A study on pressurizer cutting scenario for radiation dose reduction for workers using VISIPLAN

  • Lee, Hak Yun;Kim, Sun Il;Song, Jong Soon
    • Nuclear Engineering and Technology
    • /
    • 제54권7호
    • /
    • pp.2736-2747
    • /
    • 2022
  • The operations in the design lifecycle of a nuclear power plant targeted to be decommissioned lead to neutron activation. Operations in the decommissioning process include cutting, decontamination, disposal, and processing. Among these, cutting is done close to the target material, and thus workers are exposed to radiation. As there are only a few studies on pressurizers, there arises the need for further research to assess the radiation exposure dose. This study obtained the specifications of the AP1000 pressurizer of Westinghouse and the distribution of radionuclide inventory of a pressurizer in a pressurised water reactor for evaluation based on literature studies. A cutting scenario was created to develop an optimal method so that the cut pieces fill a radioactive solid waste drum with dimensions 0.571 m × 0.834 m. The estimated exposure dose, estimated using the tool VISIPLAN SW, in terms of the decontamination factor (DF) ranged from DF-0 to DF-100, indicating that DF-90 and DF-100 meet the ICRP recommendation on exposure dose 0.0057 mSv/h. At the end of the study, although flame cutting was considered the most efficient method in terms of cutting speed, laser cutting was the most reasonable one in terms of the financial aspects and secondary waste.

External exposure specific analysis for radiation worker in reuse of containment building for Kori Unit 1

  • Byon, Jihyang;Park, Sangjune;Kim, Yangjin;Ahn, Seokyoung
    • Nuclear Engineering and Technology
    • /
    • 제54권5호
    • /
    • pp.1781-1788
    • /
    • 2022
  • The containment building Kori Unit 1 may require sequential steps for full decommissioning. This study assumes that the containment building is to be used as an auxiliary building that handles nuclear power systems and materials during decommissioning before conversion into a greenfield. Through the derivation of guidelines and dose evaluation, it was confirmed whether the radiation workers were satisfied with the ALARA decision. The specific modeling of the external radiation exposure was performed based on the facility investigation procedures. The external radiation specific derived concentration guideline levels (DCGLs) for radiation workers in containment building were obtained using the RESRAD-BUILD code and were applied to the VISIPLAN 3D ALARA Planning Tool code to calculate the working dose and check worker safety. The derivation of site-specific and realistic DCGLs and dose evaluation via 3D modeling can contribute to the scenario development for the decommission and remediation of containment building.

External dose assessment for workers dismantling the bio-shield of a commercial power nuclear reactor: Case study of Kori-1, Korea

  • Lee, ChoongWie;Lee, Donghyun;Kim, Hee Reyoung;Lee, Seung Jun
    • Nuclear Engineering and Technology
    • /
    • 제52권9호
    • /
    • pp.2085-2091
    • /
    • 2020
  • The license for Kori-1, the first commercial reactor in Busan, Korea, was terminated in June 2017; therefore, preparations are being made for its decommissioning. Because the radioactivity of Bio-shield varies greatly throughout the structure, the doses received by the workers depend on the location, order, and duration of dismantling operations. Thus, a model for evaluating the worker external dose during the dismantling of the Kori-1 bio-shield was developed, and work scenarios for dose assessment were designed. The Dose evaluation code VISIPLAN was used for dose assessment. The dose rate around the bio-shield was evaluated and the level of exposure to the operator was evaluated according to the work scenario. The maximum annual external dose was calculated as 746.86 mSv for a diamond wire saw operator under dry cutting conditions, indicating that appropriate protective measures, such as changing dismantling sequence, remote monitoring, shield installation, and adjustment of work team are necessary for the safe dismantling of the bio-shield. Through these protective measures, it was found that the worker's dose could be below the dose limit.

Radiological safety evaluation of dismantled radioactive concrete from Kori Unit 1 in the disposal and recycling process

  • Lee, ChoongWie;Kim, Hee Reyoung;Lee, Seung Jun
    • Nuclear Engineering and Technology
    • /
    • 제53권6호
    • /
    • pp.2019-2024
    • /
    • 2021
  • For evaluating the radiological safety of dismantled concrete, the process of disposal and recycling of the radioactive concrete generated during the dismantling of Kori Unit 1 is analyzed. Four scenarios are derived based on the analysis of the concrete recycling and disposal process, and the potential exposure to the workers and public during this process are calculated. VISIPLAN and RESRAD code are used for evaluating the dosages received by the workers and public in the following four scenarios: concrete inspection, transport of concrete by the truck driver, driving on a recycled concrete road, and public living near the landfilled concrete waste. Two worker exposure scenarios in the processing of concrete and two public exposure scenarios in recycling and disposal are considered; in all the scenarios, the exposure dose does not exceed the annual dose limit for each representative.

Radiological safety analysis of a newly designed spent resin mixture treatment facility during normal and abnormal operational scenarios for the safety of radiation workers

  • Jaehoon Byun;Seungbin Yoon;Hee Reyoung Kim
    • Nuclear Engineering and Technology
    • /
    • 제55권5호
    • /
    • pp.1935-1945
    • /
    • 2023
  • The radiological safety of workers in a newly developed microwave-based spent resin treatment facility was assessed based on work location and operational scenarios. The results show that the remote-operation room worker was exposed to maximum annual dose of 3.19E+00 mSv, which is 15.9% of the dose limit, thereby confirming radiological safety. Inside the pathway, annual doses in the range of 7.87E-02-2.07E-01 mSv were measured initially at the mock-up tank and later at the point between the spent resin separation and treatment parts. The dose of emergency maintenance workers was below the dose limit (4.08E-03-4.99E+00 mSv); however, before treatment (separation and microwave), the dose of maintenance and repair workers exceeded the dose limit. The doses of the effluent removal workers at the zeolite and activated carbon storage tank and spent resin storage tank were the lowest at 2.79E-01-2.87E-01 mSv and 9.27E-01 mSv in "1 h" and "4-5 h of operation", respectively. The immediately lower and upper layers of the facility room exhibited the highest annual doses of 1.84E+00 and 3.22E+00 mSv, respectively. Through this study, a scenario that can minimize the dose considering the movement of spent resin through the facility can be developed.