• Title/Summary/Keyword: Turnkey

Search Result 55, Processing Time 0.031 seconds

Prototype Hardware Design and Optimal Algorithm of PC Based Start·Stop Control System for Tidal Generation (조력용 PC 기반 기동·정지 제어시스템의 최적화 알고리즘과 시제품 하드웨어 설계)

  • Kim, Yoon-Sang;Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.2
    • /
    • pp.89-94
    • /
    • 2014
  • Tidal generation has become one of environmentally friendly new and renewable future sources of energy. The Sihwa Tidal Power Plant in South Korea, which was imported from abroad by turnkey type in 2011, connected to the power system in 2012, and is currently under commercial operation. However, leading companies are reluctant to disclose their technologies associated with the control systems and are not cooperative in technology transfers, making it a high priority to develop core technologies in South Korea. In order to develop a start stop control system for tidal generation, this paper presents the optimal algorithm for decision making and prototype of hardware design. First, control systems in tidal power, such as plant operation control, data interfaces between systems, monitoring and control points of the control system, are analyzed. The software development and PC based emulator processes for optimization algorithm processing are described. Finally, verification of the algorithm implementation, hardware platform for start stop control device, and implementation of prototype control system were discussed.

CONSTRUCTION SCHEDULE DELAY RISK ASSESSMENT BY USING COMBINED AHP-RII METHODOLOGY FOR AN INTERNATIONAL NPP PROJECT

  • HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
    • Nuclear Engineering and Technology
    • /
    • v.47 no.3
    • /
    • pp.362-379
    • /
    • 2015
  • In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.

Development of Start·Stop Control System at Water Turbine Generator for Tidal Power Plant (조력발전소를 위한 수차발전기의 기동·정지 제어시스템 개발)

  • Cho, Byong-Og;Park, Chul-Won
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.28 no.6
    • /
    • pp.106-112
    • /
    • 2014
  • Recently, tidal power generation has gained much attention. South Korea's tidal power generation systems were imported from abroad by turnkey type and have being operated. Therefore, for efficient operation and technological independence of a tidal power system, development of core technology is required. This paper deals with the start stop control system of water turbine generator in the tidal power plant, as one of our development project results. Using the SCADA system, the status and operations of water turbine generator in the tidal power plant, as well as simulation for calculation of maximum power were carried out. A small model type of start stop control device was also developed. In addition, the control system in Sihwa tidal power plant was modeled, and the results obtained by the dynamic simulation were given in graphics by 2D simulator.

Analysis of Factors Affecting Successful Bid Price in Public Construction Technical Bidding (공공공사 기술형 입찰에서의 낙찰가격에 미치는 요인 분석)

  • Lee, Jung-Woong;Yi, Sung-Wook
    • Asia-Pacific Journal of Business
    • /
    • v.13 no.1
    • /
    • pp.213-230
    • /
    • 2022
  • Purpose - The purpose of this study is to find out any potential factors for explanatory variables when calculating the virtual successful bid rate in case of no collusion. Design/methodology/approach - An empirical analysis was conducted in this study with a regression analysis that included 725 bid samples under the public construction technical type bidding. Findings - The result of the basic analysis showed that there are several factors affecting the successful bid rate. First, collusion variable; second, government variable; third, successful bidder design score variable and the number of bidder variable among bidding features; fourth, turnkey variable based on the alternative method; fifth, civil works variable and plant works variable based on building work; sixth, asset variable and the fourth-quarter performance difference variable. However, the technical proposal method variable among bidding features was found to be statistically insignificant in column(4). Research implications or Originality - The significance of this research is that new variable such as the government variable and the fourth-quarter performance difference variable were added in the regression model, which showed statistically significant research results.

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

Problem Analysis and Improvement Strategy for Feasibility Analysis of Overseas Plant Construction Projects (해외 플랜트 건설사업의 타당성 분석 문제점 및 개선방안)

  • Lee, Won-Gyu;Park, Moon-Sun;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.3-14
    • /
    • 2010
  • This study investigated and analyzed feasibility analysis case studies, carried out by contractor of EPC LSTK projects in the planning stage to suggest the strategies to solve problems for project improvement. For this, five feasibility analysis case studies of gulf cooperation council (GCC) countries were reviewed and investigated. The results can be summarized as follows: 1) Those factors needed to be analyzed, including cost increase, project delay, quality decrease were insufficiently considered when assessing feasibility. 2) And improvement strategies for three problems mentioned above were suggested based on findings in feasibility analysis. 3) Lastly the process of the project feasibility analysis that can be applied to overseas plant construction project was suggested step by step.

Extraction of Road Surface Freezing Section using GIS (GIS를 이용한 도로의 노면결빙구간 추출)

  • Choi, Byoung-Gil;Kim, Joong-Sik
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.13 no.4 s.34
    • /
    • pp.19-25
    • /
    • 2005
  • This study suggests a method for securing road safety by extracting the expected surface freezing section in planning a route using GIS. When planning a road construction in a mountainous area it is possible to confront surface freezing especially in the wintertime. In addition, it is required assessment data of surface freezing rates in the case of turnkey inspections of newly constructed or expanded roads. Consequently, an analysis method that can quantitatively estimate the surface freezing section and sunshine influence on each section of a road is needed. We can extract the expected surface freezing section which amounted to around 29km of the Donghae highway, with such techniques as three-dimensional modeling, sunshine simulation geographical database construction and spatial analysis using the overlay function of the GIS spatial analysis. This study can be used as a method to assess advance safety which has a direct influence on planning the blueprint that should be approved by a policy maker after efficiently understanding the expected surface freezing section in accordance with hill shade.

  • PDF

Identification of Contractual Risk Factors for Application in the Overseas Construction Projects based on FIDIC Red Book 1999 Edition (해외건설공사관련 계약적 리스크 인자에 대한 연구 - FIDIC Red Book 1999년판 기준 -)

  • Hyun, Hak-Bong;Park, Hyung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1153-1160
    • /
    • 2016
  • There have been many studies on the subject of risks in the Construction Industry and many useful results have been produced. However, risk studies on the conditions of contract, which is the most critical contract documents, has not been tried despite of its contractual function in the overseas projects. In this study, various contractual risks are identified for proper and reasonable evaluation of the contractual risks possibly encountered in the Tender and/or Contract stages of the Projects. For development of study, FIDIC Red Book 1999 Edition which is world widely recognised as a standard conditions of contract prepared for the projects designed by the Employer. Contractual risks are divided into three levels and applicable clauses are assigned to each appropriate risk factors. And table of major contractual risk factors are made using the classified levels of each factors with evaluation criteria as a result of this study. As this study is made only for the conditions of contract which is prepared for the construction contracts designed by the Employer, further studies for other types of contracts such as Design-Build (FIDIC Yellow Book), EPC/Turnkey (FIDIC Silver Book) and recently developed Design, Build and Operate type of contract (FIDIC Gold Book) are required to cover various types of projects executed in the world construction markets.

A Checklist for Assessment of Risks Involved in IT Service Project Contract (IT 서비스 프로젝트 계약서 위험 요인 평가 체크리스트)

  • Jeong, Eun Joo;Jeong, Seung Ryul
    • Journal of Internet Computing and Services
    • /
    • v.15 no.4
    • /
    • pp.57-65
    • /
    • 2014
  • Risk factors are the reason behind cost overruns and delays in long-term large-scale IT service projects. Major risks originate from the integration of complex IT system components, including software, hardware, and solutions; the competitive bidding process; the turnkey and firm-fixed price nature of contracts; and the project execution environment. We have identified several risk factors such as delay in acceptance, low quality of deliverables, delay in payment, adding and changing requirements and scope, unclear definition of roles and responsibilities of the buyer and supplier, and unclear procedures of change and quality management during the project execution phase. One needs to manage risks proactively before signing the contract. In order to weed out or lower the risk factors well in advance, we need to identify and remove risk factors contained in contract clauses and attached contract documents. We propose a checklist for assessing IT service project contracts. To validate the checklist's utility, we applied it to an IT service project in the finance industry. The results show that the checklist is effective in identifying and removing risk factors pertaining to IT service projects.

A Case Study on the Limitations of the Choice of Law caused by Internationally Mandatory Rules in Entering into the Turn-Key Contracts (턴키계약체결시 국제적 강행규정에 의한 준거법 제한에 관한 사례연구 - Clough Engineering Ltd v Oil & Natural Gas Corp Ltd 사건을 중심으로 -)

  • Oh, Won-Suk;Kim, Yong-Il
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.54
    • /
    • pp.145-166
    • /
    • 2012
  • This article examines the limitations of the choice of law caused by Internationally Mandatory Rules in Entering into the Turn-Key Contracts. In June 2007, Clough Engineering, a corporation based in Western Australia, approached the Federal Court of Australia seeking injunctive relief and leave to commence proceedings against an entity located outside Australia, the Oil & Natural Gas Corp of India (ONGC). Clough had contracted with ONGC to provide a range of services in relation to the construction of gas and oil wells off the coast of India. The contract was governed by Indian law, and included a clause by which the parties agreed to submit their disputes to arbitration. Yet the Federal Court assumed jurisdiction over the dispute, principally because Clough had framed its claim as a plea for relief for contraventions of Australia's Trade Practices Act 1974. The result of this cases that it is possible for an arbitral tribunal to hear a claim made under the Trade Practices Act even if that claim arises "in connection with"a contract the proper law of which is not the law of Australia. However, in Transfield Philippines Inc v Pacific Hydro Ltd, the turnkey contract included a choice of law provision, selecting the law of the Philippines, and a clause providing that all disputes arising out of or in connection with the agreement were to be arbitrated under the ICC Rules, with the seat in Singapore. Hearings were in fact conducted in Melbourne, Australia, although all awards were published in Singapore. The result of this cases that it would not be appropriate for an Australian court to adjudicate claims for misrepresentation under Australian statutes dealing with misleading and deceptive conduct, once the arbitral tribunal had determined, applying appropriate choice of law rules, that such claims are governed by the law of the Philippines. To do so would lead to a multiplicity of proceedings, usurp the jurisdiction of the tribunal and deny the intention of the parties as expressed by them in the arbitration agreement. In short, the Internationally Mandatory Rules as an active part of public order create limitation of party autonomy in choice of law rules in a different way. The court is fully entitled to refuse to use those rules of law applicable on the contract which are in the contradiction to the internationally mandatory rules of law of the forum. And the court may give an effect to those Internationally Mandatory Rules that form a part of a law of foreign country when deciding about applicability of certain rules of applicable law.

  • PDF