• 제목/요약/키워드: cost input structure

Search Result 176, Processing Time 0.033 seconds

A Basic Study for Developing the Construction Cost Index by Directly Surveying the Cost Input Structure in Korea - Focused on Highway Construction Projects - (원가투입구조의 직접 조사에 의한 국내 건설공사비지수 개발을 위한 기초연구 - 도로시설물 중심으로 -)

  • Kim, Woo-Young;Yi, June-Seong;Lee, Young-Hwan;Lee, Bok-Nam;Kim, Yoon-Joo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.53-61
    • /
    • 2006
  • Korean Government started to publish Korean CCI(Construction Cost Index) again at February 2004 since CAK(Construction Association of Korea) stopped publishing it 1994. CCI is developed using the verified statistical data, that is, input-output table and producer price index by Korean Bank and labor unit cost by CAK. Though the method is available as it uses the verified statistical data, there is a limitation to reflect the characteristics of construction. For overcoming this limitation, this study suggests CCI development method investigating the input structure of labor and material cost for each type of construction project and applying the cost variations of the items.

A Study on the Factor Demand Structure of Sweet Persimmon (단감의 생산요소 수요구조분석)

  • Yoo, Li-Na;Hwang, Su-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.9
    • /
    • pp.5843-5849
    • /
    • 2015
  • This study analyzes the factor demand structure of sweet persimmon as a part of finding out cost cutting measures. Income and cost data from 2001~2013 Agricultural Income Survey are used for placing the translog cost function and estimating price elasticies and cross elasticities of labor, capital and intermediate input. The result shows that own price elasticities of all factors are small in absolute terms. Additionally the result indicates capital and intermediate input cannot be a substitution for labor, which is a top-line cost-share. It means that the demand for labor cconstitutionally can't be reduced in a short time. This implies that cost reduction should be done focusing on intermediate input, particularly on fertilizer and materials which have higher price elasticity of demand.

A Study on Development of Simple System for Assessment of Uninsured Cost (비보험비용 산정을 위한 Simple System 개발에 관한 연구)

  • Lee, Jong-Bin;Lee, Tae-Yeong;Chang, Seong-Rok
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.4
    • /
    • pp.96-101
    • /
    • 2011
  • In previous studies, a system was developed for classifying items of uninsured cost and for generating factors and formulas by item for calculating accident loss costs. However, the loss cost of stopped production was not considered when the system was being developed. In addition, the system which was developed in previous studies had problems such as input error and data collection, owing to numerous input items. Therefore, this study developed a Revised system which considers the loss cost of stopped production, and a Simple system for improving the problems in input errors and data collection. In this study, unquantifiable factors were not considered. Further study that takes these factors into consideration is necessary.

The Impact of Import Oil Price Increase on the Cost Structure of the Korean Logistics Industry (수입원유가격의 상승이 국내 물류산업의 비용구조에 미치는 영향분석)

  • Yoon, Jae-Ho;Park, Myong-Sup
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.41
    • /
    • pp.169-183
    • /
    • 2009
  • This study has been conducted under the background of the high rocketed international oil price in the mid of the 2008 year. Korean logistics industry then suffered from a harsh labor strike which paralyzed temporarily Korean exports and imports activities mainly due to the rising motor fuel prices. The theme of this study started from the highly practical question: what would be the impact of the soaring crude oil price on the cost structure of the Korean logistics industry? For this practical question this study conducted an input-output analysis utilizing the 2003 year benchmark input-output table, published by the Bank of Korea in 2007.

  • PDF

Cost-Effectiveness Evaluation of the Structure with Viscoelastic Dampers (점탄성감쇠기를 설치한 구조물의 비용효율성 평가)

  • 고현무;함대기;조상열
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2001.04a
    • /
    • pp.387-393
    • /
    • 2001
  • Installing vibration control devices in the structure rises as a solution instead of increasing structural strength considering construction cost. Especially, viscoelastic dampers show excellent vibration control performance at low cost and are easy to install in existing structures compared with other control devices. Therefore, cost-effectiveness of structure with viscoelastic dampers needs to be evaluated. Previous cost-effectiveness evaluation method for the seismically isolated structure(Koh et al., 1999;2000)is applied on the building structure with viscoelastic dampers, which combines optimal design and cost-effectiveness evaluation for seismically isolated structures based on minimum life-cycle cost concept. Input ground motion is modeled in the form of spectral density function to take into account acceleration and site coefficients. Damping of the viscoelastic damper is considered by modal strain energy method. Stiffness of shear building and shear area of viscoelastic damper are adopted as design variables for optimization. For the estimation of failure probability, transfer function of the structure with viscoelastic damper for spectral analysis is derived from the equation of motion. Results reveal that cost-effectiveness of the structure with viscoelastic dampers is relatively high in how seismic region and stiff soil condition.

  • PDF

Initial Input Cost Analysis by Different Construction Types of Slab Tracks in Urban Railway (도시철도 콘크리트궤도의 유형별 초기시설 투입비용 분석)

  • Kim, Hyo-San;Ryu, Jae-Kwang;Min, Jun-Ho;Han, Dong-Un;Lee, Dal-Jae
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.400-405
    • /
    • 2011
  • The total length of Korean urban railways reaches 1,200km. Urban railway used to be installed with ballasted tracks by reason of low cost at the time of construction, slab tracks are now being installed due to the reasons of the improvement in safety, lengthening service life and more economical method in terms of maintenance. The length rate of slab tracks has exceeded 70% of the domestic urban railways with the methods ranging from STEDEF, LVT, ALT, Eidan-type, B2S to RHEDA. This study surveyed the share of domestic slab tracks, and compared and evaluated the input cost at the initial stage by the types of slab tracks. Construction processes have been standardized by the existing design documents and calculated the initial input cost for the length of 1km of a hypothetical straight line. Cost breakdown structure was evaluated as materials cost, construction cost, equipment cost, indirect cost, etc. It is expected that this study will be used in selection & evaluation which is considering the economic feasibility of slab tracks.

  • PDF

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

Robust $L_2$Optimization for Uncertain Systems

  • Kim, Kyung-Soo;Park, Youngjin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1995.10a
    • /
    • pp.348-351
    • /
    • 1995
  • This note proposes a robust LQR method for systems with structured real parameter uncertainty based on Riccati equation approach. Emphasis is on the reduction of design conservatism in the sense of quadratic performance by utilizing the uncertainty structure. The class of uncertainty treated includes all the form of additive real parameter uncertainty, which has the multiple rank structure. To handle the structure of uncertainty, the scaling matrix with block diagonal structure is introduced. By changing the scaling matrix, all the possible set of uncertainty structures can be represented. Modified algebraic Riccati equation (MARE) is newly proposed to obtain a robust feedback control law, which makes the quadratic cost finite for an arbitrary scaling matrix. The remaining design freedom, that is, the scaling matrix is used for minimizing the upper bound of the quadratic cost for all possible set of uncertainties within the given bounds. A design example is shown to demonstrate the simplicity and the effectiveness of proposed method.

  • PDF

Simulink Model of 3-Phase Diode Rectifiers (3상 다이오드 정류기의 Simulink 모델)

  • Lee Jin-Woo
    • Proceedings of the KIPE Conference
    • /
    • 2001.07a
    • /
    • pp.514-519
    • /
    • 2001
  • Most of inverters adopt a diode rectifier as an input stage, which has very simple and rugged structure and therefore low cost. In order to properly design the 3-phase diode rectifier with an output smoothing capacitor and input inductors, it is necessary to fully simulate the system due to its nonlinear characteristics. Therefore this paper describes the operating behaviors including the current commutation in detail by using the proposed equivalent circuit, and also proposes the Simulink-based model of the system. The simulation results show the validity of the proposed model in all operating conditions.

  • PDF

A Low COST SOFT-SWITCHED AC-TO-TC CONVERTER

  • 최주엽;목형수;김택용
    • Proceedings of the KIPE Conference
    • /
    • 1997.07a
    • /
    • pp.135-140
    • /
    • 1997
  • A highly efficient single-phase/three-phase compatible ac-to-dc converter is proposed and analyzed, which includes three identical single-phase both soft-switched dc-to-dc converter with boost converter as a pre-regulator for input power factor correction (PFC). The proposed converter structure provides a cost reduction and easy implementation of compatibility between single-phase 220V and three-phase 220V/380V with their inputs in delta or wye connections.

  • PDF