• Title/Summary/Keyword: alternative priorities

Search Result 45, Processing Time 0.023 seconds

Analysis of the Priority Decision for Establishment Criteria of Environmental Sculptures in Urban Areas (대도시 옥의 환경조형물의 설치기준에 대한 우선순위 분석)

  • Lee, Sang-Seol;lee, Jeong
    • Journal of Environmental Science International
    • /
    • v.9 no.6
    • /
    • pp.489-494
    • /
    • 2000
  • This research focused on the priotity decision for establishment sriteria on the effects which environmental sculptures in urban area. The analysis performed in this study used the AHP(Analytic Hierarchy Process) that is recognized as a useful decision-making tool to select and evaluate alternatives through pairwise comparison in the context of hierarchical decision structure. The results obtained from the analysis drawn by collecting the professional opinions of 5 experts for environmental sculptures are as follows: 1. The orders of establish criteria priorities on environmental sculptures were harmony of environment> symbol> public> function. The harmony of environment was the most important priority because it showed the highest weight of criteria. 2. The alternative priorities of environmental sculptures were the meaning of work>setting place> social contribution> physical quality .The meaning of work showed the highest change in the weight of alternative. 3.The sensitivity analysis of environmental sculptures demonstrated that the rate of change in the alternative priorities of the public was stabilized although the criteria importance varied, while the harmony of environment, the symbol intimated and function of priorities has their rates of weight changed if the criteria priorities were high.

  • PDF

Development of Alternative Evaluation Index Using Multicriteria Decision Making Techniques (다기준 의사결정기법을 이용한 대안평가지수 개발)

  • Chung, Eun-Sung;Lee, Kil-Seong;Park, Kyung-Shin
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.1
    • /
    • pp.87-100
    • /
    • 2008
  • The alternative evaluation index (AEI) is developed and applied to determine the priorities of some options for integrated watershed management. Based on the results of continuous simulation model, AEIs of some feasible alternatives are calculated using multicriteria decision making techniques and sustainability evaluation model, DPSIR (Drivers-Pressure-State-Impact-Response).

Analytical strategies for floating solar PV policy development in South Korea

  • Lee, Youhyun;Kim, Kyoungmin
    • Membrane and Water Treatment
    • /
    • v.13 no.1
    • /
    • pp.7-14
    • /
    • 2022
  • Using the SWOT-AHP method, this study identifies the priorities in the development of floating solar photovoltaics (PV) and suggests possible strategies. Our study analyzed the priorities in planning future solar PV strategies based on the opinions of 27 experts. Our results indicate that the government should expand support while emphasizing the benefit of floating solar PV in that it causes less environmental damage compared to onshore solar PV. In addition, the government should properly deal with the public-private conflict regarding the installation of floating solar PV. Floating solar PV itself has not reached a mature technological and institutional stage, but could be an option or alternative for saturated onshore solar PV facilities in Korea.

A Study on the ANP Application for the Construction of Integrated CEM Model (CEM통합모델 구축을 위한 ANP활용에 관한 연구)

  • Jin, Han-Xin;Lee, Chang-Ho
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.11a
    • /
    • pp.171-184
    • /
    • 2005
  • Today, the usage of DB already becomes an important issue for many companies' survival, especially, for the companies who have adopted CRM(Customer Relationship Management). CEM(Customer Experience Management), as a practical alternative, can settle it. In this paper, we use QFD(Quality Function Deployment) and GA(Genetic Algorithm)-based Group ANP(Analytic Network Process) to construct the Integrated CEM Model to help company decide the priorities of investment in customer experiences.

  • PDF

Classification of the Analytic Hierarchy Process Approaches by Application Circumstances

  • Yoon, Min-Suk;Kinoshita, Eizo
    • Management Science and Financial Engineering
    • /
    • v.16 no.1
    • /
    • pp.17-46
    • /
    • 2010
  • This paper studies six different AHP (Analytic Hierarchy Process) approaches and suggests that the features of the approaches are classified by application circumstances in order to contribute to the applicability and quality usage of the AHP. Our study investigates the hierarchical principles and characteristics of the AHP, and historical debates on the AHP evaluation in which the six approaches have been involved. One of six approaches is an ANP (Analytic Network Process) application that is directly connected to AHP usage. The application differences among the six approaches are validated with a plain example. Then, the four circumstances of AHP applications are classified by two dimensions: the first dimension is whether or not the importance (weights) of criteria is independent of restrictively setting alternatives, and the second dimension is whether or not preference (priorities) of alternatives is independent of adding alternative(s) to or removing alternative(s) from the considering set of alternatives. Then featuring way of weighting criteria is classified. We suggest the distinguishing manners and describe the implications of the AHP application. Finally, we discuss rank reversal and multiplicative AHP.

Effective Coordination Method of Multi-Agent Based on Fuzzy Decision Making (퍼지 의사결정에 기반한 멀티에이전트의 효율적인 조정방안)

  • Ryu, Kyung-Hyun;Chung, Hwan-Mook
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.17 no.1
    • /
    • pp.66-71
    • /
    • 2007
  • To adapt environment changing high speed and improve rapidly response ability for variation of environment and reduce delay time of decision making inlet agents, the derivation of user's preference and alternative are required. In this paper, we propose an efficient coordination method of multi-agents based on fuzzy decision making with the solution proposed by agents in the view of Pareto optimality. Our method generates the optimal alternative by using weighted value. We compute importance of attributes of winner agent, then can obtain the priorities lot attributes. The result of our method is analyzed that of Yager's method.

A Priority Analysis of the Infrastructure for the Logistics Industry in Gwangyang Port (광양항 물류산업 인프라 우선순위 분석)

  • Yun, Dong-Ha;Choi, Yong-Seok
    • Journal of Navigation and Port Research
    • /
    • v.36 no.1
    • /
    • pp.43-49
    • /
    • 2012
  • Gwangyang port has aimed to establish and expand infrastructure since 2004 as a way of logistics industry development plan for activation of port and increase in traffic. However, it faces many changes due to reduced development of Gwangyang port, slowdown of traffic, and decrease in terminal operators. The need for review of plan and direction regarding infra is on the rise at this point for the purpose of ensuring the stable growth foothold of Gwangyang port and attaining independence of Port. This report focuses on the software infrastructure improvement alternative rather than hardware infrastructure. To analyze the priority of this alternative, AHP technique was applied as a research methodology. In this study, as a measure for decision-making, profitability, ease, urgency, and prospects have been selected, and alternatively, buildup of global networking, training of logistics professionals, operation of environment-friendly & low cost port, and development of specialized logistics companies have been selected. Survey has been conducted toward shipping companies which use Gwangyang port, port operators, hinterland logistics companies and consignor' logistics professionals. As a result of survey, the priorities of measuring range were shipping companies, port operators, consignor, and hinterland logistics companies. Meanwhile, the priorities of measuring elements were profitability, prospects, urgency and then ease. The priorities of alternatives were found to be a buildup of global networking, operation of environment-friendly & low cost port, development of specialized logistics companies and training of logistics professionals.

Priority Decision of Small Hydropower Development using Spatial Multi-Criteria Decision Making (공간 다기준의사결정을 활용한 소수력 개발의 우선순위 결정)

  • Kim, Gil-Ho;Yi, Choong-Sung;Yeo, Gyu-Dong;Shim, Myung-Pil
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1029-1038
    • /
    • 2009
  • Recently, it is expected that small hydropower (SHP) could potentially provide sufficient amounts of alternative energy in Korea where there is an abundance of potential sites and where social efforts are being made to reduce the emissions of green house gases. In the past, the resources survey for SHP development has been carried out using onsite surveys and paper maps, which incurred a great deal of time and cost. Furthermore, the tools for decision making such as determining development priorities or evaluating feasibility have been considered only economic aspect and focused on the performance characteristics of power generation. However, as the concept of sustainable development has been being advanced in recent years, especially focused on human-social, environmental and ecological in addition to economical sector; the consideration of these multiple criteria has become essential for sustainable SHP development. This study aims to propose the spatial multi-criteria decision making (MCDM) methodology for determining priorities among a number of locations on the planning stage of SHP development using AHP and GIS. The proposed methodology is applied for determining development priorities among the SHP locations in Cho River basin and this study presents the detailed spatial information data and the results of development priorities. As a fundamental work, this study will be beneficial to the future activation of SHP development and will help the decision making in evaluating the feasibility of SHP development.

A Study on Introduction of IoT Infrastructure based on BSC and AHP: Focusing on Electronic Shelf Label (BSC와 AHP를 활용한 IoT 인프라 도입 의사결정에 관한 연구: 전자가격라벨(ESL)을 중심으로)

  • Yang, Jae Yong;Lee, Sang Ryul
    • The Journal of Society for e-Business Studies
    • /
    • v.22 no.3
    • /
    • pp.57-74
    • /
    • 2017
  • The Electronic Shelf Label (ESL) is an alternative to the paper price label attached to merchandise shelves and is attracting attention as a retail IoT infrastructure that will lead the innovation of offline retail outlets. In general, when introducing a substitute product, the company tends to consider the financial factors such as the efficiency of the investment cost compared to the existing product or the reduction of the operating cost. However, considering only financial factors in the decision-making process, it may not properly reflect the various values associated with corporate strategy and the requirements of stakeholders. In this study, 8 evaluation items (Investment Cost, Operating Cost, Quality Level, Customer Management, Job Efficiency, Maintenance, Functional Expandability, and Store Image) based on BSC's 4 perspectives (Financial, Customer, Internal Business Process, Learning & Growth), and using AHP (Analytic Hierarchy Process) to measure the priorities of evaluation items for domestic small supermarket employees. As a result of the research, priority was given in order of Customer, Learning & Growth, Internal Business Process, and Financial aspects among the evaluation items for adopting the price label, and the electronic price label was supported with higher importance than the paper price label. In contrast to the priorities of the financial aspects of most prior studies, the items of Learning & growth and customer perspectives have relatively high priorities. In particular, respondents classified by job group, The priorities of the 8 evaluation items were different among the groups. These results are expected to provide implications for both companies (retail outlets) and ESL providers (manufacturers and service providers) who are considering the introduction of ESL.

Study of flood prevention alternative priorities using MCDM (Multi-Criteria Decision Making) (MCDM을 이용한 홍수방어대안 우선순위 정립에 관한 연구)

  • Lim, Donghwa;Jeong, Soonchan;Lee, Eunkyung;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.3
    • /
    • pp.169-179
    • /
    • 2017
  • Recently, due to global warming and climate change in Korea, local heavy storm occurs frequently. In this study, the risky areas for flooding in urban areas are analyzed for flood inundation based on two-dimensional urban flood runoff model (XP-SWMM) focusing on coastal high flood-risk urban areas. In addition, the MCDM (Multi-Criteria Decision Making) technique is utilized in order to establish the flood defense structural measures. The alternative flood reduction method are compared and the optimum flood defense measures are selected. A simulation model was used with three structural flood prevention measures (drainage pipe construction, water detention, flood pumping station). In order to decrease the flooding area, flood assessment criteria are suggested (flooded area, maximum inundation depth, damaged residential area, construction cost). Priorities of alternatives are determined by using compromise programming. As a result, the optimal flood defence alternative suggested for Janghang Zone 1 is flood pumping station and for Janghang Zone 2, 3 are drainage pipe construction.