A Basic Study for Building VET/CM Leading Construction VE Process (VET/CM 주도형 시공VE 프로세스 구축을 위한 기초연구)

  • Song, Hyun-Jang;Cha, Yong-Woon;Lee, Hyun-Jong;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.233-234
    • /
    • 2016
  • Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.

  • PDF

Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors (핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구)

  • Park, Heedae;Han, Seung Heon;Kim, Sung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.399-408
    • /
    • 2009
  • The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.

VE Adaptability and Activation plan in Design Phase of BTL Projects (민간투자(BTL)사업의 설계VE 적용 및 활성화 방안 연구)

  • Shin, Jeong-Hoon;Sim, Un-Jun;Lee, Taick-Oun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.4
    • /
    • pp.93-99
    • /
    • 2007
  • Highly advanced technologies are being adopted into the domestic construction industry in accordance with rapidly changing global construction industry in the 21st century. Value Engineering methodologies have often been discussed but not yet settled in the country. This research, therefore, aims to provide a useful guide to utilizing design Value Engineering in Build Transfer Lease. 1. Questionnaires had been conducted, answered by those in the field. 2. Questionnaires were in regard to the obstacles in the application of design Value Engineering and activation schemes. 3. Five standards were provided to be chosen according to the degree of influence from each factor, whose answers were technically analyzed by a statistical program afterward. 4. Four obstacles classified in this method were approached systematically to analyze the problems. 5. Efficient Activation schemes have been suggested after various analyses in a variety of aspects.

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

An Efficient Idea Creation Method of Design Value Engineering for Construction Projects (건설 프로젝트 설계VE의 효율적인 아이디어 창출 방법)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.55-63
    • /
    • 2006
  • As value engineering in design phase is big in the effect of application, analysis by systematic procedures is required. The most important part is the stage of creation for making of idea. It takes much time for us to make good idea involving the brainstorming and delphi in recent making idea. It is expected because most experts in participating in design value engineering is to approach with less effective method. In this study we suggest that application of ASIT(Advanced Systematic Inventive Thinking) is the method as way of creative idea making. ASIT is expected to perform Idea making with systematic procedure and to create effective idea in short time.

A Study on the Collaboration of the Function Analysis and Idea Creation Phase with Function Integration FAST(FI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) (통합 기능계통도와 계층적 컨셉모듈을 활용한 기능분석단계와 창조단계의 연계성에 관한 고찰)

  • In, Chi-Sung;NamKung, In-Il;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.355-360
    • /
    • 2006
  • Function analysis and idea creation phase in Value Engineering(VE) Process is applied to manufacturing Industry for developing functions for elements of products, and in construction come to use various components like process, size of project, spaces as well as function itself due to multi-functional aspect. For this reason, VE applications to the construction industry are considered to be less frequent and efficient than to the manufacturing. To resolve this problem, a new technique of Function Integration Fast(HI FAST) and Hierarchical Value Engineering Concept Modules(HVECM) was made for practical integration and sequence of VE job Plan. Two types of function would be defined In this method, first and second function, during the job Plan process, and two function champions be selected for next creation phase process. For verification of consecutiveness of function analysis and idea creation phase for successful VE project implementation, this methodology was tested under design phase in office and IT Multi-functional building project. Make sure the successful application of this process with this method, need to develop the talent of VE experts and team members for process of function analysis and creation phase.

  • PDF

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Subject Selection Model of Green VE for Sustainable Design (친환경건축물 설계를 위한 Green VE 대상선정모델)

  • Song, Chang-Yeob;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.42-52
    • /
    • 2011
  • As environmental issues are rising recently efforts to reduce environmental stress are emerging in all industry segments. Especially environmental impact of buildings occupy a critical portion, so each country is operating green building rating system for life cycle of buildings. Accordingly green building rating system for every facility is operating in Korea. And acquisition of grade I for building energy efficiency is mandatory for every new public buildings since 2010. To design green building efficiently and systematically eco-friendly elements should be considered and checked from the schematic design phase. But in many cases eco-friendly elements are checked at the end of constructed design phase. So applying eco-friendly elements at the value engineering process, which is performing through schematic and constructed design phase, could make a efficient and systematic green building design. Value engineering process is divided into pre workshop, workshop and post workshop stages. And subject selection in pre workshop stage is the step that finds out the subjects which has the great possibility to be improved to perform efficient value engineering workshop. So this study present the Green VE subject selection model to select the most considerable eco-friendly subjects in projects.

A study of the function analysis for the effective campus master plan through value engineering method (효율적인 캠퍼스 마스터 플랜을 위한 설계VE 기능분석 연구)

  • Min, Kyung-Suk
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.9 no.3
    • /
    • pp.41-48
    • /
    • 2010
  • It has been found that implementing the function analysis is very important in terms of accomplishing successful Value Engineering(VE), and the function definition is a basic activity at design VE phase. In spite of the importance, the real function analysis activities in the VE are not regard as consequence. In this regard, this paper attempts to use the campus mater plan to lead an effective function analysis. So, the purpose of this value engineering study is to provide the criteria to develop the campus mater plan. This value engineering study used as a guide for the standardization of the campus mater plan. In addition, broader application is possible through the analysis throughout the different ways of the project.

Preliminary Study on Applying VE to Design Change (설계변경 시 VE 적용을 위한 예비연구)

  • Nam, Keong-Woo;Jang, Myung-houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.80-81
    • /
    • 2019
  • Change requests occur persistently in the construction phase of a construction project. The law requires that the contract amount be adjusted in accordance with the relevant regulations when there is a change in the construction amount due to the design change in the construction contract. SAVE international, on the other hand, defines the value methodology as a systematic and structured approach to improving projects, products and processes. Design Changes in the construction projects require organizational efforts to improve value and quality. However, the law does not include change requests in which the VE object is fixed and related data is collected and function analysis can be derived in a short time. Therefore, it is necessary to apply VE to the design change procedure, which can further improve the value of construction work. The application derived from this study need to be presented as simply as possible without compromising the basic concept of VE. If the application is extended to the field and proved to be effective, it is expected to contribute to the overall value of construction work.

  • PDF