Deduction on The Problems and Improve The Way of The Successful Bidder Determination Method for Turnkey·Alternative Bid Construction (턴키·대안입찰공사 낙찰자 결정방식의 문제점 및 개선 방안 도출)

  • Park, Hong-Tae;Lee, Yang-kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1881-1891
    • /
    • 2014
  • Full system of turnkey deliberation committee in 2010 was abolished and permanent Deliberation committee was introduced. So far, ordering organization selected the best method suitable for the design and comprehensive evaluation method in the turnkey bid construction. Comprehensive evaluation method have bid price design score coordination, weighted basis, the best design approach fixed amount, five successful bidder decision method in addition. Design deliberation branch committee in the successful bidder decision way configured and operated branch members of special design consultation committee, But main agent changed from committee deliberation pull system to permanent committee deliberation, as well as and The lobby burden was not improved. This similar to the past at the portion of the design deliberation and the way of the design deliberation in the turnkey bid construction. Therefore it is necessary to improve the design deliberation system. In other words, design score and technology competition should be adapted to determine a successful bid. This study suggested the operating system of the design deliberation, the decision method problems of the successful bidder and ways to improve the design deliberation.

Development of a Project Management System for the Turnkey-based Plant Project (중공업 일괄수주공사를 위한 프로젝트 관리 시스템 개발 사례)

  • Ko, Chang-Seong;Rho, Jae-Jeung;Hyun, Jae-Myung;Kim, Myoung-Gwan
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.167-180
    • /
    • 1998
  • This study is concerned with the development of a project management system for the turnkey-based plant project, which will help the site manager to plan, control, and report the project progress. This system has been developed as one of the modules of the integrated information system for the H Heavy Industry Co. and is composed of five subsystems; project information system, drawing-material management system, process management system, project progress report system. A/S management system. it also integrates commercial project management package in order to schedule the project activities and report the project progress to the owner. The main purpose of the system is to provide project information, including drawing, material, and progress, to the site manger in the real time and to accumulate site know-how for the turnkey-based plant project.

  • PDF

Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects (토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구)

  • Lee Yang-Kyoo;Kang Leen-Seok;Park Jong-Hyuk;Jeon Seong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.8 no.5
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

Orders Status Analysis on the Successful Bidder Decision Method of Turnkey Alternative Tendering Construction (턴키·대안입찰공사 낙찰자 결정방식에 의한 수주현황 분석)

  • Park, Hong-Tae;Lee, Yang-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.771-780
    • /
    • 2013
  • Inspection system which was performed in the past selected the final winning bidder by separating Pre-Qualification, the basic design evaluation and price evaluation. However, turnkey and alternative bidding construction has selected way to determine the successful bidder as the best design and the most low cost method, comprehensive evaluation method (bid price adjustment, design score adjustments, weights standard), the best design and the fixed amount method from january 1, 2010 to the present. Due to these institutional problems, orders institutions were often a way to determine the successful bidder to apply differently for identical or similar construction. Therefore this study winning bidder selection criteria through analysis of construction the number and construction order performance, order performance by work division and institutional orders, the weights bidder order performance and orders status of turnkey alternative tendering construction to civil part performed in domestic.

A Study on the Practical Suggestions in the Contract for the Turnkey Supply of an Industrial Plant - Focused on the Commentary of ICC Model Contract - (턴키방식 플랜트계약의 실무상 유의점에 관한 연구 - ICC 표본 계약서의 해설을 중심으로 -)

  • Oh, Won-Suk;Lee, Ki-Ok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.53
    • /
    • pp.3-29
    • /
    • 2012
  • This article examines the Practical Suggestions in the Contract for the Turnkey Supply of an Industrial Plant based on a study focused on the commentary of "ICC Model Contract" clause which is encouraged by ICC. Especially practical issues are inquired into on business and legal perspective as follows. First, in regard to supply of technical documentation, equipment and spare parts, it is important to supplier and purchaser to agree on obtaining technical documents necessary for installing and operating plant, and also components necessary for it's maintenance. Second, it is about erection, testing, taking over and training chapter. Both parties need to agree about the process of the arrival of equipments and assembly conducted by the supplier and following examination and also training purchaser to operate it Third, when it comes to price, payment conditions, bank guarantees, parties are to make decision on the pricing, payment conditions and currency of contract-payment. Lastly, it is necessary to reach an agreement of the issue of whether it is to be defined as delay or non-performance of the contract and also it's consequences about rights and obligation.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

해외건설공사 수행절차(9) - Converted Lump Sum Turnkey 계약방식

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.75-78
    • /
    • 2009
  • 전통적으로 주요 EPC(설계, 구매, 시공) 공사는 최초의 엔지니어링 작업(FEED : Front End Engineering Design)을 한 후, 경쟁입찰을 하여 총액계약(Lamp Sum)으로 공사를 수행했다. 최근에 EPC시공자의 위험부담을 줄이는 한편, 발주자는 경쟁적인 시공자를 확보할 수 있는 기회를 확대하면서 협상기간을 단축하교 조기착공을 위해, Lump Sum 가격을 늦게 결정하는 방법을 고려한다. CLST(Converted Lump Sum Turnkey)계약방식은 최초의 엔지니어링 작업을 한 후 경쟁입찰을 통해 1차 계약을 맺고(설계 및 특별 자재 공급에 대한) 공사를 수행하다 설계가 충분히 진행되고 핵심자재에 대한 견적이 입수되어 발주 가능한 시점 및 하도급사를 선정할 준비가 된 시점에서 1차 계약을 변경해 2차 계약을 맺는다. 2차 계약 시 1차 시 맺은 계약조건(직접공사비, 일반관리비 및 이윤, 최대한도 금액이 포함됨)을 기준으로 하되, 발주자가 Open Book 형식으로 공사비를 평가하고 재협상하여 Lump Sum 금액으로 전환해 합의한다. 이후 Lump Sum Tumkey 계약과 동일한 형식으로 공사를 수행한다.

  • PDF

Development of Review Processes and Tools for Liquidated Damages for EPC/Turnkey Project: Contractor's Perspective

  • Hahn, Ki Jeong;Lee, Eul-Bum;Kim, Young Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.718-719
    • /
    • 2015
  • As a recent global trend, the majority of plant projects are delivered through EPC or EPC-turnkey contracts, where a contractor's liability is more complicated because of the mega size scale and financing method. Previous researches have been lacking a practical usability for project members for liabilities of contracts. Those were focused on solving the claims or schedule calculation issues only. The objective of the present study was to develop a validation process for LDs (liquidated damages) in contractor's liabilities with various case studies and expert judgments. As summarized in this paper, the processes and tools were developed with project life cycle process. The project preparation phase includes 3 step check lists to determine the Go or No-go for projects. In progress phase, contractors should focus on the response strategies for claims with liabilities. The study concludes that those developed processes and tools will help to manage risk of LDs for the contractors in the overseas projects.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF