학교시설물 유지관리를 위한 공사 분류 체계 분석 (Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

원자력발전소 Work Breakdown Structure 개발 (Development of Work Breakdown Structure for Nuclear Power Plant)

  • 조영혁;양명덕
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

Work Structuring에 의한 시공 프로세스 개선방안에 관한 연구 (A Study of Improving Construction Process by Work Structuring)

  • 나경철;김창덕;박동식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.422-427
    • /
    • 2001
  • 건설프로젝트에서 현재 사용되고 있는 작업분류체계(Work Breakdown Structure)는 프로세스 내의 세부작업간 선·후행 관계의 불확실성과 작업의 불합리한 상호 연계성에 기인한 문제점을 내포하고 있다. 이를 해결하기 위해서 본 논문에서는 Work Structuring을 제시하여 프로세스간에 투명성을 부여하고 세부작업간의 간섭을 제거시켜 작업신뢰성을 향상할 수 있는 방안을 도출하였고 프로세스를 개선하기 위한 프로세스 디자인 다이어그램을 개발하였다. WS에 의한 프로세스 개선의 목적은 고객에게 가치를 창출시켜주면서 보다 신속하고 신뢰성 있는 작업 흐름을 만드는 것을 목적으로 하고 있으며 비가치 창출작업의 감소, 프로세스의 명료화 및 투명성 향상 등에 의의가 있다.

  • PDF

WBS 기반의 사업 및 시스템엔지니어링 관리 - 발사체 개발사업 적용사례 연구 (WBS-centric Program and Systems Engineering Management - Launch Vehicle Development Program Application Study)

  • 박창수;권병찬;김근택
    • 시스템엔지니어링학술지
    • /
    • 제13권1호
    • /
    • pp.67-72
    • /
    • 2017
  • Work breakdown structure is a central element in project management and systems engineering. Composing a quality work breakdown structure is essential for the success of any project. In this paper, extensive use of work breakdown structure during phase one of KSLV-II launch vehicle development program is presented. The advantages and disadvantages of applying WBS-centric program and systems engineering management to the project are reviewed.

학교시설 건설공사의 작업분류체계 구축 및 단위작업별 선후행 관계 분석 (Development of Work Breakdown Structure and Analysis of Precedence Relations by Activity in School Facilities Construction Work)

  • 방종대;손정락
    • 토지주택연구
    • /
    • 제8권3호
    • /
    • pp.189-200
    • /
    • 2017
  • The work breakdown structure and the precedence relations by work activity are very important because they are the basic data for estimating the construction duration in the construction work. However, there is no standard to accurately estimate the construction duration since the size of the school facilities construction is smaller than the general construction work. Therefore, some schools are unable to open in March or September and the delay of the construction duration can cause damage to the students. To solve this problem, this study developed a work breakdown structure of school facilities construction work and analyzed the precedence relations by work activities. The work breakdown structure of the school facilities construction is composed of three steps. The operations corresponding to level 1 and level 2 are as follows. (1) 2 preparatory work categories; preparation period and temporary construction. (2) 17 architectural work categories; temporary construction, foundation & pile work, reinforced concrete work, steel roof work, brick work, plaster work, tile work, stone work, waterproof construction, wood work, interior construction, floor work, metal work, roof work, windows construction, glazing work and paint construction. (3) 7 mechanic and fire work categories; outside trunk line work, plumbing work, air-conditioning equipment work, machine room work, city gas plumbing work, sanitation facilities and inspection & test working. (4) 4 civil work categories; wastewater work, drainage work, pavement work and other work. (5) 1 landscaping work categories; planting work. The work breakdown structure was derived from interviews with experts based on the milestones and detailed statements of existing school facilities. The analysis of precedence relations by school facilities work activity utilized PDM(Precedence Diagramming Method)which does not need a dummy and the relations were applied using FS(Finish to Start), FF(Finish to Finish), SS(Start to Start), SF(Start to Finish). The analysis of this study shows that if one work activity is delayed, the entire construction duration may be delayed because the majority of the works are FS relations. Therefore, it is necessary to use the Lag at the appropriate time to estimate the standard construction duration of the school facility construction. Lag is a term used only in the PDM method and it is used to define the relationship between the predecessor and the successor in creating the network milestone. And it means the delay time applied to the two work activities. The results of this study can reasonably estimate the standard construction duration of school facilities and it will contribute to the quality of the school facilities construction.

중대재해 사례에 기반한 건설업의 작업 및 위험분류체계 통합 프레임워크 개발 (Development of Framework for Integrated Work-Risk Breakdown Structurebased on Fatal Incident Cases in Construction Industry)

  • 정재민;정재욱
    • 한국건설관리학회논문집
    • /
    • 제21권3호
    • /
    • pp.11-19
    • /
    • 2020
  • 건설업에서의 재해는 수십 년 동안 다른 산업보다 많이 발생하였기 때문에, 건설업에서의 재해는 반드시 줄여야 한다. 이러한 문제를 해결하기 위해서 작업분류체계(WBS) 및 위험분류체계(RBS)를 제시하였다. WBS와 RBS는 계층적 구조로 작업 및 위험 단위를 쉽고, 빠르게 찾을 수 있다. 그래서 본 연구에서는 건설업에서의 재해를 예방하기 위해 통합 WBS-RBS 프레임워크를 개발하고자 한다. 연구의 순서 다음과 같은 3단계로 진행되었다. ① 데이터 수집 ② 데이터 분류 ③ 통합 WBS-RBS 프레임워크 개발 순으로 진행되었다. 연구의 결과 가장 사고가 많이 발생한 건물용도, 건설공종 및 재해요인을 제시할 수 있었다. 연구 결과를 통해 의사결정자는 건물용도, 건설공종, 및 재해요인의 위험 수준을 고려할 수 있다.

A Study on the Introduction of the Work Breakdown Structure for Infrastructure Asset Management

  • Jeong, Seongyun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.691-692
    • /
    • 2015
  • Several scholars in South Korea have predicted that maintenance costs of social infrastructure will sharply increase from the mid-2020s, and cause budgetary deficits among facilities management agencies. Interest in infrastructure asset management (IAM) is rising as a solution to such problem. In this study, an information system for asset valuation that reflects the salvage value and deferred cost of social infrastructure based on WBS (work breakdown structure) was developed in consideration of IAM. To reuse the construction cost information such as the acquisition cost, the interconnection between CBS (cost breakdown structure) and WBS was considered. Furthermore, asset valuation information was developed with XML schema to facilitate the exchange and reuse of the information among project participants.

  • PDF

작업분류체계를 이용한 철도공사 안전관리 매뉴얼 개발 (Development of safety management manual using Work Breakdown Structure)

  • 홍선호;왕종배;조연옥;홍용기;박옥정
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.90-96
    • /
    • 2005
  • The existing safety-management manual is confined to list data based on regulations, and only provide ways to prevent accidents/incidents for particular work which accidents occur frequently. As it is difficult to understand the complete process involved the work, we can not expect the manual to function as a guide to prevent unfortunate events. When establishing WBS(work breakdown structure) of railway line engineering, consideration of the characteristics of train operation will enable many benefits. Therefore in this research it is conducted to materialize it in the manual. Main contents in this research are to review the way that change complete work performance process and person in charge of different tasks into WBS(work breakdown structure), and trough the newly developed WBS , the ways to improve roles and functions of the manual which Korean Railroad made are recommended.

  • PDF

건설가설공사의 표준기술분류체계 구축 (Development of Technical Breakdown Structure Standard in Temporary Works)

  • 박준모;김옥규;박길범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.162-163
    • /
    • 2013
  • A temporary work are lifting equipment that tower crane or lift, and temporary architectures that office building and storage in construction site. And it is main construction work that built and used temporarily like to a scaffolding, a walk plate, and a formwork. This study is to adjust breakdown structure of temporary work to introduce technical tendency. With a site manager, it is collected a detailed statement and compared. As a result to break down a tendency that temporary equipment, additional function, and direct work of temporary technique, first, existing detail technical indexes that group I, group J, group K, and group L are classified. Second, due to set up and manage to main agents in case of existing detail technical indexes that B1, B2, it is not wrong to classify. But, it is somewhat different, and therefore adjust it to same level. Finally, as a technical tendency that temporary equipment, additional function, and direct work of temporary technique, it is adjusted the others.

  • PDF

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.