• 제목/요약/키워드: cross passage tunnel

검색결과 26건 처리시간 0.022초

도로터널 방재시스템 개발 - 자연환기를 수행하는 중규모 도로터널의 정량적 위험도평가관한 연구 - (Development of safety system for Road Tunnel - The study of Quantitative risk assessment for middle scale road tunnel with natural ventilation system -)

  • 유지오;신현준;김종원
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.67-70
    • /
    • 2008
  • As a part of the project on road tunnel fire safety system development, Quantitative Risk Assessment program was developed. In this study, We carried out Quantitative Risk Assessment with this program by using a factor of cross passage interval, warning announcement time and congestion ratio etc for 1km tunnel with natural ventilation. In the case of 250m below of cross passage interval, Risk value due to warning announcement time was a slightly changed. but if cross passage interval is more than 250m, expected fatalities in the same HRR(heat release rate) was sharp increased. As a result, Quantitative Risk Assessment program which was developed in this research project is possible to risk assessment with ventilation type, cross passage for evacuation and detection system response property etc. hereafter, this program look forward to use as a tool for road tunnel performance based design.

  • PDF

터널 내부 기류 변화에 따른 피난연락갱 간격 설정에 관한 연구 (A study on an interval of tunnel cross passage considering inclination and internal airflow)

  • 이동호;김하영;유지오
    • 한국터널지하공간학회 논문집
    • /
    • 제12권1호
    • /
    • pp.43-49
    • /
    • 2010
  • 도로터널내의 피난연락갱은 화재시 터널내 통행자의 안전성 확보를 위한 방재시설 중 하나이며 국내의 경우 500 m이상 터널에서는 250 m 간격 이하로 설치하도록 규정하고 있다. 그러나 이러한 일괄적인 피난연락갱 간격 산정은 터널내 풍속이나 구배, 화재강도 및 터널의 내공단면적 등 터널의 특성에 대한 고려가 되지 않기 때문에 과대 및 과소 설비가 될 우려가 발생한다. 본 연구에서는 터널 내 풍속 및 구배의 영향을 고려한 피난연락갱 적정간격 산정 방식을 제시하여 터널 설계시 피난연락갱의 효율적인 적용을 목표로 한다. 결과로 터널내 풍속이 0 m/s와 1.0 m/s의 경우 구배에 의한 영향이 뚜렷한 것으로 분석되었으나 2.0 m/s 이상의 경우 터널내 구배에 의한 연기의 이동은 큰 영향을 미치지 못하는 것으로 나타났다. 터널 내부 기류속도 및 터널 구배에 따른 적정 피난연락갱 간격이 상이하게 나타나 250 m 간격인 기존의 일괄적인 피난연락갱 간격 산정이 아닌 터널 내 풍속이나 구배, 화재강도 및 터널의 내공단면적 등 터널의 특성에 대한 고려값을 적용한 적정 피난연락갱 산정이 필요하다.

Numerical analysis of water flow characteristics after inrushing from the tunnel floor in process of karst tunnel excavation

  • Li, S.C.;Wu, J.;Xu, Z.H.;Li, L.P.;Huang, X.;Xue, Y.G.;Wang, Z.C.
    • Geomechanics and Engineering
    • /
    • 제10권4호
    • /
    • pp.471-526
    • /
    • 2016
  • In order to investigate water flow characteristics after inrushing in process of karst tunnel excavation, numerical simulations for five case studies of water inrush from the tunnel floor are carried out by using the FLUENT software on the background of Qiyueshan high risk karst tunnel. Firstly, the velocity-distance curves and pressure-distance curves are drawn by selecting a series of probing lines in a plane. Then, the variation characteristics of velocity and pressure are analyzed and the respective optimized escape routes are made. Finally, water flow characteristics after inrushing from the tunnel floor are discussed and summarized by comparing case studies under the conditions of different water-inrush positions and excavation situations. The results show that: (1) Tunnel constructors should first move to the tunnel side wall and then escape quickly when water inrush happens. (2) Tunnel constructors must not stay at the intersection area of the cross passage and tunnels when escaping. (3) When water inrush from floor happens in the left tunnel, if tunnel constructors meet the cross passage during escaping, they should pass through it rapidly, turn to the right tunnel and run to the entrance. (4) When water inrush from floor happens in the left tunnel, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment in the vicinity of the right tunnel working face. In addition, some rescuing equipment can be set up at the high location of the cross passage. (5) When water inrush from floor happens in the cross passage, tunnel constructors should move to the tunnel side wall quickly, turn to the tunnel without water inrush and run to the entrance. (6) When water inrush from floor happens in the cross passage, if there is not enough time to escape, tunnel constructors can run to the trolley and other equipment near by the left or the right tunnel working face. The results are of important practical significance and engineering value to ensure the safety of tunnel construction.

피난연결통로터널의 지보패턴 및 보강범위 연구 (Research on the support system and reinforcement range of cross passage tunnel)

  • 정민;한기환;박진원;백경민;문훈기
    • 한국터널지하공간학회 논문집
    • /
    • 제12권3호
    • /
    • pp.201-213
    • /
    • 2010
  • 최근 도로계획 및 건설추세는 터널의 개소수 증가와 장대터널의 건설이 증가하는 추세에 있으며, 이와 더불어 터널내 사고로 인한 재해발생도 증가하는 경향을 보이고 있다. 터널안에서 재해나 사고는 이용객의 안전에 치명적이므로 방재시설에 대한 사회적관심이 증가 하고 있다. 피난연결통로는 병설터널에서 유용한 방재시설이므로 설치개소가 늘고 있으나 지보패턴에 관한 연구는 미미한 실정이다. 본 연구에서는 경험적 방법으로 지보패턴을 선정하고 이론식과 피난연결통로부의 계측결과를 이용한 역해석으로 적정성을 검증하고자 한다. 또한 지반강도비를 이용한 케이스 스터디를 통하여 본선과 피난연락갱의 접속각도에 따른 보강범위도 검토하고자 한다.

Flow characteristics after water inrush from the working face in karst tunneling

  • Wu, J.;Li, S.C.;Xu, Z.H.;Pan, D.D.;He, S.J.
    • Geomechanics and Engineering
    • /
    • 제14권5호
    • /
    • pp.407-419
    • /
    • 2018
  • In order to investigate flow characteristics after water inrush from the working face in process of karst tunnel construction, numerical calculation for two class case studies of water inrush is carried out by using the FLUENT software on the background of Qiyueshan tunnel. For each class water inrush from the tunnel face, five cases under different water-inrush velocity are simulated and researched. Three probing lines are selected respectively in the left tunnel, cross passage, right tunnel and in the height direction of the tunnel centerline. The variation characteristics of velocity and pressure on each probing line under the five water-inrush velocities are analyzed. As for the selected four groups probing lines in the tunnels, the change rules of velocity and pressure on each group probing lines under the same water-inrush velocity are discussed. Finally, the water flow characteristics after inrush from the tunnel face are summarized by comparing the case studies. The results indicate that: (1) The velocity and pressure change greatly at the intersection area of the cross passage and the tunnels. (2) The velocity nearby the tunnel side wall is the minimum, while it is the maximum in the middle position. (3) The pressure value of every cross section in the tunnels is basically fixed. (4) As water-inrush velocity increases, the flow velocity and pressure in the tunnels also increase. The former is approximately proportional to their respective water-inrush velocity, while the latter is not. The research results provide a theoretical basis for making scientific and rational escape routes.

터널 내 화재발생시 구난역 내의 설계된 환기 시스템 성능에 대한 실험적 연구 (Experimental Study on the Designed Ventilation System Performance at Rescue Station in Tunnel Fire)

  • 김동운;이성혁;유홍선;윤성욱
    • 한국철도학회논문집
    • /
    • 제12권1호
    • /
    • pp.9-15
    • /
    • 2009
  • 본 연구는 축소실험을 통하여 터널내 화재발생시 구난역 내 설계된 환기 시스템 성능을 검증 하였다. Froude 수 상사법칙을 적용하여 실제 터널 크기의 1/35로 축소된 모형터널을 사용하였다. 모형터널은 두께가 2mm인 철을 사용하여 총 길이 10m, 높이 0.19m, 폭 0.26m으로 제작되었다. Cross-passage는 사고터널과 구난 터널 사이에 연결되고 Cross-passage 중앙에는 방화문이 설치되어 있다. 실험에는 n-heptane, $4cm{\times}4cm$ 풀화재를 이용하였다. 화원의 발열량은 695.97W이고, 화원 위치는 터널 중앙과 가장 위험한 경우로써 터널 입구지점에 각각 설치하였다. 환기조건은 0.015cms이고 화원과 가장 인접한 곳에서만 배기하도록 하였다. 구난역 배기 성능을 검증하기 위해 온도와 CO농도를 측정하여 연기의 유무를 파악하였다. 본 실험의 결과는 다음과 같다. 첫째, 터널 중앙화원인 경우 환기가 없어도 구난 터널에 연기가 검출되지 않았다. 둘째, 구난역 입구 부근에 화원을 설치한 경우 환기 조건을 주지 않으면 연기가 구난 터널로 침투하지만, 설계된 배기 조건시 연기는 구난터널로 전파하지 않았다.

터널 내 화재발생시 구난역 내의 연기 거동에 미치는 설계된 환기 영향에 대한 실험적 연구 (Experimental Study on the Designed Ventilation Effect on the Smoke Movement at Rescue Station fire in Railway Tunnel)

  • 김동운;이성혁;유홍선;윤성욱
    • 한국전산유체공학회:학술대회논문집
    • /
    • 한국전산유체공학회 2008년도 춘계학술대회논문집
    • /
    • pp.163-167
    • /
    • 2008
  • In this study, the 1/35 reduced-scale model experiment were conducted to investigate designed ventilation effect on the smoke movement at rescue station fire in railway tunnel. A model tunnel with 2 mm thick, 10 m long, 0.19 m high and 0.26 m was made by using Froude number scaling law. The cross-passages installing escape door at the center were connected between incident tunnel and rescue tunnel. The n-heptane pool fires with heat release rate 698.97W were used as fire source. The fire source was located at the center and portal of incident tunnel as worst case. A operating ventilation system extracted smoke amount of 0.015 cms(cubic meters per second). The smoke temperature and CO gas concentration in cross-passage were measured to verify designed ventilation system. The result showed that, at center fire case without ventilation, smoke did not propagate to rescues station. In portal fire case, smoke spreaded to rescues station without ventilation. But smoke did not propagated to rescues station with designed ventilation.

  • PDF

도로터널 위험도 평가프로그램 개발에 관한 연구(I) (The study of development of quantitative risk assesment program for the road tunnel)

  • 유지오;신현준;이동호
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2006년도 하계학술발표대회 논문집
    • /
    • pp.460-467
    • /
    • 2006
  • Some large accidents in tunnels in recent years, such as Mont Blanc, Gotthard and Tauern tunnels, have lead to an increasing attention for tunnel safety and necessity of tool for quantitative risk assesment of road tunnel. And the purpose of this study is to develop the quantitative risk assesment tool for the application of road tunnel. The objectives of this paper are as follows : (1) analyze of traffic accident rates in tunnel, (2) make out scenario for fire accidents, (3) develop the evacuation model and FED calculation model, (4) Present the results from quantitative risk assesment for the model tunnel according with the fire heat release rates and distances of cross passage.

  • PDF

해저철도터널(목포-제주간) 화재시 정량적 위험도 평가기법에 의한 피난연결통로 적정간격산정에 관한 연구 (The study on interval calculation of cross passage in undersea tunnel by quantitative risk assesment method)

  • 유지오;김진수;이동호;신현준
    • 한국터널지하공간학회 논문집
    • /
    • 제17권3호
    • /
    • pp.249-256
    • /
    • 2015
  • 현재 목포-제주간 해저터널은 타당성 검토를 위한 기본계획 중에 있으며, 노선의 길이가 108 km인 고속여객 전용선으로 단면형태는 유로터널과 같은 서비스터널을 설치한 단선쌍굴터널로 검토되고 있다. 또한 교통량은 10량 1편성의 열차가 일일 76편/편도 운행하는 것으로 계획하고 있다. 이에 본 연구에서는 터널의 피난연결통로의 적정 간격을 정량적 위험도 평가기법에 의해서 검토하는 것을 목표로 정량적 위험도 평가기법을 정립하였다. 또한 터널의 단면형태를 복선터널(Type 3), 쌍굴터널(Type 1) 및 복선터널을 격벽으로 분리하는 형태의 터널(Type 2)을 대상으로 단면형태별로 적정 피난연결통로 간격을 산정하였다. 본 연구결과, Type 2의 단면이 대피안전확보에 가장 효과적이며, 현행 국내 사회적 위험도 평가기준을 만족하기 위해서는 단면형태별로 350 m (Type 1), 400 m (Type 2), 1,500 m (Type 3)의 피난연결통로 간격이 요구되는 것으로 나타나고 있다.

장대 터널 내 구난역의 열차 화재 시 제연을 위한 1D-3D 연계 해석 (The 1D-3D Simulation for Smoke Ventilation in a Rescue Station of a Railroad Tunnel under the Fire)

  • 정재혁;허남건;이정표;김진곤
    • 설비공학논문집
    • /
    • 제22권10호
    • /
    • pp.665-671
    • /
    • 2010
  • In the present study a 1D-3D numerical simulation was performed to analyze the fire safety in a rescue station of a long railroad tunnel equipped with a mechanical ventilation. The behavior of hot air was studied for the emergency operation mode of ventilation system in case of fire in the rescue station. The 1D simulation was carried out for entire tunnel region. Detailed 3D CFD simulation was performed for the rescue station area in the central region of the tunnel by using the result of the 1D simulation as the boundary condition of the 3D simulation. Various type of cross passage installation were evaluated for the prevention of smoke diffusion to suggest the optimized interval of the cross passages in the rescue tunnel.