• Title/Summary/Keyword: drum schedule

Search Result 3, Processing Time 0.022 seconds

Implementation of Automation Program and Efficient Cable Drum Schedule using Dynamic Programming Algorithm (동적 계획 알고리즘을 이용한 효과적인 케이블 드럼 스케줄 및 자동화 프로그램 구현)

  • Park, Ki-Hong;Lee, Yang Sun
    • Journal of Digital Contents Society
    • /
    • v.17 no.4
    • /
    • pp.257-263
    • /
    • 2016
  • Cable drum schedule is the final step for the electrical equipment of the power plant, and is assigned cables to efficiently cable drum. In this paper, we have implemented an automated program which cables are scheduled in accordance with the capacity of the cable drum for each cable code. Proposed cable drum schedule was applied to the dynamic programming algorithm to effectively solve the optimization problem, and the implemented program is conducted so as to verify the proposed model. The experiment results show that implemented program eliminates the errors that can occur existing method, so we were able to reduce the design time of cable drum schedule. Cables for the electrical equipment of the power plant is designed to at least 2 million units or more. Thus the automation program to provide applies, it is considered that the design time of the cable drum schedule can be greatly reduced without serious error.

Implementation of Cable Drum Scheduling Algorithm for Productivity Enhancement of Power Plant Electrical Installations (발전소 전기설비의 생산성 향상을 위한 케이블 드럼 스케줄링 알고리즘 구현)

  • Lee, Yang-Sun;Park, Ki-Hong;Choi, Hyo-Beom;Oh, Ji-Hyun
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.10a
    • /
    • pp.770-771
    • /
    • 2015
  • In this paper, we proposed and implemented the automation of cable drum scheduling which is required a considerable construction cost for electrical equipment in power plant. Implemented cable drum scheduling can be reduced the calculation time of cable drum scheduling, and it is possible to minimize the consuming time of cable drum scheduling than conventional methods. Some experiments are conducted to verify the proposed method, and as a result, the automation of cable drum scheduling is well performed, enabling cables can be optimized and scheduled to fit the drum capacity with productivity enhancement of electrical installations.

  • PDF

A Detailed Design for DBR Based APS System (DBR 기반의 APS 시스템 상세 설계)

  • Choi, Jeong-Gil;Kim, Su-Jin;Ju, Jeong-Min;Chung, Sun-Wha;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.14 no.4
    • /
    • pp.348-355
    • /
    • 2001
  • This paper suggests a detailed design of APS(Advanced Planning & Scheduling) system using the DBR (Drum-Buffer-Rope) which is a finite capacity scheduling logic of TOC(Theory of Constraints). Our design is composed of four modules; Network, Buffer, Drum and Subordination. The Network module defines the Product Network which is built from BOM and routings. The Buffer module inserts the Buffers into the Product Network. The Drum module describes detail procedures to create Drum Schedule on the CCR(Capacity Constraint Resource). The Subordination module synchronizes all non-constraints to the constraints by determining the length of Rope. This design documented by ARIS.

  • PDF