• Title/Summary/Keyword: VE

Search Result 1,124, Processing Time 0.036 seconds

The Efficiency Scheme of Design VE through the Case Studies of Construction VE for Apartments (공동주택 시공VE 사례분석을 통한 설계VE 효율화방안)

  • Kim, Yong-Su;Kim, Young-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.4
    • /
    • pp.59-67
    • /
    • 2010
  • The purpose of this study is to efficiency scheme to design VE through the case studies of construction VE forapartments. The adapted research method includes five case studies of construction VE and analysis of constructionVE practice. The results of this study are as follows 1) For efficiency of design VE, data management system whichis necessary for construction VE database establishment and its application were proposed. 2) Through workingsystem improvement of construction VE, an improvement to design VE performance process was proposed. 3)Consideration factors and main VE items for efficient design VE item selection of apartment buildings wereproposed.

Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

The Case Analysis on the Road-Crossroad Design VE Competition (도로교차로 설계VE 경진대회 사례분석)

  • Kim, Ki-Han;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.839-842
    • /
    • 2008
  • Construction VE is the system introduced in order to reduce the life cycle cost and promote the performance of construction facilities, used in architecture and civil construction since apply to construction over 10 billion from december 2005. But yet it is short of VE specialist and it is not a purpose in maximization of value creation through VE but strong better awareness of tool for budget reduce. This study tries to contribute to qualitative advance of design VE by analyze substantial degree of VE Procedure and VE result by Job Plan used widely in domestic an object design VE competition case to crossroad.

  • PDF

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

An Implementation Analysis of Design VE to Turn-key and Alternative Project (턴키 및 대안입찰사업의 설계VE 성과분석)

  • Kim, Ki-Han;Lee, Hyun-Suk;Lim, Hee-Dong;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1011-1014
    • /
    • 2007
  • Design VE system in order to promote the economical efficiency and the functional elevation of construction facilities apply to conatruction over 10 billion from december 2005. But it don't achieve purpose of VE original to maximization of value creation through VE because VE perform formal and result center. This study suggests some idea and analyse implementation of design VE through design VE case of turnkey and alternative project performed in domestic.

  • PDF

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

Implementation Status and Improvement Strategy of the Value Engineering in Domestic Construction Industry (국내 건설VE 운영현황과 발전방향)

  • Seo, Yong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.137-144
    • /
    • 2007
  • In the year of 1980 and 2000, the Korean government institutionalized the Value Engineering methodology in the construction phase and the design phase respectively. While design-phase VE have been applied to construction industry actively, which was institutionalized 7 years ago, construction-phase VE have not been applied to industry frequently, although it was institutionalized 25 years ago. On the other hand, at the time of social demands for VE is increasing, it has been pointed out that VE should be compatible with the delivery system. And the time of VE study, the operational management of VE study, and the maintenance process of the result of the VE study also should be considered. In this study, a scheme to improve VE methodology in the construction industry is proposed based on the literature review and the data analysis of domestic and foreign state of VE.

  • PDF

The Conceptual Model of Web-Based Information System for Value Engineering(WISE) in Construction Projects (건설사업 웹 기반 VE 정보시스템의 개념 모델)

  • Lee Jae-ho;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.167-177
    • /
    • 2005
  • Value Engineering(VE) Workshop executes many tasks with VE team members from various experts of construction field on the basis of VE Job Plan for a short period of time. However, the VE team members are not useful with using VE information until now because it is not systematic in the accumulation and application of VE information. Especially, these problems constitute the obstacles to communication, reliability and quickness of VE information. It also causes an increase of time and cost at VE Workshop. Therefore, the results of this study suggests the conceptual model of Web-Based Information System for VE(WISE) in order to improve the effectiveness of VE Workshop and solve the problem as is stated above.

Understanding of Nondestructive Testing Technique (건설공사의 Value Engineering Study)

  • 최춘배
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.53-58
    • /
    • 2001
  • Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.

  • PDF

Application of Value Engineering to Early Design Phases in Construction Projects (건설사업 설계초기단계 VE 적용방안)

  • Lee Seung-Hoon;Koo Kyo-Jin;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.156-166
    • /
    • 2005
  • The purpose of this study is to present proper VE application methods to euly design phases. Since VE methodology is more effective on early stage of design phase, the study focused on application of VE methodology in early stage of design process. With the examination of past studies, obstacles of VE application in domestic construction industry are defined. To solve these problems, this paper presents (1) subdivision of VE execution time, (2) an appropriate VE targeting method for construction industry, (3) a resonable and practical function analysis process, and (4) modified design-VE job plan.