A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

The Development of Life Cycle Cost Evaluation Index for Public Facilities (공공시설물의 생애주기비용 평가기준 개발)

  • Kim, Tae-Hui;Gu, Bon-Hak;Kim, Ok-Gyu;Park, Tae-Keun;Lee, Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.216-224
    • /
    • 2008
  • Recently, most developed countries use the evaluation system about Life Cycle Cost(LCC), and KOREA is beginning to introduce the system to reduce construction expenses. And the introduction of "Technical Proposal Type Bid", which is a new procurement method of Korea government, has made needs for the price-valuation way to evaluate facilities LCC. These days, LCC has been being evaluated by BTL and turnkey project in KOREA, which is suffering from difficulties in evaluating it, because evaluation elements and standards are vague. In addition, LCC evaluation in public construction business except BTL and turnkey is not carried out. Therefore, this paper is to develop a new evaluation index to evaluate LCC both systematically and objectively. The results of this paper are as followings. (1) Necessity and problem analysis of LCC evaluation index, (2) LCC evaluation index deduction from the technical report and question analysis, (3) Application and evaluation method suggestion to practice.

Study on life cycle of LRT systems and technology development applied system engineering (경량전철 차량시스템 생명주기와 시스템엔지니어링 적용기술개발에 관한 고찰)

  • Lee, Seong-Gwon;Jeon, Seo-Tak;Jung, Kye-Young;Kim, Jae-Jin;Chung, Su-Young
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1629-1635
    • /
    • 2011
  • Because LRT project is large infrastructure projects investing enormous budget and required continuous maintenance after construction, it is the global trend to perform business in terms of life-cycle from the initial construction, operation to disposal. It is very important LRT to manage interfaces efficiently and to integrate vehicle, civil, track, electricity, communications, signals, operations, facilities organically. Global companies of the railway developed countries including Europe are getting orders a large rail project and preempting the world market based on engineering technology. But, domestic LRT systems engineering is the subcontracting level to the lack of practical skills and experience. Thus, technology securement is very urgent for the independence of systems engineering technology and overseas advance based turnkey. In this paper, we are going to study applicable systems engineering technology focusing on LRT system based on international standard ISO/IEC 15288.

  • PDF

A Study of the Construction Contracts and Delivery System for Nuclear Power Plant (원전건설 발주 및 계약체계에 대한 고찰)

  • Seo, Yong-Tok;Won, Seo-Kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.233-235
    • /
    • 2012
  • Continually having growed up overseas construction market for new Nuclear Power Plant(NPP), the exports of Korean Reactor emerges as the key task of National Nuclear Business. The objective of this study is to strengthen the competitiveness of Korean Reactor through the improvement of Construction Project Contract & Delivery System for NPP. This study suggests the method for increasing Korean Reactor's competitiveness of exports by analyzing the business environment of foreign market and comparing Contract & Delivery System between domestic and foreign.

  • PDF

CAD for styling design

  • Park, Sehyung;Lee, Chong-won;Kim, Jin-oh
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1987.10a
    • /
    • pp.780-785
    • /
    • 1987
  • The measuring point data of clay model are widely used to design parts whose external features are important design factor such as automobiles and general die products. This paper presents a method for improving the process to generate smooth surfaces from the measuring point data using turnkey CAD/CAM system. The process of smooth-surface generation involves several steps: styline finding, curve fairing, surface generation and filleting. The process is improved by automatic curve fairing, local correction of surface and multi-boundary surface treatment. An automobile bumper and a telephone receiver are measured and modeled to test the new method. Significant time saving is resulted by changing interactive mode to automatic mode and eliminating inefficient loop of surface generation process.

  • PDF

Case Studies of the Software Development Applying EVM(Earned Value Management) (소프트웨어개발 프로젝트에서의 획득가치관리(EVM) 적용 사례 연구)

  • Jun, Sung-Chul;Kim, Ja-Hee
    • Journal of Information Technology Services
    • /
    • v.7 no.3
    • /
    • pp.129-144
    • /
    • 2008
  • The uncertainty of software projects makes a big gap between the initial schedule/expense and the final one. Moreover, it is difficult for a project manager to reschedule and re-budget for reflecting the effects of changes in the software development. In this paper, we suggest EVM (Earned Value Management) to control the schedule and the expenses of an on-going software development project. In order to apply EVM to a software project, we consider turnkey contracts and propose the way to calculate the earned value for the software development. Finally, we illustrate our method with the case of N-company. We expect our EVM help to analyze and to predict the final schedule and the expense of a software development project.

An Implementation Analysis of Design VE to Turn-key and Alternative Project (턴키 및 대안입찰사업의 설계VE 성과분석)

  • Kim, Ki-Han;Lee, Hyun-Suk;Lim, Hee-Dong;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1011-1014
    • /
    • 2007
  • Design VE system in order to promote the economical efficiency and the functional elevation of construction facilities apply to conatruction over 10 billion from december 2005. But it don't achieve purpose of VE original to maximization of value creation through VE because VE perform formal and result center. This study suggests some idea and analyse implementation of design VE through design VE case of turnkey and alternative project performed in domestic.

  • PDF

Power Cost Analysis of Go-ri Nuclear Power Plant Units 1 and 2

  • Chung, Chang-Hyun;Kim, Chang-Hyo;Kim, Jin-Soo
    • Nuclear Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.101-116
    • /
    • 1976
  • An attempt is made to analyze the unit nuclear power cost of the Go-ri units 1 and 2 in terms of a set of model data. For the calculational purpose, the power cost is first decomposed into the cost components related to the plant capital, operation and maintenance, working capital requirements, and fuel cycle operation. Then, POWERCO-50 computer code is applied to enumerate the first three components and MITCOST-II is used to evaluate the fuel cycle cost component. The specific numerical results are the fuel cycle cost of Go-ri unit 2 for three alternative fuel cycles presumed, levelized unit power cost of units 1 and 2, and the sensitivity of the power cost to the fluctuation of the model data. Upon comparision of the results with the power cost of the fossil power plants in Korea, it is found that the nuclear power is economically preferred to the fossil power. Nevertheless, the turnkey contract value of Go-ri unit 2 appears to be rather expensive compared with the available data on the construction cost of the PWR plants. Therefore, it is suggested that, in order to make the nuclear power plants more attractive in Korea, the unfavorable contract of such kind must be avoided in the future introduction of the nuclear power plant. Capacity factor is of prime importance to achieving the economic generation of the nuclear electricity from the Go-ri plant. Therefore, it is concluded that more efforts should be directed to make the maximum use of the Go-ri plant.

  • PDF

Improved Scheme to Manage Engineering Man-hour in a Plant Project (플랜트 프로젝트에서의 설계시간 관리 기법 개선 방안에 관한 연구)

  • Shin, Ji-Roh;Moon, Seung-Jae;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.5 no.1
    • /
    • pp.51-59
    • /
    • 2009
  • The global plant construction market has grown dramatically since 2000. As the market grows, domestic EPC contractors are expanding to meet its needs and have made great strides in terms of economic indicators from a decade ago. Larger projects involve a number of risk factors, such as volatile oil prices, however, and thus require quantitative and elaborate project management techniques for the ultimate success of a project's profitability. In addition, many Korean companies face difficulties in predicting potential risks and problems due to a lack of experience in dealing with the global market trend toward projects based on the Cost-re(Cost Reimbursable) contract as opposed to those based on the LSTK(Lumpsum Turnkey) contract. This study will examine methods and types of man-hour management according to plant project contract types. Further, it will explore the man-hour management system for successful completion of projects by satisfying the client's needs and enhancing the convenience in engineers' using the system. Additionally, this study will analyze the current system and identify its problems to address potential problems.

  • PDF

Characteristics of Particle Size Distributions Generated in the Vicinity of Building Blasting Demolition Sites (발파해체현장에서 발생하는 순간분진의 입경분포 특성)

  • Lee, Kyoung-Hee;Kim, Hyo-Jin;Park, Chan-Gyu;Ko, Kwang-Baik
    • Journal of Environmental Science International
    • /
    • v.18 no.1
    • /
    • pp.41-47
    • /
    • 2009
  • In building demolition work, major dust-generating activities are blasting concrete and rock. The aim of this study was to find the characteristic of particle size of dusts which were generated during building demolition work using explosion. The DustMate of the Turnkey-Instruments Ltd. was used for particulate size-selective sampling of the four sites. TSP(Total Suspended Particle), PM10(Particle Matter $10{\mu}m$), PM2.5(Particle Matter $2.5{\mu}m$), and PM1.0(Particle Matter $1.0{\mu}m$) were measured during building demolition work using explosion. The large particulate (higher than the diameter $10{\mu}m$) showed to be higher than 50%. The particulate ranged from $10{\mu}m\;to\;2.5{\mu}m$ showed about 30-40%. PM2.5 was not scarcely detected in the samples collected for building demolition work using explosion. We conclude that the dust generated during building demolition work using explosion has not most respirable particulate.