An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method (실적공사비적산제도 도입에 따른 도급금액 변동 분석)

  • Park Chang-Bae;Kim Dong-Young;Kim Ju-Hyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.510-514
    • /
    • 2004
  • This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.

  • PDF

Income Statement Analysis and Developing the Guidelines of Meal-pricing and Facilities Investment Cost in Contract-Managed High School Foodservice in Seoul (서울시내 고등학교 위탁급식의 재무성과 분석을 통한 급식비 및 투자비의 적정 수준 산정)

  • 양일선;현성원;김현아;신서영;조미나;박수연;차진아;이보숙
    • Journal of Nutrition and Health
    • /
    • v.36 no.5
    • /
    • pp.528-535
    • /
    • 2003
  • The purposes of this study were: 1) to investigate the operational and financial characteristics of contract-managed high school food services in Seoul, 2) to analyze the financial performance of high school food services 3) to develop guidelines for meal pricing and facilities investment costs. From Oct to Nov 2001, questionnaires were mailed to 249 high schools that were managed by contract food service companies. A 40.2% response rate was recorded. The results of this study were as follows: 1. Student enrollment in high schools run by contract-managed food services was 1,518, with a 68.5% participation rate in the school lunch program. The average meal price was 2,141 won. 2. Based on the income statement analysis, average total sales were 410,440,504 won and average net profit was 16,098,558 won. 3. The optimum food cost per meal was 1,200-1,300 won per meal, calculating using the methods of conversion factor, RDA (Recommended Daily Allowance), and nutrient exchange unit. 4. Guidelines for meal pricing were developed using the modified actual pricing method based on facilities investment cost, number of meals and food cost. The ratio of labor cost, general management expenses and ordinary profit were adopted from the schools with liability. The food cost, depreciation and interest cost were calculated based on unit meal. 5. The guideline for facilities investment was developed based on the number of meals, meal price and food cost. The guideline included the maximum facilities investment cost paid by the contract food service management company. (Korean J Nutrition 36(5): 528∼535, 2003)

Comparison of Cost Performance for Delivery Methods on Public Construction Projects (공공 건설공사 발주방식에 따른 비용성과 비교연구)

  • Lee, Yoo Sub;Kang, Tai Kyung;Shin, Eun Young;Park, Wonyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2575-2582
    • /
    • 2013
  • In the delivery systems for public construction works, design-build methods such as turn-key and alternative have contributed to improving the quality of structures and developing the construction technology. However, it is pointed out that construction based on a design-build method is likely to waste a budget due to its higher contract price than construction based on a design-bid-build method. Other issues such as contract monopoly, bid rigging and deliberation irregularity in design-build. Since there are not much works have been accomplished to comparatively analyze the actual performance and effect based on delivery methods, discussing and judging the performance and effect of each deliver method with limited information could lead to an error. Thus, this study by extensively investigates the actual project cost data, ranging from contract price to the construction cost of the public construction works and comparatively analyzed the characteristics of each delivery method about cost structure and fluctuation trend. This work is expected to assist stake-holders in properly understanding delivery systems for public construction works and promoting their efficient management.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

A Comparative Analysis on the Methods of Quantifying Damages - Focused on the CISG - (손해배상액(損害賠償額) 산정방식(算定方式)에 관한 비교연구(比較硏究) - CISG를 중심으로 -)

  • Bae, Jun-Il
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.16
    • /
    • pp.59-81
    • /
    • 2001
  • There are two methods of quantifying the damages when the contract is avoided. One is 'concret' assessment, the other is 'abstract' assessment. The former looks to the actual cost incurred by the aggrieved party in concluding a contract for the substitute transaction, while the latter is based on the market price. The concrete method of assessment forms the starting point in the Civil Law systems. In the Common Law systems, it is likewise available. The aggrieved party is entitled to recover the difference between the cost of cover or (as the case may be) the proceeds of resale and the contract price. Both systems also recognize the abstract method of assessment. If the aggrieved party does not resell or cover, damages are equal to the difference between the price fixed by the contract and the market price. The CISG and the UNIDROIT Principles recognize expressly both concrete and abstract methods. Under the relevant articles, the aggrieved party can recover the damages assessed by one of the methods as well as any further damages such as loss of profit, incidental and consequential damages.

  • PDF

A Study on Estimating Method for Actual Unit Cost Based on Bid Prices in Public Construction Projects (시설공사 입찰단가를 활용한 실적단가의 산정 방안에 관한 연구)

  • Kang, Sang-Hyeok;Park, Won-Young;Song, Soon-Ho;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.159-166
    • /
    • 2006
  • It was found that Korean Standard of Estimate which has been used as the only basis of cost estimate of public construction projects had some side effects such as jerry-build construction and over-estimation because it failed to reflect the current price and the state-of-the-art construction methods in a changing construction environment. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004. This paper presents analytic criteria and a process model for deducing more current and reasonable historical construction cost for contract items from not only previous contract prices but also all of the other bid prices that were not contracted. The procedure of estimating actual unit cost proposed in this paper focuses on the removal of abnormal values including strategically too low or high prices and the time correction. In addition, basic research is conducted for the correction of actual unit cost through the analysis of fluctuation of bid price depending on bidding types and rates of successful bid. It is anticipated that the effective use of the proposed process model for estimating actual unit cost would make the cost estimation more current and reasonable.

DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT

  • Jin-Lee Kim ;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.935-940
    • /
    • 2005
  • This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.

  • PDF

Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project (장기계속계약공사의 공기연장 추가간접비 산정 개선방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.30-37
    • /
    • 2017
  • In Korea, additional indirect costs generated from the time period extension of public construction projects have been studied. Practical claims against such costs are increasing. There are no clear criteria for calculating the delay cost caused by the extension, and thus calculation methods differ across entities. Logical valid calculation methods have also not been researched. Further, there are no Korean studies on the additional indirect cost caused by a suspension in a public construction project on a long-term continuing contract. The purpose of this research is to propose a method of calculating the indirect cost incurred by construction time extension that reflects the characteristics of Korean public construction projects. The cost patterns generated during construction periods were analyzed, and then the current criteria of calculating the indirect costs caused by the extension were examined. Following this, actual conditions and practices in the field were surveyed and the current calculation method was applied to a model case to compare the actual cost and that determined from the current calculation method. Issues with the current method were identified by this comparison. Based on this, this research proposes a method of calculating the total actual cost caused by a suspension in a public construction project that is appropriate for calculating the additional indirect cost generated by a suspension in a public construction project on a long-term continuing contract.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

A Study on the Time Series Analysis of the Actual Unit Cost based on the Bid Prices (시계열을 이용한 실적단가 예측방안에 관한 연구)

  • Park, Won-Young;Seo, Jong-Won;Kang, Sang-Hyeok;Choi, Bong-Joon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.50-57
    • /
    • 2009
  • The Korea Standard of Estimate which has been used as the only basis of Cost estimate of public construction projects is failed to reflect the fluctuation of current construction cost. Therefore, the government decided to gradually introduce historical construction cost into cost estimate of public construction projects from 2004 and to reduce the use of Korean Standard of Estimate. This paper presents a series of process and the methodology for computing Actual Cost and analyzing the fluctuation patterns based on not only previous contract prices which made a successful bid but also all of the other bid prices. Also, this paper mainly handles a device for extracting strategic bid price such as low price bid for assuring reliable data and for predicting the construction cost which is built by Wavelet Analysis of Time series Analysis data and Neural Network. It is anticipated that the effective use of the proposed process for estimating actual unit cost would make the cost estimation more current and reasonable.