sung Eon
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.21 no.4
    • /
    • pp.117-123
    • /
    • 2013
  • The purpose of this research is to suggest the reasonable method of Network RTK surveying in future cadastral re-survey project through the accuracy analysis about Network RTK surveying achievement and the conventional TS-based confirmation surveying. To achieve it, we selected the experiment places and succeeded in achieving the result by Network RTK surveying about total of 307 parcel boundary point. We compared it with the result of confirmation surveying for cadastral, and it was shown that total connection errors of RMSE was ${\pm}0.1028m$ and total 48 places exceeded in the cadastral re-survey allowable error tolerance. The research suggested the practical alternatives in cadastral re-survey project after the comprehensive evaluation of those analysis results. Therefore, the author suggested development and adoptation of integrated electronic plane table surveying method. Moreover, we suggested unifying the first parcel boundary point method into the total station surveying and adopt the Network RTK surveying on the cadastral surveying inspection.