Establishment of Change Order Database for Reducing Change Order in Construction Phase

  • Shin, Hyun-Kyung;Cha, Yongwon;Han, Sangwon;Hyun, Chang-Taek
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.622-624
    • /
    • 2015
  • As uncertain factors are latent in a construction project by nature, a change order occurs frequently. The occurrence of change orders in construction projects conducted during construction phase is known to cause unexpected negative impacts such as cost overrun, schedule delay, quality problem, and claims in the post-process. Thus, an efficient management method is necessary to prevent and minimize change orders during construction phase when they occur frequently. This paper analyzed the causes of change orders and the impact factors that occur during the construction phase of a construction project and suggested a direction for change order database building.

  • PDF

Deduction and Management of Change Order Management Factors through Dispute Case Analysis - Focusing on Korean Commercial Arbitration Board Arbitration Case - (설계변경 분쟁 사례분석을 통한 설계변경 관리요인 도출 및 관리방안 - 대한상사중재원 중재 사례 분석 중심 -)

  • Yeon, Heejung;Hyun, Chang-Taek;Lee, Sanghoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.365-366
    • /
    • 2023
  • The purpose of this study is to prevent dispute due to change orders in construction projects and to handle change orders smoothly. For this purpose, this study analyzed arbitration cases caused by change order handled by the Korea Commercial Arbitration Board. Based on this, dispute factors were analyzed and change order management factors and management plans were presented. Change order management factors were derived from responsibility, contract, design, process, construction cost, and schedule management, and a detailed management plan according to the relevant factor was presented.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

Design and implementation of quotation management process according to quotation change factors in make-to-order manufacturing environments (수주생산환경에서 견적변경 요인에 따른 견적관리 프로세스의 설계 및 구현)

  • Jeon, Gyu-Hwan;Jang, Gil-Sang;Park, Chang-Kwon
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.879-892
    • /
    • 2021
  • In a make-to-order manufacturing environment, the manufacturer's quotation information is important information used as basic information for bidding, receiving orders, and producing products in response to various customer demands. This quotation information is changed according to various factors such as customer demands, changes in product production environment, changes in drawing information of technical partners, and technological improvement of products. Due to this change, various changes occur in the quotation information that the manufacturer is preparing to reflect the customer's requirements. The change of quotation information according to these various change factors puts a lot of burden on the quotation management work from the standpoint of a make-to-order manufacturing company. In particular, the change of quotation information due to the change factors of quotation is inevitable and frequently occurs due to the requirements of the customer in the customer-oriented make-to-order production environment. In this paper, we propose a quotation change process based on the quotation creation process and propose a consistent and efficient quotation change processing method. To this end, the factors causing the change of quotation were defined, and the types of changes for each factor were defined. And it shows the procedure of applying the quotation change process to the quotation management system through the cases of each cause of the quotation change. In addition, in order to show the usefulness of the quotation change factors, the type of quotation change, the quotation change process, and the quotation system management, the proposed quotation change process and function was applied in the integrated quotation management system for the ship engine division of a typical make-to-order manufacturing company 'H'. As a result, it was confirmed that the proposed quotation change process and management system according to the quotation change factors were efficiently performed.

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF

Suggestion of Model Change Work Improvement by REBA and Therblig

  • Lee, Sung-Koon;Park, Peom
    • Journal of the Ergonomics Society of Korea
    • /
    • v.30 no.6
    • /
    • pp.757-764
    • /
    • 2011
  • Objective: The aim of this study was to provide a method to improve the compliance and reduce the time by reducing the workload during the model change work. Background: The enterprises are constructing the small quantity batch production system by increasing the number of model change and reducing model-changing. However, the compliance is low because the work is strenuous and high skills are needed, so the system management is facing with many difficulties. Method: After classifying the model change work according to the purposes(preparation, change and adjustment) with the target of mascara filling machine, element tasks time were measured and the motion analysis(therblig symbol) and REBA analysis were performed. The study incorporated 3 independent variables as the number of motion, REBA score and the element time. The dependent variable is the type of element work as preparation, change and adjustment. The statistical test was performed by one-way ANOVA(${\alpha}$ < 0.05). Results: For the preparation, the number of motions appeared in the order of Use(U), Transport Loaded(TL), and Position(P). The order appeared in change is Use(U), Release Load(RL), and Grasp (G). The adjustment appeared in the order of Position(P) and Use(U). The results of average motion time as the element work times divided by the number of motion appeared in the order of adjustment(1.85sec/motion), preparation(1.11sec/motion), and change(0.62sec/motion). The results of REBA showed that the average risk level of change and adjustment were medium, but 53.1% of change and 42.9% of adjustment were evaluated as high. Conclusion: Reducing the avoidance and improving the compliance of work could be expected if the job autonomy were improved by improving the working postures with high risk level. Application: It is expected to solve the problem of reducing the time of model change work in the small quantity batch production system. The future work is to carry out the improvement directions found in the results and compare the results after improvement.

A Study on the Variables Influencing Female College Students' Body Shame and Appearance Change Intention: Comparison of Korea, China and Germany (여대생의 신체수치심과 외모변경의도에 영향을 미치는 변인 연구: 한국, 중국과 독일의 비교)

  • Hong, Keum-Hee
    • Fashion & Textile Research Journal
    • /
    • v.13 no.4
    • /
    • pp.523-530
    • /
    • 2011
  • This study aims to make a comparison between variables influencing female college students' body shame and appearance change intention in individualist culture(Germany) and collectivist culture(Korea, China), that which variable among individual's physical character(BMI), psychological character(public self-image), and sociocultural pressure has the biggest influence in each culture. The findings of the research are as follows. 1. The German group of female college students had the highest BMI, and there were no difference between Korean and Chinese group. Public self-consciousness, sociocultural pressure, ideal appearance attitude, body shame, and appearance change intention were highest in Korea and lowest in Germany. 2. The variables that affected body shame were powerful in the order of sociocultural pressure, appearance internalization, BMI, and appearance awareness in the Korean group of female college students. In the Chinese group, the order was sociocultural pressure, appearance internalization, and public self-consciousness. On the contrary, in the German group the order was appearance internalization, appearance awareness, sociocultural pressure, and public self-consciousness. 3. The variables that affected appearance change intention were powerful in the order of sociocultural pressure, body shame, and appearance awareness in the Korean group of female college students. In the Chinese group, the order was sociocultural pressure, body shame, and appearance awareness, and in the German group, the order was appearance internalization, body shame, and BMI.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Development of the Order Picking Algorithm for Warehouse Management System in SCM Environment

  • 조종남;남호기;박상민;오성환
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.11a
    • /
    • pp.129-142
    • /
    • 2003
  • The SCM is that Supply Chain Network is Promptly and Voluntarily Optimized in Unstable Market Change Environment. The Cash flow Efficiency of Hole Supply Chain Network is Improved by Changing the Information and Changing the Foundation of Business Processes. The Role of WMS has been Changing Importantly with the Introduction of SCM. WMS Needed to Change to the Information Center in Order to Change Information in Real Time and the WMS of Information Storing in Order to Support an Idea Decision. This Development was Defined about the Importance of WMS in SCM Environment. The Criterion of Valuation is Normally Measured Time between Taking a Order Receive and Bringing the Items to Customer. The Decreasing Move Time of Order Picker in Warehouse is Directly Influence to the Job Execution. So, this Research is Defined about the Optimized Route of Order Picker and Suggests Algorithm. To do this, Past Algorithm is Studied. It's Easy to Introduce and this Study is Looking for Method about the Noticing of Order Picker. The Algorithm will Improve to be Adapt to Standard Process System.

  • PDF