• Title/Summary/Keyword: design phase VE

Search Result 57, Processing Time 0.023 seconds

Development of Function Breakdown Structure of Building Element based on Performance for Idea Connection in Design VE (설계VE Idea 연계를 위한 성능기반 건물 부위별 기능분류체계 개발)

  • Lee, In-Jai;Hyun, Chang-Taek;Son, Myung-Jin;Kim, Dae-Hyun;Kim, Yun-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.12-22
    • /
    • 2011
  • Design value engineering (VE) has been performed in many construction projects according to the changes in the construction for most of the VB function analysis that performed, are problems that focus on function analysis and generating ideas based on individual experience of VE team member than generating ideas and value improvement of systematic function analysis. This may be due to the quotation of previously performed function analysis data, general function analysis, and abstract function definitions that do not cite the concrete characteristics of each facility. Therefore, in this study, the proposed cases from the existing design VE workshops, the current conditions of the connection between functions and ideas and of the idea categorization by building part were studied to determine why functions and ideas are not connected, and to propose pertinent improvement directions. on a performance-based function categorization system by building part that can provide the logical connection between functions and ideas in the function definition/categorization and function arrangement phases in the function analysis phase, the most important phase in VE activities, was developed by reflecting the required performance and functions for each part of the facility.

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

A study of analysis about application of design value engineering in the rural apartment building (농촌지역 아파트 공사 설계VE의 공간별 적용방법 분석 연구)

  • Min, Kyung-Seok
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.8 no.1
    • /
    • pp.17-24
    • /
    • 2006
  • The purpose of this study is to provide the systematic report and analysis about Apartment VE application in Design Phase. In this study, the method of VE application is classified into foure groups-changing materials, changing a method of construction, acceptance of new technology, and use of new device. The facts found in this study can be summarized as follows. Application rate of VE is highest in building circumference parts. The main reason would be that there are many applicable factors according to locations, types of work, etc. Parking lots also show similar results with the same reason. It means there are a lot of possibility to adapt value engineering in these steps during the work. So far application of value engineering has been so limited that just small changes of process or method have been tried. One reason is the lack of challenging and the other is some characteristics of construction work which is very difficult to fix after completion. In the future, it would be more efficient to apply new technology and new device in construction work. Though these attempts have been ignored in Korea so far, there are still lots of possibilities to be developed in value engineering.

  • PDF

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

An investigation of Function Analysis patterns for the Effective VE at the Design Phase (효과적인 설계VE 활동을 위한 기능분석 유형조사)

  • Min Kyung-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.63-71
    • /
    • 2004
  • This study is an analysis the function Analysis Patterns for the effective application of VE(Value Engineering) and a presentation of the function analysis methods. 1. The function analysis of VE activities can be summarized 6 patterns as follows ; a generated ideas without function analysis process, a function analysis make use of inspection tools for generated idea, an illogical jump as a using of subjective terms, a using of duplication terms for same functions, a subjective ranking as function definitions for function analysis, and a large classification for a for approaching function definition. 2. In order for the effective function analysis, the process requires as follows; a check level by project advanced, a reclassified main nouns in the order of frequency of use, a main check objects by concepts of importance and satisfaction degree. It is not only good for the effective function analysis, it also induces effective turn out of the FAST Diagram for function arrangement.

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

ROADWAY PERFORMANCE EVALUATION USING FUNCTION ANALYSIS METHOD OF VALUE ENGINEERING

  • Jong-Hyun Park;Yong-Jang Lee;In-Su Jung;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1528-1533
    • /
    • 2009
  • Infrastructure is provided to the user through long-term project period and large-scale working expenses. Existing facilities are getting old as time goes by. Accordingly, proper maintenance is required and generally more maintenance cost than initial invested cost is needed during life cycle. Therefore, a specific plan that just increases the value of facilities is required by evaluating performance of facilities and inputting minimum maintenance cost. Value engineering that increases the value of object by systemically analyzing Life Cycle Costs and function is actively promoted at the design phase of construction. These efforts can increase the performance of facilities at the maintenance phase of infrastructure. This study is to search how to evaluate the performance of Roadway by utilizing function analysis, as a core part of VE in the maintenance phase. In order to this a new evaluation criteria were proposed by adding an evaluation items to the existing criteria through the research of old documents, status of roadway maintenance and function analysis of VE. The results of this study may promote the effective performance evaluation to determine a resolution of roadway congestion in future. A succeeding study using the proposed evaluation criteria will be required.

  • PDF

A Study on the status and improvement of construction management in Susung Culture & Art Center (수성문화예술회관의 건설사업관리 적용 현황과 향후 발전 방향에 관한 연구)

  • Park, Byung-Hak;Yoo, Byung-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.45-52
    • /
    • 2006
  • Recently The public project ordering in local autonumous entities is a tendency increasing of CM service because of the visible and affirmative effect in the CM which is advanced meanwhile. And, the CM services of project all phase excepts a planning business are performed. To develop CM must be prepared the system plans concerned with the CM application from planning phase, actuality maintenance of CM fee-estimation standard, understanding conversion of participation subjects, the specialization through certification of CM qualification, etc. But, unexpected actuality the problems occurs when the CM business is performing. The purpose of this study are to present the solution to the problems concerned with the design management, design phase VE, additional business by owner, schedule control and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Susung Culture & Art Center.

  • PDF

A Study on Information Collection and Idea Creation Using Drones (드론을 활용한 정보수집 및 아이디어 창출에 관한 연구)

  • Jo, Hwani;Yoo, Jaewon;Choi, Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.117-124
    • /
    • 2024
  • The objective of Value Engineering (VE) is to derive the optimal value at the most efficient life cycle cost, comprising three stages: Pre-Study, Study, and Post-Study. In this study, we propose a method for information collection and analysis during planned site visit surveys in the preparation stage of VE. The 3D spatial model, created using a drone, facilitated observation and analysis of the study area from various angles, both from the center and the outside. Additionally, through the utilization of drones, we conducted on-site investigations of the research area's 3D spatial model, enabling a macroscopic perspective previously only feasible through a microscopic viewpoint during planned site visits in the pre-study phase. Furthermore, the utilization of actual spatial data obtained from observations allowed for real-time information verification during Design VE workshops, enhancing the efficiency and reliability of the VE project.

An In-depth Analysis of Enhancing the Core Blueprint of Architectural Constructs Leveraging Value Engineering(VE) Techniques (VE 기법을 활용한 건축 구조물 코어 형식 개선 방안에 관한 연구)

  • Lee, Jae-Taek;Kim, Gyu-Yong;Lee, Jae-Hyun;Nam, Jeong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.571-581
    • /
    • 2023
  • The contemporary domestic construction landscape has witnessed a contraction, primarily attributed to the operational challenges faced by construction entities and a downtrend in the initiation of new projects. In light of this, domestic construction enterprises are ardently seeking avenues to economize whilst simultaneously amplifying the quality across diverse construction genres. Value engineering (VE), heralded for its prowess in not only cost mitigation but also in accelerating project timelines and bolstering construction quality, has been extensively adopted in refining finishing tasks. However, its application to framework enhancements remains conspicuously limited. Particularly in factory edification, framing emerges as a pivotal process exerting significant influence over the entire construction continuum. Thus, it becomes imperative to integrate VE techniques at the inception phase of framing. This would facilitate a meticulous examination of design schematics and on-site conditions, paving the way for alternative strategies that condense construction durations, economize on costs, and augment work efficiency, all the while upholding paramount standards of quality and safety. Such a venture stands to be foundational in expediting construction timelines, fostering economic efficiency, and buttressing construction safety protocols.