• Title/Summary/Keyword: construction joint

Search Result 1,104, Processing Time 0.027 seconds

Sheet Jointing Method of the Roof Exposed Hybrid Waterproofing Using the Bump-type Joint Reinforcement (돌기형 접합 보강재를 이용한 옥상 노출 복합방수의 조인트 시공방법에 관한 연구)

  • Kim, Meong-Ji;An, Ki-Won;Kim, Dong-Chun;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.147-148
    • /
    • 2018
  • Seat waterproofing materials applied to the roof of a building concrete structure inevitably produce joints and are applied with opposite dam joints or overlapping joints depending on the waterproof material applied to the top of the sheet. In this case, the joint performance is determined by the material at the top, rather than by the superimposed joint. In order to solve this problem, various reinforcements have been used to apply to the connecting parts of the opposite dam, but the problem of attachment between different materials or the lack of reinforcement of the joint tape has not been solved. Therefore, for the purpose of securing tensile performance to the joints, this study is used as a reinforcement for the joints of PP materials with high tensile performance and as a reinforcement for nylon materials.

  • PDF

Performance Test of Corner Rigid Joint for Modular Structure using Channel and Coupler (채널과 커플러를 사용한 모듈식 구조체 우각부 연결구조의 성능검증 실험)

  • Lee, Jun-Kyoung;Lee, Jong-Soon;Lee, Sung-Hyung;Kim, Hee-Sung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.3
    • /
    • pp.2255-2262
    • /
    • 2015
  • Recent study about near-surface is proposed to overcome non-economic of underground railway and to reduce people's complaints of ground elevated railway. In this report, precast modular structure system replacing temporary facilities is applied to ensure the construction ability and economic feasibility. To verify the performance of connection joint between permanent structural wall and upper slab, loading test is carried out. As a result of the test, wall replacing temporary structure to slab connection is possible to transfer bending moment. By 30% increase of bending resistant performance for connection joint using coupler, coupler connection joint is more advantageous to resist bending moment compared to channel connection.

A Study on Void Examination in Top-Down Column Joint (역타설기둥 타설이음 부분의 공극성상에 관한 연구)

  • 이영도;임형일;김성식;정병훈;정상진;진영헌
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.34-39
    • /
    • 2001
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down, through V-metering for top down column and concrete experiment.

  • PDF

An Experimental Study on the Joints in Ultra High Performance Precast Concrete Segmental Bridges (초고성능 프리캐스트 콘크리트 세그멘탈 교량 접합부에 대한 실험 연구)

  • Lee, Chang-Hong;Chin, Won-Jong;Choi, Eun-Suk;Kim, Young-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.23 no.2
    • /
    • pp.235-244
    • /
    • 2011
  • Failures of segmental bridges have been attributed to the inadequate joint connection techniques, which led to corrosion of the post-tensioned tendons connecting the segmental joints. The principal objective of this study is to evaluate the performances of the in-situ cast joint and epoxy applied shear key joints as a function of shear and ultimate strengths. Furthermore, shear behavior and strength of shear key joints in ultra high performance precasted concrete segmental bridges are experimentally evaluated to understand its shear failure behavior. The test parameters of shear key shape and type, load-displacement relations, cracking behavior, concrete strength, and fracture modes are considered in the study. Also, several parameters which influence the mechanical behavior of the shear key joint are analyzed. Based on the study results, the optimal shear key shape and joint type are proposed for the joint design and analysis guidelines.

Evaluation of Chloride Diffusion Coefficients in Cold Joint Concrete Considering Tensile and Compressive Regions (인장 및 압축영역에서 콜드조인트 콘크리트의 염화물 확산계수 평가)

  • Mun, Jin-Man;Kwon, Seung-Jun
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.4
    • /
    • pp.481-488
    • /
    • 2016
  • Concrete member has been subjected to dead and live loads in use, and the induced stress can affect not only structural but also durability behavior. In mass concrete construction, construction joint are required, however cold joint usually occur due to poor surface treatment and delayed concrete placing. The concrete with joint is vulnerable to both shear stress and chloride ingress. This paper presents a quantitative evaluation of cold joint and loading conditions on chloride diffusion behavior. With increasing tensile stress from 30% to 60%, chloride diffusion coefficient gradually increases, which shows no significant difference from result in the sound concrete. However chloride diffusion coefficient under 30% level of compressive stress significantly increases by 1.70 times compared with normal condition. Special attention should be paid for the enlarged diffusion behavior cold joint concrete under compressive stress.

A Study on the Expansion Joint of Concrete Lining and Duct in a Tunnel (터널 콘크리트 라이닝 및 공동구 신축이음 설치방안에 관한 연구)

  • Son, Moorak;Park, Yangheum;Park, Yunjae;Kim, Jaegyoun;Yoon, Jongcheol
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.3
    • /
    • pp.39-50
    • /
    • 2015
  • The installation of the expansion joints in a tunnel concrete lining and duct would minimize the cracking at the location of structural shape and stiffness change, differential settlement, big temperature change, and so on. However, it is difficult to determine the required spacing of the expansion joint in a tunnel concrete lining and duct quantitatively because the spacing is influenced by temperature change, structure construction condition, ground-structure interaction, and etc. Nevertheless, a highway specification (Korea Expressway Corporation, 2012) or a road design manual (Ministry of Land, Transport and Maritime Affairs, 2010) specifies that the expansion joint spacing in a tunnel concrete lining should be installed uniformly smaller than 25 m from the tunnel portals to 50 m inside of a tunnel and elsewhre 20-60 m in a tunnel (because there is no specifcation for a duct it is assumed that a duct follows the specfication of lining). This specification results in several construction and economic problems in relation with a tunnel construction. Accordingly, in order to minimize the problems, this study analyzed both domestic and foreign design standards and specifications. In addition, field test, theoretical and numerical analyses were carried out in relation to the expansion joint in a tunnel lining and duct. The purpose of this study is to reestabilish a criterion for installing the expansion joint in a tunnel concrete lining and duct.

A Strategy of Construction through Rationally Adapting JV(Joint Venture) in Large Public Constructions (대형공공공사에 J/V(Joint Venture)시스템의 합리적 도입을 통한 건설사업 효율화 전략)

  • 이태식;김용천;박동찬;선우강;김열규
    • Proceedings of the KSR Conference
    • /
    • 2001.05a
    • /
    • pp.24-29
    • /
    • 2001
  • Despite of the introduction some sorts of the contract and the bid method like CM(Construction management) that will be efficient to manage the construction project. Korean agencies limit to control project management to do large public constructions. In the case of Taiwan, THSRC is apply J/V system in the public construction project, they are accomplishing that expend optimal the cost and save the construction time. To success J/V it has two factors, one is risk management and another is sharing information of construction project. Therefore, we will study to introduce J/V system to our construction project.

  • PDF

Analytical Study on Ultimate Design Method of Tube Flange Joints with the Rib Plate Using the High Strength Bolt (리브 붙은 고력볼트 강관플랜지 이음의 극한 설계방법에 관한 해석적 연구)

  • Kim, Seong Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.12 no.5 s.48
    • /
    • pp.537-547
    • /
    • 2000
  • The tube flange joint often used in the field is a kind of tensional joint method using the high strength bolts. Transferring stress is conducted by high axial pressure between each part of material that is produced by twisting the high strength bolts. And historical characteristics of the flange joint have not been studied sufficiently and it is difficult to say that the design method is established definitely. Therefore new method using ultimate strength is need to be suggested to solve there problems in using flange joint. The purposes in this study are to gain the data base for establishing design method of joint in the form like figure1 and survey whether the joint of tube flange with non-equal diameter can be designed or not in the form like rib or ring.

  • PDF

A Study on the Joint and Splice of wooden Structure at Geunjeongjeon Hall of Gyeongbok Palace in the late Joseon Dynasty (조선후기 경복궁 근정전 주요 구조재의 맞춤과 이음에 관한 연구)

  • Jung, Yun-Sang
    • Journal of architectural history
    • /
    • v.16 no.1
    • /
    • pp.83-99
    • /
    • 2007
  • This study examines the joint and splice of wooden structure at Geunjeongjeon Hall of Gyengbok Palace, which was constructed in the late Joseon Dynasty. The scope of the study is on the part of columns, the bracket sets, and the frame structure. This research also deals with the relationship between vortical load and horizontal load. Firstly, the examination of the joint and splice methods between the pillar and penetrating ties is on the joint and splice methods of the outer and corner. Through the investigation, it is verified that the joint methods between pillar and penetrating tie on the outer and corner pillars is the method of Sagal joints(cross joints, 사개맞춤). Joints used between pillar and penetrating tie are dovetailed tenon joints, between columns and Anchogong(안초공), between columns and Choikgong(초익공) are tenon joint(장부맞춤). Secondly, the examination of the joint and splice methods of the bracket set is on that of Salmi and Cheomcha(첨차), and Salmi and Janghyeo(장혀). Joints used between Salmi and Cheomcha, Salmi and Janghyeo are halved joint, and between each Janghyeo are stepped dovetailed splice. It is Cheomcha that is used the Jujang-Cheomcha(주장첨차) on center line. Therefore it is connected with each bracket set, which gets to is the strong system, easy and convenient on the construction of that. Thirdly, the frame structure of wooden architecture in royal palace is consist of purlins and beams, Janghyeo(장혀, timber under purlin), tall columns, king posts, etc. Through the investigation, it is verified that the joint and splice methods between purlins and beams are used with the methods of Sungeoteok joint(숭어턱맞춤). It is verified that the joint and splice methods between beams and high columns are used with methods of mortise and tenon joint(장부맞춤), is highly related with tensile force. To reduce the separation of parts, sangi(산지) and tishoi(띠쇠) are used as a counterproposal, which were generally used for architecture in royal Palaces in the late Joseon Dynasty and continued to be used until these days common wooden architecture.

  • PDF

An Analysis of Constructability and Economic Efficiency for Pipe Work using Insert & Coupling Joint Method (일체형 삽입식 신속 연결구를 이용한 건축 배관 연결 공법의 시공성 및 경제성 분석)

  • Kim Tae-Hoon;Kim Dae-Won;Suk Sung-Joon;Park Chul;Lee Jun-Seo;Kang Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.189-194
    • /
    • 2006
  • The internal construction industry is not situation of cost reduction based on low wages anymore by the increase in wages as insufficient supply of stilled workers. Recently remodeling constructions that only need to change facilities as to stay the existing structures are on the increase. Now the method of piping facility used to remodeling construction needs stilled workers, large work space and a variety of tools. These complex construction process have a difficulty of high-quality and economical construction. In addition it have the hish incidence of warranty and a problem of cost increase as a commitment of manpower by warranty repair. In order to solve these problems it is necessary for appropriate new technology to the internal construction environment. Piping fittings by Insert & Coupling Joint is a method that unskilled workers can be easily constructed though one touch set up and it is convenient to maintain for repair work of piping facility. This technology show the effect of 3 percentages labor cost reduction as compared with piping fittings by press joint on apartment 500 households. Therefore this technology is supposed that attain a cost reduction though the technical and economical construction and a client satisfaction though the high-quality construction on the present construction market.

  • PDF