• Title/Summary/Keyword: cumulative absolute velocity

Search Result 14, Processing Time 0.027 seconds

Real-time Estimation of the Earthquake Magnitude Using the Bracketed Cumulative and Peak Parameters of the Ground-motion Acceleration of a Single Station (단일 지진관측소의 지반가속도 구간 누적값 및 최대값 파라미터를 이용한 실시간 지진규모 추정 연구)

  • Yun, Kwan Hee
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.18 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • In industrial facilities sites, the conventional method determining the earthquake magnitude (M) using earthquake ground-motion records is generally not applicable due to the poor quality of data. Therefore, a new methodology is proposed for determining the earthquake magnitude in real-time based on the amplitude measures of the ground-motion acceleration mostly from S-wave packets with the higher signal-to-ratios, given the Vs30 of the site. The amplitude measures include the bracketed cumulative parameters and peak ground acceleration (As). The cumulative parameter is either CAV (Cumulative Absolute Velocity) with 100 SPS (sampling per second) or BSPGA (Bracketed Summation of the PGAs) with 1 SPS. The arithmetic equations to determine the earthquake magnitude are derived from the CAV(BSPGA)-As-M relations. For the application to broad ranges of earthquake magnitude and distance, the multiple relations of CAV(BSPGA)-As-M are derived based on worldwide earthquake records and successfully used to determine the earthquake magnitude with a standard deviation of ${\pm}0.6M$.

Earthquake risk assessment of concrete gravity dam by cumulative absolute velocity and response surface methodology

  • Cao, Anh-Tuan;Nahar, Tahmina Tasnim;Kim, Dookie;Choi, Byounghan
    • Earthquakes and Structures
    • /
    • v.17 no.5
    • /
    • pp.511-519
    • /
    • 2019
  • The concrete gravity dam is one of the most important parts of the nation's infrastructure. Besides the benefits, the dam also has some potentially catastrophic disasters related to the life of citizens directly. During the lifetime of service, some degradations in a dam may occur as consequences of operating conditions, environmental aspects and deterioration in materials from natural causes, especially from dynamic loads. Cumulative Absolute Velocity (CAV) plays a key role to assess the operational condition of a structure under seismic hazard. In previous researches, CAV is normally used in Nuclear Power Plant (NPP) fields, but there are no particular criteria or studies that have been made on dam structure. This paper presents a method to calculate the limitation of CAV for the Bohyeonsan Dam in Korea, where the critical Peak Ground Acceleration (PGA) is estimated from twelve sets of selected earthquakes based on High Confidence of Low Probability of Failure (HCLPF). HCLPF point denotes 5% damage probability with 95% confidence level in the fragility curve, and the corresponding PGA expresses the crucial acceleration of this dam. For determining the status of the dam, a 2D finite element model is simulated by ABAQUS. At first, the dam's parameters are optimized by the Minitab tool using the method of Central Composite Design (CCD) for increasing model reliability. Then the Response Surface Methodology (RSM) is used for updating the model and the optimization is implemented from the selected model parameters. Finally, the recorded response of the concrete gravity dam is compared against the results obtained from solving the numerical model for identifying the physical condition of the structure.

Development of earthquake instrumentation for shutdown and restart criteria of the nuclear power plant using multivariable decision-making process

  • Hasan, Md M.;Mayaka, Joyce K.;Jung, Jae C.
    • Nuclear Engineering and Technology
    • /
    • v.50 no.6
    • /
    • pp.860-868
    • /
    • 2018
  • This article presents a new design of earthquake instrumentation that is suitable for quick decision-making after the seismic event at the nuclear power plant (NPP). The main objective of this work is to ensure more availability of the NPP by expediting walk-down period when the seismic wave is incident. In general, the decision-making to restart the NPP after the seismic event requires more than 1 month if an earthquake exceeds operating basis earthquake level. It affects to the plant availability significantly. Unnecessary shutdown can be skipped through quick assessments of operating basis earthquake, safe shutdown earthquake events, and damage status to structure, system, and components. Multidecision parameters such as cumulative absolute velocity, peak ground acceleration, Modified Mercalli Intensity Scale, floor response spectrum, and cumulative fatigue are discussed. The implementation scope on the field-programmable gate array platform of this work is limited to cumulative absolute velocity, peak ground acceleration, and Modified Mercalli Intensity. It can ensure better availability of the plant through integrated decision-making process by automatic assessment of NPP structure, system, and components.

Development of energy-based excess pore pressure generation model using damage potential (손상잠재력을 이용한 에너지-과잉간극수압 발현 모델 개발)

  • Park, Keun-Bo;Kim, Soo-Il;Kim, Ki-Poong;Lee, Chae-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.575-586
    • /
    • 2008
  • The main objective of this paper is to develop an improved model for the analysis of liquefaction potential and to predict excess pore pressure (EPP) using the proposed model that can simulate behavior of saturated sand under earthquake loading conditions. The damage concept is adopted for the development of the proposed model. For the development of the model, a general formulation based on experimental results and damage potential using cumulative absolute velocity (CAV) is proposed for a more realistic description of dynamic responses of saturated sand. Undrained dynamic triaxial tests are conducted using earthquake loading conditions. Based on test results, the NCER-NCW function in terms of $w_d$ and CAV is developed. Procedure for the evaluation of EPP and determination of model parameters for the proposed model is presented as well. For the determination of initial liquefaction, the minimum curvature method using the NCS-NCW curve is proposed. It is observed that predicted initial liquefaction using the proposed method agrees well with measured initial liquefaction. From results of additional undrained dynamic triaxial tests, it is seen that predicted EPP generation using the proposed model agrees well with measured results for earthquake loading cases.

  • PDF

Study on the Use of Bracketed Summations of the Peak Ground-motion Acceleration Per Second for Rapid Earthquake Alert Notifications (신속 지진피해통보를 위한 지반가속도의 초당 최대값 구간적산 방법의 활용에 관한 연구)

  • Yun, Kwan-Hee
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.16 no.1
    • /
    • pp.37-45
    • /
    • 2012
  • In an effort to further exploit the peak ground-motion acceleration (PGA) information per second available in real time by the enacted law, bracketed summations of the PGA per second ($BSPGA_k$) for 30 seconds based on the records with a rate of 100 samples were compared with the cumulative absolute velocity (CAV) and earthquake intensities based on a worldwide database of records from small-to-large earthquakes. The CAV, currently in use as an earthquake damage indicator for nuclear power plants due to its strong correlation with the earthquake intensity, has the disadvantage of requiring a massive amount of digital data with a rate of more than 100 samples per second. The comparative study shows that the $BSPGA_k$ is well correlated with the CAV over the wide range of strong ground-motion levels, which suggests that the $BSPGA_k$ is one of the new promising ground-motion parameters especially useful for rapid earthquake alert notifications through an earthquake monitoring network. Based on the domestic database of records from small-to-moderate earthquakes with felt reports, it is also observed that the $BSPGA_k$ is comparable to the CAV and better than the PGA in predicting the intensity by using the correlation relation.

Implementation of underwater precise navigation system for a remotely operated mine disposal vehicle

  • Kim, Ki-Hun;Lee, Chong-Moo;Choi, Hyun-Taek;Lee, Pan-Mook
    • International Journal of Ocean System Engineering
    • /
    • v.1 no.2
    • /
    • pp.102-109
    • /
    • 2011
  • This paper describes the implementation of a precise underwater navigation solution using a multiple sensor fusion technique based on USBL, GPS, DVL and AHRS measurements for the operation of a remotely operated mine disposal vehicle (MDV). The estimation of accurate 6DOF positions and attitudes is the key factor in executing dangerous and complicated missions. To implement the precise underwater navigation, two strategies are chosen in this paper. Firstly, the sensor frame alignment to the body frame is conducted to enhance the performance of a standalone dead-reckoning algorithm. Secondly, absolute position data measured by USBL is fused to prevent cumulative integration error. The heading alignment error is identified by comparing the measured absolute positions with the DR algorithm results. The performance of the developed approach is evaluated with the experimental data acquired by MDV in the South-sea trial.

Strain-Based Structural Integrity Evaluation Methods for Nuclear Power Plant Piping under Beyond Design Basis Earthquake (설계기준초과지진 하의 원전 배관 구조건전성 평가를 위한 변형률 기반 방법)

  • Lee, Dae Young;Park, Heung Bae;Kim, Jin Weon;Ryu, Ho Wan;Kim, Yun-Jae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.12 no.2
    • /
    • pp.66-70
    • /
    • 2016
  • Following the 2011 Fukushima Nuclear Power Plant accident, the IAEA has issued a revised version of the Nuclear Safety Standard for beyond design basis earthquake to consider the core meltdown accident. In Korea, relevant laws and regulations were also revised to consider beyond design basis earthquake to nuclear components. In this paper, CAV, an seismic damage factor that determines the restart of nuclear power plant after operating breakdown earthquake, is proposed for extension to the beyond design basis earthquake. For pipings not satisfying the beyond design basis earthquake condition, several evaluation methods are suggested, such as strain-based evaluation methods, simple nonlinear analysis method and cumulative damage evaluation method.

Real-time seismic structural response prediction system based on support vector machine

  • Lin, Kuang Yi;Lin, Tzu Kang;Lin, Yo
    • Earthquakes and Structures
    • /
    • v.18 no.2
    • /
    • pp.163-170
    • /
    • 2020
  • Floor acceleration plays a major role in the seismic design of nonstructural components and equipment supported by structures. Large floor acceleration may cause structural damage to or even collapse of buildings. For precision instruments in high-tech factories, even small floor accelerations can cause considerable damage in this study. Six P-wave parameters, namely the peak measurement of acceleration, peak measurement of velocity, peak measurement of displacement, effective predominant period, integral of squared velocity, and cumulative absolute velocity, were estimated from the first 3 s of a vertical ground acceleration time history. Subsequently, a new predictive algorithm was developed, which utilizes the aforementioned parameters with the floor height and fundamental period of the structure as the new inputs of a support vector regression model. Representative earthquakes, which were recorded by the Structure Strong Earthquake Monitoring System of the Central Weather Bureau in Taiwan from 1992 to 2016, were used to construct the support vector regression model for predicting the peak floor acceleration (PFA) of each floor. The results indicated that the accuracy of the predicted PFA, which was defined as a PFA within a one-level difference from the measured PFA on Taiwan's seismic intensity scale, was 96.96%. The proposed system can be integrated into the existing earthquake early warning system to provide complete protection to life and the economy.

Spectral Characteristics of the June 2, 1999 Kyeongju Earthquake (1999년 6월 2일 경주 지진의 스펙트럼 특성)

  • 신진수
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 1999.10a
    • /
    • pp.37-44
    • /
    • 1999
  • Spectral characteristic of Kyeongju earthquake occurred on the June 2, 1999 with magnitude 3,4 is analyzed. It is guessed that the stress energy release of source within relatively short period caused the ground near the epicenter to vibrate with large amplitude for the magnitude and predominantly high frequency. The cumulative absolute velocity and average spectrum acceleration are 0.034 gsec and 0.118g, respectively lower than threshold values of potential earthquake damage which is consistent with the investigation of damage in field. The analysis of the acceleration records of Kyeongju earthquake shows the need to develop the ration criterion for the determining the operating basis earthquake of nuclear power plant.

  • PDF

Application of the JMA instrumental intensity in Korea (일본 기상청 계측진도의 국내 활용)

  • Kim, Hye-Lim;Kim, Sung-Kyun;Choi, Kang-Ryong
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.14 no.2
    • /
    • pp.49-56
    • /
    • 2010
  • In general, the seismic intensity deduced from instrumental data has been evaluated from the empirical relation between the intensity and the PGA. From the point of view that the degree of earthquake damage is more closely associated with the seismic intensity than with the observed PGA, JMA developed the instrumental seismic intensity (JMA instrumental intensity) meter that estimate the real-time seismic intensity from the observed strong motion data to obtain a more correct estimate of earthquake damage. The purpose of the present study is to propose a practical application of the JMA instrumental intensity in Korea. Since the occurrence of strong earthquakes is scarce in the Korean Peninsula, there is an insufficiency of strong motion data. As a result, strong motion data were synthesized by a stochastic procedure to satisfy the characteristics of a seismic source and crustal attenuation of the Peninsula. Six engineering ground motion parameters, including the JMA instrumental intensity, were determined from the synthesized strong motion data. The empirical relations between the ground motion parameters were then analyzed. Cluster analysis to classify the parameters into groups was also performed. The result showed that the JMA acceleration ($a_0$) could be classified into similar group with the spectrum intensity and the relatively distant group with the CAV (Cumulative Absolute Velocity). It is thought that the $a_0$ or JMA intensity can be used as an alternative criterion in the evaluation of seismic damage. On the other hand, attenuation relation equations for PGA and $a_0$ to be used in the prediction of seismic hazard were derived as functions of the moment magnitude and hypocentral distance.