• Title/Summary/Keyword: design-build project

Search Result 218, Processing Time 0.03 seconds

Cost Performance Comparison of Project Delivery Methods in Public Sector - Focusing on Mediator Effect of Biddropping on Change Orders - (공공건설공사 발주방식에 따른 비용성과 실증비교 - 설계변경에 대한 낙찰률 매개효과를 중심으로 -)

  • Moon, Hyosoo;Lee, Hyun-Soo;Park, Moonseo;Lee, Bogyeong;Joo, Seonu;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.86-96
    • /
    • 2015
  • According to previous research, the reason why Design-Build(hereinafter "DB") outperforms Design-Bid-Build(hereinafter "DBB") in terms of cost is due to less change orders(hereinafter "COs"). However, if biddropping was low for DBB resulting into increasing COs, then it would be wrong to conclude that DB is superior due to less COs. Therefore, in order to confirm such misjudgment, the attempt to comprehensively analyze biddropping, COs and delivery method was made as previous methods had analyzed either the relationship between delivery method and COs, or biddropping and COs. This research uses path analysis, which simultaneously compares effect sizes on COs according to delivery method and biddropping based on the project type, and validated the mediator effect. The research proved that DB outperforms DBB due to less COs cannot be validated as biddropping caused a mediator effect by intervening between the delivery method and COs for specific project types. Therefore, the mechanism of delivery method acts on COs through biddropping was established. Also, the identity of biddropping was investigated in a different perspective from previous research. Based on this result, this research is expected to help determine a delivery method by considering the mediator effect of specific projects and evaluate performance.

A Study on the Requirement Information Management Model and Process Linked to Space Planning in the Early Design Stage

  • Jae Ho, Cho;Sang Woo, Kim;Bo Sik, Son;Jae Youl, Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.566-569
    • /
    • 2013
  • The purpose of this research is to develop the technology to meet the requirements of the design content, and to build a 'Requirement Information Management Model' for the design project. The model that should be used in the early design stage will undergo the following process: First, basic requirements would be defined by extracting the design content in the form of a reusable library of space units. At the next stage, requirement information should be modified after considering unique characteristics for the project and conflict problems between function and performance.

  • PDF

The Deduction of the Success Factor in Construction Projects by Design Build Methods (디자인 빌드(Design Build) 방식 건설 프로젝트의 성공요인 분석에 관한 연구 - 중.소규모 건설 프로젝트를 중심으로)

  • Lee, Chi-Joo;Kim, Sang-Ki;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.182-190
    • /
    • 2007
  • The minor construction companies in Korea have grown in focusing on the construction operation field. Also, soft field is vulnerable area, and there are not enough delivery systems, therefore, a capacity of the construction industry expansion and productivity is insufficient. Furthermore, the minor construction companies are losing their areas, because the major construction companies having numerous know-how and ample funds are competitive. As the construction industry are more larger and complicated, the design build methods might be increased in the construction industry and the minor construction companies could have more competitive. Hence, this paper analyzes the success factor in minor construction projects by design build methods focusing on instance $company^{\circ}{\phi}s$ case and survey, and critical success factor deduction and importance degree analysis of this factor using AHP analysis. In addition, this paper gives fundamental data how to manage the construction project effectively for minor construction $companies^{\circ}{\phi}s$ expansion in near future.

Market KU Project (마켓 KU 프로젝트)

  • Kim, In-Kyung
    • Journal of the Korea Fashion and Costume Design Association
    • /
    • v.12 no.3
    • /
    • pp.83-92
    • /
    • 2010
  • The current design paradigm shift which has been in progress around the world would be a good opportunity for Korea, which has led the age of information, to build design competence and gain international competitiveness. In addition, it would be a good idea for colleges as well as firms to develop a new educational system and create academia-industry-research synergy. This paper researches the market KU project promoted by Design Venture KU which has been established by the College of Artand Design of Konkuk University as a part of differentiation strategy. The methods to improve the competitiveness of Korean fashion design by uniting college creativity and market practicality are as follows: First, for convergence of creativity and practicality, it is necessary to come up with a systematic design-based educational system. In other words, the undergraduate program needs to gradually expand courses by focusing on creativity instead of functions while the graduate program should be able to develop design pattern, textile and marketing products and secure the market to gain competitiveness as a business incubator. Second, the working-level engineers as well as professors will be encouraged to participate in special lectures or seminars and take necessary lessons. In addition, academia-industry cooperation courses will be further strengthened. It is also important to actively participate in an official contest or exhibition and receive a prize. Third, to elicit creativity from students, it is necessary to help them think in a flexible and experimental way with voluntary and interesting programs. As mentioned above, it is expected that 'Market KU Project' would help students build expertise by offering them a chance to experience the real world and become the world's leading designers in Korean fashion design.

  • PDF

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

Teaching Magnetic Component Design in Power Electronics Course using Project Based Learning Approach

  • Hren, Alenka;Milanovic, Miro;Mihalic, Franc
    • Journal of Power Electronics
    • /
    • v.12 no.1
    • /
    • pp.201-207
    • /
    • 2012
  • This paper presents the results and gained experiences from the Project Based Learning (PBL) of magnetic component design within a Power Electronics Course. PBL was applied during the laboratory exercises through a design-project task based on a boost converter test board. The students were asked to calculate the main boost converter's circuit parameters' capacitor C and inductor L, and then additionally required to design and build-up the inductor L, in order to meet the project's goals. The whole PBL process relied on ideas from the CDIO (Conceive, Design, Implement, Operate), where the students are encouraged to consider the whole system's process, in order to obtain hands-on experience. PBL is known to be a motivating and problem-centered teaching method that gives students the ability to transfer their acquired scientific knowledge into industrial practice. It has the potential to help students cope with demanding complexities in the field, and those problems they will face in their future careers.

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

An overall valuation about propriety of school facilities BTL through AHP (AHP를 이용한 학교시설 민간투자사업(BTL)의 타당성 종합평가)

  • Ha, Ho-Sung
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.5 no.1
    • /
    • pp.22-39
    • /
    • 2006
  • The purpose of this study is an overall valuation about propriety study of school facilities BTL(Build-Transfer-Lease) by means of AHP(Analytic Hierarchy Process). The search point includes these questions. Is BTL of school facilities a reasonable project for school, or is the former government financial project on the position of comparative superiority? And, is a partial BTL possible as an alternative plan? The result of this study shows that preference rate about BTL is 39%, that of former government financial project is 32%, and that of partial BTL is 29%.

  • PDF

The DB structure for Standard Criteria of Urban Transit Facilities (도시철도시설 표준화기준을 위한 DB구축방안 연구)

  • Lee, Woo-Dong;Kim, Jin-Ho;Han, Seok-Youn;Sin, Won-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2008.10c
    • /
    • pp.213-214
    • /
    • 2008
  • Since standardization project is composed of complicate system, such as vehicle, signal, electric power and railway, how to build management system of the project has influence on the success of the project for the first stage of the project. The computer system design tool supports to carry out requirement analysis, DB construction, and history and follow-up management efficiently. Therefore, the aim of this study is to investigate the method to optimize schema using computer system design tool.

  • PDF

A Study on the BIM-based Design for the Elements of Wooden Structure of Korean Traditional Buildings Through a Parametric Design Methodology (파라메트릭 디자인 방법론을 활용한 한옥 목구조부재의 BIM 설계 프로세스 연구)

  • Park, Jung-Dae
    • Korean Journal of Computational Design and Engineering
    • /
    • v.16 no.2
    • /
    • pp.104-113
    • /
    • 2011
  • With the rising social interest in the sustainable life, demands are growing for Hanok, as a viable alternative to modernized architecture of Western origin. However, even Hanok is gaining popularity among the general public, its design and construction are still a minor practice. Aiming to build an information system of Hanok, this research proposes a new design process for traditional architecture, utilizing a parametric design methodology. This process, based on the understanding of tectonic joints and spatial composition of our traditional architecture, defines a parametric relationship among the structural elements that compose Hanok. The research uses Gehry Technologies' Digital Project and Autodesk Revit Architecture to apply a concurrent parametric design methodology, approaching the project in both bottom-up and top-down to present a new design process for Hanok elements.