• Title/Summary/Keyword: deterministic safety assessment

Search Result 56, Processing Time 0.032 seconds

Recent research towards integrated deterministic-probabilistic safety assessment in Korea

  • Heo, Gyunyoung;Baek, Sejin;Kwon, Dohun;Kim, Hyeonmin;Park, Jinkyun
    • Nuclear Engineering and Technology
    • /
    • v.53 no.11
    • /
    • pp.3465-3473
    • /
    • 2021
  • For a long time, research into integrated deterministic-probabilistic safety assessment has been continuously conducted to point out and overcome the limitations of classical ET (event tree)/FT (fault tree) based PSA (probabilistic safety assessment). The current paper also attempts to assert the reason why a technical transformation from classical PSA is necessary with a re-interpretation of the categories of risk. In this study, residual risk was classified into interpolating- and extrapolating-censored categories, which represent risks that are difficult to identify through an interpolation or extrapolation of representative scenarios due to potential nonlinearity between hardware and human behaviors intertwined in time and space. The authors hypothesize that such risk can be dealt with only if the classical ETs/FTs are freely relocated, entailing large-scale computation associated with physical models. The functional elements that are favorable to find residual risk were inferred from previous studies. The authors then introduce their under-development enabling techniques, namely DICE (Dynamic Integrated Consequence Evaluation) and DeBATE (Deep learning-Based Accident Trend Estimation). This work can be considered as a preliminary initiative to find the bridging points between deterministic and probabilistic assessments on the pillars of big data technology.

A Deterministic Safety Assessment of a Pyro-processed Waste Repository (A-KRS 처분 시스템 결정론적 안전성 평가)

  • Lee, Youn-Myoung;Jeong, Jongtae;Choi, Jongwon
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.10 no.3
    • /
    • pp.171-188
    • /
    • 2012
  • A GoldSim template program for a safety assessment of a hybrid-typed repository system, called "A-KRS," in which two kinds of pyro-processed radioactive wastes, low-level metal wastes and ceramic high-level wastes that arise from the pyro-processing of PWR nuclear spent fuels are disposed of, has been developed. This program is ready both for a deterministic and probabilistic total system performance assessment which is able to evaluate nuclide release from the repository and farther transport into the geosphere and biosphere under various normal, disruptive natural and manmade events, and scenarios. The A-KRS has been deterministically assessed with 5 various normal and abnormal scenarios associated with nuclide release and transport in and around the repository. Dose exposure rates to the farming exposure group have been evaluated in accordance with all the scenarios and then compared among other.

Application of inverse reliability method to estimation of cable safety factors of long span suspension bridges

  • Cheng, Jin;Xiao, Ru-Cheng
    • Structural Engineering and Mechanics
    • /
    • v.23 no.2
    • /
    • pp.195-207
    • /
    • 2006
  • An efficient and accurate algorithm is proposed to estimate cable safety factor of suspension bridges satisfying prescribed reliability levels. Uncertainties in the structure and load parameters are incorporated. The proposed algorithm integrates the concepts of the inverse reliability method and deterministic method for assessing cable safety factors of suspension bridges. The unique feature of the proposed method is that it offers a tool for cable safety assessment of suspension bridges, when the reliability level is specified as a target to be satisfied by the designer. After the accuracy and efficiency of the method are demonstrated through two numerical examples, the method is used to estimate cable safety factors of suspension bridges with span length ranging from 2000 to 5000 m. The results show that the deterministic method overestimates cable safety factor of suspension bridges because of neglecting the parameter uncertainty effects. The actual cable safety factor of suspension bridges should be estimated based on the proposed method.

Comparison of Deterministic and Probabilistic Approaches through Cases of Exposure Assessment of Child Products (어린이용품 노출평가 연구에서의 결정론적 및 확률론적 방법론 사용실태 분석 및 고찰)

  • Jang, Bo Youn;Jeong, Da-In;Lee, Hunjoo
    • Journal of Environmental Health Sciences
    • /
    • v.43 no.3
    • /
    • pp.223-232
    • /
    • 2017
  • Objectives: In response to increased interest in the safety of children's products, a risk management system is being prepared through exposure assessment of hazardous chemicals. To estimate exposure levels, risk assessors are using deterministic and probabilistic approaches to statistical methodology and a commercialized Monte Carlo simulation based on tools (MCTool) to efficiently support calculation of the probability density functions. This study was conducted to analyze and discuss the usage patterns and problems associated with the results of these two approaches and MCTools used in the case of probabilistic approaches by reviewing research reports related to exposure assessment for children's products. Methods: We collected six research reports on exposure and risk assessment of children's products and summarized the deterministic results and corresponding underlying distributions for exposure dose and concentration results estimated through deterministic and probabilistic approaches. We focused on mechanisms and differences in the MCTools used for decision making with probabilistic distributions to validate the simulation adequacy in detail. Results: The estimation results of exposure dose and concentration from the deterministic approaches were 0.19-3.98 times higher than the results from the probabilistic approach. For the probabilistic approach, the use of lognormal, Student's T, and Weibull distributions had the highest frequency as underlying distributions of the input parameters. However, we could not examine the reasons for the selection of each distribution because of the absence of test-statistics. In addition, there were some cases estimating the discrete probability distribution model as the underlying distribution for continuous variables, such as weight. To find the cause of abnormal simulations, we applied two MCTools used for all reports and described the improper usage routes of MCTools. Conclusions: For transparent and realistic exposure assessment, it is necessary to 1) establish standardized guidelines for the proper use of the two statistical approaches, including notes by MCTool and 2) consider the development of a new software tool with proper configurations and features specialized for risk assessment. Such guidelines and software will make exposure assessment more user-friendly, consistent, and rapid in the future.

A Systems Engineering Approach to Multi-Physics Analysis of CEA Ejection Accident

  • Sebastian Grzegorz Dzien;Aya Diab
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.19 no.2
    • /
    • pp.46-58
    • /
    • 2023
  • Deterministic safety analysis is a crucial part of safety assessment, particularly when it comes to demonstrating the safety of nuclear power plant designs. The traditional approach to deterministic safety analysis models is to model the nuclear core using point kinetics. However, this simplified approach does not fully reflect the real core behavior with proper moderator and fuel reactivity feedbacks during the transient. The use of Multi-Physics approach allows more precise simulation reflecting the inherent three-dimensionality (3D) of the problem by representing the detailed 3D core, with instantaneous updates of feedback mechanisms due to changes of important reactivity parameters like fuel temperature coefficient (FTC) and moderator temperature coefficient (MTC). This paper addresses a CEA ejection accident at hot full power (HFP), in which the underlying strong and un-symmetric feedback between thermal-hydraulics and reactor kinetics exist. For this purpose, a multi-physics analysis tool has been selected with the nodal kinetics code, 3DKIN, implicitly coupled to the thermal-hydraulic code, RELAP5, for real-time communication and data exchange. This coupled approach enables high fidelity three-dimensional simulation and is therefore especially relevant to reactivity initiated accident (RIA) scenarios and power distribution anomalies with strong feedback mechanisms and/or un-symmetrical characteristics as in the CEA ejection accident. The Systems Engineering approach is employed to provide guidance in developing the work in a systematic and efficient fashion.

Preliminary Post-closure Safety Assessment of Disposal System for Disused Sealed Radioactive Source (폐밀봉선원 처분시스템 예비 폐쇄후 안전성평가)

  • Lee, Seunghee;Kim, Juyoul
    • Journal of Soil and Groundwater Environment
    • /
    • v.22 no.4
    • /
    • pp.33-48
    • /
    • 2017
  • An optimum disposal plan of disused sealed radioactive sources (DSRSs) should be established to ensure long-term disposal safety at the low- and intermediate-level radioactive waste (LILW) disposal facility in Gyeongju. In this study, an optimum disposal system was suggested and preliminary post-closure safety assessment was performed. The DSRSs disposal system was composed of a rock cavern and near surface disposal facilities at the Gyeongju LILW disposal facility. The assessment was conducted using GoldSim program, and probabilistic assessment and sensitivity analysis were implemented to evaluate the uncertainties in the input parameters of natural barriers. Deterministic and probabilistic calculations indicated that the maximum dose was below the regulatory limits ($0.1mSvyr^{-1}$ for the normal scenario, $1mSvyr^{-1}$ for the well scenario). It was concluded that the DSRSs disposal system would maintain environmental safety over a long-time. Moreover, the partition coefficient of Np in host rock, Darcy velocity in host rock, and density of the host rock were the most sensitive parameters in predicting exposure dose in the safety assessment.

Decision Making of Seismic Performance Management Using Seismic Risk Assessment (지진위험도평가 방법을 이용한 내진성능관리 의사결정)

  • Kim, Dong Joo;Choi, Ji Hye;Kim, Byeong Hwa
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.23 no.6
    • /
    • pp.329-339
    • /
    • 2019
  • The strategy for the management of earthquakes is shifting from post recovery to prevention; therefore, seismic performance management requires quantitative predictions of damage and the establishment of strategies for initial responses to earthquakes. Currently, seismic performance evaluation for seismic management in Korea consists of two stages: preliminary evaluation and detailed evaluation. Also, the priority of seismic performance management is determined in accordance with the preliminary evaluation. As a deterministic method, preliminary evaluation quantifies the physical condition and socio-economic importance of a facility by various predetermined indices, and the priority is decided by the relative value of the indices; however, with the deterministic method it is difficult to consider any uncertainty related to the return-year, epicenter, and propagation of seismic energy. Also this method cannot support tasks such as quantitative socio-economic damage and the provision of data for initial responses to earthquakes. Moreover, indirect damage is often greater than direct damage; therefore, a method to quantify damage is needed to enhance accuracy. In this paper, a Seismic Risk Assessment is used to quantify the cost of damage of road facilities in Pohang city and to support decision making.

Monitoring of Neonicotinoid Pesticide Residues in Fruit Vegetable and Human Exposure Assessment (과채류 중 Neonicotinoid계 농약의 모니터링 및 인체노출평가)

  • Park, Byung-Jun;Son, Kyung-Ae;Paik, Min-Kyoung;Kim, Jin-Bae;Kwon, Hye-Young;Hong, Su-Myeong;Im, Geon-Jae;Hong, Moo-Ki
    • The Korean Journal of Pesticide Science
    • /
    • v.14 no.2
    • /
    • pp.104-109
    • /
    • 2010
  • We investigated five neonicotinoid pesticide residues (acetamiprid, clothianidin, imidacloprid, thiacloprid, thiamethoxam) in fruit vegetables and estimated the exposure of neonicotinoid pesticide residue through fruit vegetable consumption using a deterministic approach. Two hundred forty samples of eight fruit vegetables cultivated in Korea were analyzed for their pesticide residue contents. Acetamiprid had the highest detection frequency and the highest residue level in pepper. However, all pesticide levels detected didn't exceed national MRLs. The results using a deterministic approach showed that for chronic and acute study of all neonicotinoid pesticide residues, the exposure was about 50 times lower than toxicological endpoint values. It is necessary to understand that the exposure assessment in this study using a probabilistic approach should be regarded as a important knowledge in the decision-making process.

THE DEVELOPMENT OF A SAFETY ASSESSMENT APPROACH AND ITS IMPLICATION ON THE ADVANCED NUCLEAR FUEL CYCLE

  • Hwang, Yong-Soo;Kang, Chul-Hyung
    • Nuclear Engineering and Technology
    • /
    • v.42 no.1
    • /
    • pp.37-46
    • /
    • 2010
  • The development of advanced nuclear fuel cycle(ANFC) technology is essential to meet the national mission for energy independence via a nuclear option in Korea. The action target is to develop environmentally friendly, cost-effective measures to reduce the burden of long term disposal. The proper scenarios regarding potential radionuclide release from a repository have been developed in this study based on the advanced korean Reference Disposal System(A-KRS). To predict safety for the various scenarios, a new assessment code based on the GoldSim software has also been developed. Deterministic analysis indicates an environmental benefit from the ANFC as long as the solid waster from the ANFC act as a proper barrier.

Reliability analysis-based safety factor for stability of footings on frictional soils

  • Parviz Tafazzoli Moghaddam;Pezhman Fazeli Dehkordi;Mahmoud Ghazavi
    • Geomechanics and Engineering
    • /
    • v.33 no.6
    • /
    • pp.543-552
    • /
    • 2023
  • The design of foundations based on a deterministic approach may not be safe and reliable occasionally, since soils sometimes show considerable spatial variability, and thus, significant uncertainties in turn affect the estimation of footing bearing capacity. The design of footing on cohesionless stratums on the basis of reliability analysis has not received much attention. This paper performs two-dimensional random finite difference analyses of shallow strip footings on a spatially variable frictional soil considering correlation structure. Friction angle (ϕ) is considered as a log-normally distributed random variable and Monte Carlo Simulation is then performed to determine the statistical response based on the random fields. A new approach reliability-based safety factor is defined based on various reliability levels by considering the coefficient of variation of ϕ and correlation length in both the horizontal and vertical directions. The comparison of the probabilistic safety factor and the conventional one illustrates the limitations of the deterministic safety factor and provides insight into how the heterogeneity of soils properties affects the required safety factor. Results show that the conventional safety factor of 3 can be conservative in some cases, especially for soil with low values of mean ϕ and COVϕ.