• Title/Summary/Keyword: Train Performance

Search Result 1,477, Processing Time 0.041 seconds

Train Performance Simulation and Evaluation for Korea High Speed Train (한국형 고속전철 개발열차 열차성능해석 및 평가)

  • 이태형;박춘수;신중린
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.120-124
    • /
    • 2004
  • Computer aided simulation is an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate train performances such as distance, speed, power during train's running. This paper presents result of train performance simulation using the program that developed for Korea high speed train. To verify result of simulation, we have compared that with experiment data.

Effect of noise barrier on aerodynamic performance of high-speed train in crosswind

  • Zhao, Hai;Zhai, Wanming;Chen, Zaigang
    • Wind and Structures
    • /
    • v.20 no.4
    • /
    • pp.509-525
    • /
    • 2015
  • A three-dimensional aerodynamic model and a vehicle dynamics model are established to investigate the effect of noise barrier on the dynamic performance of a high-speed train running on an embankment in crosswind in this paper. Based on the developed model, flow structures around the train with and without noise barrier are compared. Effect of the noise barrier height on the train dynamic performance is studied. Then, comparisons between the dynamic performance indexes of the train running on the windward track and on the leeward track are made. The calculated results show that the noise barrier has significant effects on the structure of the flow field around the train in crosswind and thus on the dynamic performance of the high-speed train. The dynamic performance of the train on the windward track is better than that on the leeward track. In addition, various heights of the noise barrier will have different effects on the train dynamic performance. The dynamic performance indexes keep decreasing with the increase of the noise barrier height before the height reaches a certain value, while these indexes have an inverse trend when the height is above this value. These results suggest that optimization on the noise barrier height is possible and demonstrate that the designed noise barrier height of the existing China Railway High-speed line analysed in this article is reasonable from the view point of the flow field structure and train dynamic performance although the noise barrier is always designed based on the noise-related standard.

Development of High Speed Train Performance Simulation Software (고속전철 차량시스템의 주행성능 예측 소프트웨어의 개발)

  • Jeong, Gyeong-Ryeol;Kim, Sang-Heon;Park, Su-Hong;Lee, Jang-Yong
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.24 no.1 s.173
    • /
    • pp.134-143
    • /
    • 2000
  • A train performance simulation (TPS) software is a computer program that simulates the operation of a train system over a specified railway route and it is widely used in railroad operation and research applications. Numerical and graphical results from the simulation software, which is developed in this study, provide information on such performance variables as travel time. running speed, energy consumption at a specific time interval and in overall service time as the train moves along the route. Three types of input data are required for a computer simulation: track information, train information, and running conditions. The simulation of train performance starts with several simple mathematical models including train configuration. traction efforts, running resistance. and braking requirements. Based on the basic specifications of Korean High Speed Railway, System. this study, puts a focus on the estimation and assessment of train performance comparing. the specific train configurations of KEST20/11. CPLE20/10. PROP20/10, which are proposed from the previous G7 projects.

The Effect of Train Motion on Current Collection in High-speed Train

  • Kim, Jung-Soo
    • International Journal of Safety
    • /
    • v.5 no.1
    • /
    • pp.1-4
    • /
    • 2006
  • The safety performance of the current collection system is evaluated by conducting a test run in which accelerometer and load cell signals are analyzed. It has been found that the current collection performance is strongly influenced by the train speed, with the major frequency components arising from the train traversing the span spacing and the 8.5 Hz component originating from the panhead resonance. The train acceleration is found to have significant influence on the span passing frequency but negligible effect on the resonant response.

Train Performance Simulation for Korea High Speed Train (한국형 고속전철 개발차량 열차성능 해석)

  • 이태형;박춘수;목진용
    • Proceedings of the KSR Conference
    • /
    • 2003.10a
    • /
    • pp.199-203
    • /
    • 2003
  • Computer aided simulation is becoming an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate rotting stock's performance such as distance, speed, power etc when train's running. This paper presents result of train performance simulation using the program that developed in advance for Korea high speed train. To verify result of simulation, we have compared that with experiment data.

  • PDF

Development of a Train Performance Simulation S/W for The Performance Analysis of High Speed Railway System(2) (고속전철 시스템 성능해석을 위한 열차 주행시뮬레이션 S/W 개발(2))

  • Lee, Tae-Hyung;Hyun, Seung-Ho;Chung, Heuing-Chai;Hwang, Hee-Soo
    • Proceedings of the KIEE Conference
    • /
    • 2000.07b
    • /
    • pp.1381-1383
    • /
    • 2000
  • A multi-train operation simulation software is under development, in this G7 Project for a High Speed Train System, to simulate the running performance, power consumption, signalling and operation. In the first stage, a Train Performance Simulation (TPS) software is introduced in this paper. This is a core module of whole system and gives some parameters of a train, e.g., its position, speed traction and braking power and electric power system state, etc. In this paper, calculation technique was used for voltage drop at the train's positions and major posts along the catenary line. The final program will be used as an evaluation tool for system performance in constructing a new line or introducing a new train system.

  • PDF

Strength and Dynamic Performance Analysis for Tilting Train Wheel (틸팅차량용 차륜의 구조 강도 및 동적 성능 해석)

  • Hur, Hyun-Moo;Kwon, Sung-Tae;Seo, Jung-Won;Kwon, Seok-Jin
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.23 no.11 s.188
    • /
    • pp.85-92
    • /
    • 2006
  • For the improvement of a conventional railway speed, tilting train(Tilting Train express) is under the development aiming for a maximum speed 180km/h. Compared to the existing conventional rolling-stock, tilting train could take an advantage of speed improvement about $20{\sim}30%$ on curve sections due to the improvement of cowing performance. However, this speed increasement creates a severe load at wheels, thus it is necessary to study the safety of wheel for tilting train preferentially. On the other hand, it is under consideration that the wheel for conventional railway rolling-stock at speeds of 150km/h will be applied to tilting train at speeds of 180km/h. In this paper, we have studied the strength of wheel structure, the geometrical contact characteristics, and the dynamic performance of wheel to evaluate the safety of wheel for tilting train.

A Study on Overall Measurement System Development of HEMU-400X Performance Test (차세대고속열차 성능시험을 위한 종합계측시스템 개발 연구)

  • Lee, Young-Yeob;Ryu, Sang-Hyun;Kim, Bong-Rae;Kim, Kyung-Taek
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1118-1123
    • /
    • 2011
  • The introduction of high speed railway(KTX) in Korea after the Korean high speed train through the KTX-II of the development is being run is made. Thus the demand for the railway technology advances and high performance, Korean government promoted the development of the next-generation high speed train system(HEMU-400X). In addition to the production of train system essential element of the train through an on-line test is to evaluate the performance. Through the on-line test of the train in order to evaluate the performance test items should be selected first and need to the test procedures are required. In addition, an Overall Measuring System(OMS) to measure the performance of the train system should be established. In this study for the on-line test of the HEMU-400X test items was selected for detailed measurements and performance evaluation of a comprehensive and efficient trains to test an OMS for the development are discussed.

  • PDF

A Train Performance Simulation using Simulink for Generating Energy-efficient Speed Profiles (에너지 효율적인 속도 프로파일 생성을 위한 Simulink 기반 열차 성능 시뮬레이션)

  • Kang, Moon-Ho;Han, Moon-Seob
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.10
    • /
    • pp.1816-1822
    • /
    • 2010
  • In this research TPS (Train Performance Simulation) blocks are designed using Simulink and applied to generate speed profiles for energy-efficient train operation. With a train operation mode of maximum powering, coasting, and maximum breaking, a breaking point is calculated from forward-backward running profiles. Then, GA (Genetic Algorithm) is used to solve a running time constraint, and a coasting point is produced from the searching process of GA. With the breaking point and the coasting point a speed profile is plotted. Train performance under a speed limit and gradient variations is simulated and resultant speed profiles are analyzed.

Measurement System Establishment and Result Comparison for Verification of Train Performance Simulation (열차주행시뮬레이션 검증을 위한 계측시스템 구축과 결과 비교)

  • Lee, Tae-Hyung;Park, Choon-Soo;Mok, Jin-Yong
    • Proceedings of the KIEE Conference
    • /
    • 2003.11b
    • /
    • pp.95-98
    • /
    • 2003
  • Computer aided simulation is becoming an essential part in planning, design, and operation of railway systems. To determine the adequate performance and specification of railway system, it is necessary to calculate rolling stock's performance such as distance, speed, power etc when train's running. This paper presents result of train performance simulation using the program that developed in advance for Korea high speed train. To verify result of simulation, we have developed measurement system and compared simulation result with experiment data.

  • PDF