Development of a Simulator and Algorithm Test for Selective-breaking Integrated Protective Relay for Ungrounded DC Traction Power Supply System (DC 비접지 급전계통 선택차단형 통합보호계전기 시뮬레이터 개발 및 알고리즘 테스트)

  • An, Tae-Pung;Yun, Jun-Seok;Jung, Tae-Young;Kim, In-Woong;Jung, Ho-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.6
    • /
    • pp.899-904
    • /
    • 2012
  • In recent years, a lot of research was done for earth fault protection in ungrounded dc power supply system. As a result, selective-breaking integrated protective relaying system is developed in progress and is currently field-testing are planned. Algorithm on a PC using PSCAD done a lot of testing before performing field tests, but in this study developed algorithms and functions needed to determine whether they were operating normally. Therefore, simulated system is similar to the actual situation was required and made. selective-breaking algorithm verification and validation was performed with simulator.

An Evaluation of Selective Grounding Fault Protective Relaying Technique Performance on the Ungrounded DC Traction Power Supply System (도시철도 직류 비접지 급전계통에서의 선택 지락보호시스템의 성능평가)

  • Jung, Hosung;Kim, Joouk;Shin, Seongkuen;Kim, Hyungchul;An, Taepung;Yun, Junseok
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1964-1969
    • /
    • 2012
  • This paper presents to verify the selective grounding fault protective relaying technique for the ungrounded DC traction power supply system. This system selectively blocks fault section when grounding fault occurred. In order to perform this verification, field test facilities have been installed on Oesam substation and Worldcup-Stadium substation, and field test process has been suggested. Also, selective grounding fault protective relaying components and rail voltage reduction device have been tested with the various trial examinations. In order to compare and evaluate performance of the selective grounding fault protective relaying function, field test system was modeled and the system fault simulation results were compared and evaluated with the field test result. Performance of selective grounding fault protective relaying function was evaluated with the above-mentioned process, and the fact that the system recognizes fault section irrespective of insulation between rail and ground and fault resistance from grounding fault.

Algorithm of Detecting Ground Fault by Using Insulation Monitoring Device(IMD) in Ungrounded DC System (직류 비접지계통에서 절연저항측정장치(IMD)를 이용한 사고검출 알고리즘)

  • Kim, Ki-Young;Lee, Hu-Dong;Tae, Dong-Hyun;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.528-535
    • /
    • 2020
  • Recently, the protection coordination method of DC systems has been presented because renewable energy and distributed resources are being installed and operated in distribution systems. On the other hand, it is difficult to detect ground faults because there is no significant difference compared to a steady-state current in ungrounded IT systems, such as DC load networks and urban railways. Therefore, this paper formulates the detection principle of IMD (Insulation Monitoring Device) to use it as a protection coordination device in a DC system. Based on the signal injection method of IMD, which is analyzed by a wavelet transform, this paper presents an algorithm of detecting ground faults in a DC system in a fast and accurate manner. In addition, this paper modeled an IMD and an ungrounded DC system using the PSCAD/EMTDC S/W and performed numerical analysis of a wavelet transform with the Matlab S/W. The simulation results of a ground fault case in an ungrounded DC system showed that the proposed algorithm and modeling are useful and practical tools for detecting a ground fault in a DC system.

Calculation methods for the rail potential rise and the stray current in the ungrounded DC traction system (비접지 급전시스템에서의 레일전위상승과 누설전류 계산)

  • Chung, Sang-Gi;Park, Hyun-Joon;Kwon, Sam-Young;Bai, Chang-Han
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.631-635
    • /
    • 2006
  • DC traction power system is operated ungrounded to minimize the stray current. This causes rail potential increase and makes hazardous condition to the person in touch with running rails. To prevent the hazardous condition, maximum allowable limits on rail potential rise are set by regulations in advanced foreign countries. In this paper, the simplified calculation methods for the rail potential rise and the stray currents are discussed.

  • PDF

Analysis for Pole to Ground Fault Detection in Ungrounded LVDC Distribution Network (비접지 LVDC 배전망의 지락고장 검출을 위한 분석)

  • Park, Chul-Won
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.67 no.3
    • /
    • pp.119-124
    • /
    • 2018
  • Recently, LVDC distribution network and DC microgrid with many advantages are being built. However, this LVDC distribution is an IT grounded or ungrounded system, and it is difficult to detect a ground fault because the fault current is small. In this paper, we propose a signal injection method for unipolar LVDC distribution network to detect ground fault in ungrounded LVDC distribution, and various analyzes were performed for ground fault detection.

Integrated Protection Method for DC Railway Systems (통합형 직류철도 보호계전 방식)

  • Kang, Sang-Hee;Choi, Chang-Young;Lee, Won-Seok;Jung, Ho-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.2
    • /
    • pp.285-292
    • /
    • 2011
  • DC traction power system is operated ungrounded so that minimize the stray current. Because the stray current is still present, a rail potential is increased. The ground faults in the DC railway systems are usually detected by a potential relay(64P). Moreover, if the rail potential goes high in the ordinary operating state because of the traction load, the potential relay would be maloperated. A presented protective relaying algorithm that can identify exactly the faulted region and can distinguish a ground fault from the potential rising of the rail is presented in this paper. This paper presents simulation technique that is very similar to the real operation situation using PSCAD/EMTDC.

A Analysis of DC Control Circuit Transient and a Study of Auxiliary Relay Design Compatability in the Power Plant (발전소 직류 제어회로 과도현상 분석 및 보조계전기 선정 적합성 검토)

  • Seon, Hyun-Gyu;Hong, Young-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1948_1949
    • /
    • 2009
  • All the power generating station require dc auxiliary power systems to operate those dc components that must be available if a loss of ac power occur. Some examples of such components are auxiliary motors, circuit breakers, relays and solenoids. The dc source may be one common battery for both power and control or two separate batteries; one for power and another for control. Typically, a dc auxiliary power system is designed as an ungrounded system, instead of grounded system, so that a low-resistance ground fault on one of its two polarities will not affect the operation of the system, thus increasing system reliability and continuity of service. A ground detector should provide a high polarity-to-ground resistance so that a single ground fault occurring on the system will not affect the operation of that system. Sensitive relays have been known to energize momentarily while the cable and capacitive charge to ground shifts[1]. A power station had experienced this kind of incident and performed root cause analysis based on PC based simulation program known as PSpice. This simulation showed adapted relays on the system energize momentarily and design criteria on this relay should be corrected.

  • PDF

Development of Ground Fault Protective Relaying Schemes for DC Traction Power Supply System (DC 급전시스템의 지락보호계전시스템 개발)

  • Chung Sang-Gi;Jeong Rag-Gyo;Cho Hong-Sik;Lee Ahn-Ho;Kwon Sam-Young
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.9
    • /
    • pp.427-433
    • /
    • 2005
  • In DC tracking power supply system, ground faults are currently detected by the potential relay, 64P. Though 64P relay detects ground fault, it cannot Identify the faulted region which causes long traffic delays and safety problem to passengers. Two new ground fault protective relay schemes that can identify the faulted region are presented in this paper. One is bus differential protective relay and the other is ground overcurrent protective relay. Both type of relays is similar in principle to the ordinary bus differential protective relay and the ground overcurrent relay used in other power system. In DC traction power supply system, since it is ungrounded, ground fault current is not big enough to operate those relays. To solve the problem, a current control device, called device 'X', is newly introduced in both system, which enables large amount of ground fault current flow upon the positive line to ground fault. Algorithms for these relays are developed and their validity are verified by EMTP simulation.

Improvement of Naval Combat System UPS under Abnormal Transients (비정상 과도상태에서의 해군 전투체계 UPS 개선)

  • Kim, Sung-Who;Choi, Han-Go
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.19 no.3
    • /
    • pp.97-103
    • /
    • 2018
  • This paper addresses an improved naval combat UPS(Uninterruptable Power Supply) system under abnormal transients. Previously, thermistor and varistor elements were used to cope with transient overvoltage and overcurrent, however the UPS was frequently unavailable because it was vulnerable to abnormal transient voltage generated during system operation. In order to overcome this problem and protect UPS system, this paper proposes an input power cut-off circuit that detects the initial input power and abnormal transient voltage generated during operation, improvement of power control sequence, and a method to prevent malfunction of an inverter and CPU. The UPS system implementing the proposed method was simulated by input power variable test using programmable AC/DC generator, and finally validated its reliability and stability through field tests by mounting on multifunctional console of naval combat system.