A Study on the Analysis of Factors for Landscape Architect Scheme Modification for the Restoration Project of Cheonggyecheon (청계천복원사업의 조경설계안 변경 요인 분석)

  • Kim, Yu-Ri;Yang, Byoung-E
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.35 no.5
    • /
    • pp.16-28
    • /
    • 2007
  • In this study, the implications for landscape architecture in the restoration Project of Cheonggyecheon will be shown through the analysis of factors for landscape architect scheme modification. The method of study consists of theoretical study, analysis of the plan and design of landscape architecture of the restoration project of Cheonggyecheon, and deduction of implications thereof. The controversial feints included the many difficulties in realizing the productive design of landscape architecture due to the selective collecting of public opinion and the problems of settling the complications, the design limit of the turnkey and MA systems, the lack of hydraulic knowledge and technology and the shortage of vegetation monitoring data and experimental materials. The alternative proposals are as follows: 1) there should be agreement between the government organization and the civil group, 2) in the turnkey bidding for the river restoration projects, the river restoration design based on the volume divided into some parts should be reconsidered in order to maintain consistency in the total design, 3) in order to maintain consistency in the planning policies, MA designs should also be introduced and applied from the first stage of the project through its completion, and 4) data such as the safe water level in case of flooding for the facilities and the vegetation and data in connection with the ecological restoration of river should be accumulated. If these controversies are not settled effectively, the river restoration project will be delayed due to complications with the citizens and wasted time and effort will result from the frequent design changes. In addition, landscape architecture in this kind of restoration project is bound to decrease in the future due to frequent changes in the hydraulic-centered design.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

Analysis on Procurement Auction System in Public Procurement Service (공공투자사업의 입·낙찰 분석)

  • Kim, Jungwook
    • KDI Journal of Economic Policy
    • /
    • v.32 no.2
    • /
    • pp.144-170
    • /
    • 2010
  • This paper considers the effect of various types of procurement auction system on competition focusing on the rate of successful bidding. We analyze the number of bidders and the rate of successful bids using online procurement data of the Public Procurement Service. The average number of bidders is 301 and the average rate of successful bids is 87.42% while the weighted average rate is 75.13%. These numbers show that there is quite strong competition among bidders and the rate is lower as the expected price is higher. When we analyze the data of price procurement auction, the rate is also shown to be lower as the expected price is higher. Furthermore, the rate decreases as the number of bidders increases which naturally makes the competition stronger. Meanwhile, the analysis finds that the inclusion of the onsite bidding, the PQ(Pre-Qualification) result, or major-10 winning companies cannot explain the rate much in our data. In case of turnkey-alternative, the average rate of successful bidding for 484 cases record 90.20%. The average is 84.89% with 120 alternatives and 91.97% with 364 cases of turnkey. The reason why the rate of turnkey-alternative is lower than that of price procurement auction is the lack of competition as well as the systematic difference. By setting up a model, we are able to explain the difference in rate caused by the respective reason. When we suppose there are 3 bidders in case of price procurement auction for a project that exceeds 100 billion won, the rate is expected to be around 64%. This implies that difference of 26% is caused by the systemic difference and 3% by the lack of competition. Therefore, we conclude that the difference in rate between turnkey-alternative and price procurement auction is caused mainly by the systemic difference. In case of PPP(Public Private Partnership) projects, among 154 projects in total, only 40% has more than 2 bidders that compete. The average number of bidders is 1.88 which is less than 2, and the average rate of successful bids is 90%. In sum, under the price procurement auction, there is strong competition which is reflected by the rate of successful bids. However, there is room to decrease the rate by strengthening the competition under the turnkey-alternative. Also with PPP projects, we expect the rate can be steadily reduced with revived competition among bidders.

  • PDF

Life Cycle Cost Evaluation Index Enhancing of Public Facilities (공공시설물의 LCC 평가기준 개선방안)

  • Gu, Bon-Hak;Kim, Tae-Hui;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.412-415
    • /
    • 2007
  • Recently advanced nations utilize evaluation system about LCC, and KOREA begin to introduce the system to reduce construction expense. And Introducing "Technical proposal type bid" that is new government construction order mode made needs for valuation of price to evaluate facilities LCC. These days LCC is evaluated by BTL and turnkey project in KOREA, but it is suffering from difficulty in evaluation. because evaluation element and standard are indefinite. In addition LCC evaluation of public construction business except BTL and turnkey is not consisting. Therefore, in this research we present LCC evaluation Index for systematic and objective evaluation.

  • PDF

Tensile and fracture characterization using a simplified digital image correlation test set-up

  • Kumar, Abhishek;Vishnuvardhan, S.;Murthy, A. Ramachandra;Raghava, G.
    • Structural Engineering and Mechanics
    • /
    • v.69 no.4
    • /
    • pp.467-477
    • /
    • 2019
  • Digital image correlation (DIC) is now a popular and extensively used full-field metrology technique. In general, DIC is performed by using a turnkey solution offered by various manufacturers of DIC. In this paper, a simple and economical set-up for DIC is proposed which uses easily accessible digital single-lens reflex (DSLR) camera rather than industrial couple-charged device (CCD) cameras. The paper gives a description of aspects of carrying a DIC experiment which includes experimental set-up, specimen preparation, image acquisition and analysis. The details provided here will be helpful to carry DIC experiments without specialized DIC testing rig. To validate the responses obtained from proposed DIC set-up, tension and fatigue tests on specimens made of IS 2062 Gr. E300 steel are determined. Tensile parameters for a flat specimen and stress intensity factor for an eccentrically-loaded single edge notch tension specimen are evaluated from results of DIC experiment. Results obtained from proposed DIC experiments are compared with those obtained from conventional methods and are found to be in close agreement. It is also noted that the high resolution of DSLR allows the use of proposed approach for fracture characterization which could not be carried out with a typical turnkey DIC solution employing a camera of 2MP resolution.

Some Practical Issues on the International Construction Contract (국제건설계약(國際建設契約) 실무상(實務上) 유의점(有意點))

  • Kim, Seung-Hyeon
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.25
    • /
    • pp.3-40
    • /
    • 2005
  • Many Korean construction companies have been performing a variety of overseas construction projects since the 1970s. It is unfortunate that in many cases they have had to suffer big losses caused by errors and defects in the design and construction of the projects. In the author's opinion, however, there were losses that could have been avoided if they had understood better the feature and content of the particular construction contract. Few lawyers and scholars in Korea have been interested in the research and study of international construction contracts. This is mainly because they do not have access to practical sources outside of Korea for them to research and study since the contracts undertaken have been dealt with by law firms in other jurisdictions to which the disputes apply. This article is aiming primarily at the introduction of the issues which the practitioners are likely to confront in the process of reviewing and performing the international construction contract. In some cases solutions are sought about these issues based upon the FIDIC standard terms and conditions, the actual experience of practice, and UNIDROIT Principles, etc. It is reasonable to say that all the issues related to the international construction contract cannot be covered in a short article like this. The author wishes this article could induce subsequent studies on international construction contracts for further research. It has to be noted that from time to time Korean construction practices have been compared to the international ones for better understanding. This article mostly includes cases where the Korean construction companies go overseas for their projects, while there are some cases where foreign developers and financial investors participated in domestic projects in which international construction contracts forms were adopted. A few precedent domestic writings about international construction contracts seems to lack emphasis on the points that there are several standard construction contract forms and that they are different. The differences are mainly in accordance with who bears the design responsibility, how the owner has to make progress payments to the contractor and who the funding source for the project is. This article tries to make it clear that there are significant differences between the standard contract forms, e.g. a simple construction form, a design-build form and an EPC/turnkey form of contract. Again, the author hopes that this article can arouse the interest in the international construction contracts from both academic and practical fields, so that many subsequent advanced articles can help our construction industry become much more competitive in the world through awareness of the methods of procurement and administration of the contracts.

  • PDF

Case Studies for Temporary Soil Support Walls of Subway No.9 (지하철 9호선 흙막이 구조물의 설계 사례 분석)

  • 주재건;김영진;김경태
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.96-103
    • /
    • 2002
  • In this study, design concepts of Seoul Subway Construction (901∼914) are reviewed in relation to the cases for temporary soil support wall systems which are revealed in highly developed design competitions such as Turnkey and Alternative based on. Especially soil and rock properties, various design schemes for dealing with soil and water pressures, new technology adopted etc are discussed very profoundly and broadly for the better understanding and additional clues for constructing new design technologies.

  • PDF