도시 물순환 건전화를 위한 빗물관리 계획요소 평가 (Assessment of Criteria for selecting Rainwater Management Strategies)

  • 이태구;한영해
    • KIEAE Journal
    • /
    • 제10권4호
    • /
    • pp.9-17
    • /
    • 2010
  • The purpose of this study is to draw out objective bases for selecting various applicable facilities in case of the establishment of rainwater management strategies. To do so, sixteen facilities were selected from decentralized rainwater management systems that induce rainwater infiltration and detention as well as centralized end-of-pipe type infiltration and detention facilities in local areas. With these facilities, it attempted to evaluate them in terms of sustainability, pollutant elimination, flood control capacity and costs and subsequently analyzed correlations between each characteristic. The outcomes of the analysis were as follows: First was the analysis of characteristics between decentralized rainwater management systems and end-of-pipe rainwater management systems. From the decentralized rainwater management systems, the mulden-rigolen system and grass swale at street level had the highest in the total of the four items while the totals of the underground detention tank and temporary detention site were highest in end-of-pipe rainwater management systems. After analyzing the correlation between different types of facilities and each variable, it can be said that decentralized rainwater management systems have a higher correlation than end-of-pipe rainwater management systems in terms of sustainability whereas the latter are better in flood control capacity than the former. Second, the analysis of correlation in variables of each facility is as follows: first, there is a negative correlation between sustainability value and flood control capacity value; and there is a positive correlation between flood control capability and pollutants elimination. In addition, it revealed that the higher the flood control and pollutant elimination capability the higher the facility costs. Based on these assessments, it is possible to use them as objective selection criteria for facility application in case of site development project or complex plan.

컴퓨터 비젼을 이용한 파이프 불량 검사시스템 개발 (Development of Pipe Fault Inspection System using Computer Vision)

  • 박찬호;양순용;안경관;오현옥;이병룡
    • 제어로봇시스템학회논문지
    • /
    • 제9권10호
    • /
    • pp.822-831
    • /
    • 2003
  • A computer-vision based pipe-inspection algorithm is developed. The algorithm uses the modified Hough transformation and a line-scanning approach to identify the edge line and the radius of the pipe image, from which the eccentricity and dimension of the pipe-end is calculated. Line and circle detection was performed using Laplace operator with input image, which are acquired from the front and side cameras. In order to minimize the memory usage and the processing time, a clustering method with the modified Hough transformation is introduced for line detection. The dimension of inner and outer radius of pipe is calculated by the proposed line-scanning method. The method scans several lines along the X and Y axes, calculating the eccentricity of inner and outer circle, by which pipes with wrong end-shape can be classified and removed.

Vibration reduction of a pipe conveying fluid using the semi-active electromagnetic damper

  • Kavianipour, Omid
    • Coupled systems mechanics
    • /
    • 제6권2호
    • /
    • pp.175-187
    • /
    • 2017
  • This paper deals with a uniform cantilever Euler-Bernoulli beam subjected to follower and transversal force at its free end as a model for a pipe conveying fluid under electromagnetic damper force. The electromagnetic damper is composed of a permanent-magnet DC motor, a ball screw and a nut. The main objective of the current work is to reduce the pipe vibration resulting from the fluid velocity and allow it to transform into electric energy. To pursue this goal, the stability and vibration of the beam model was studied using Ritz and Newmark methods. It was observed that increasing the fluid velocity results in a decrease in the motion of the free end of the pipe. The results of simulation showed that the designed semiactive electromagnetic damper controlled by on-off damping control strategy decreased the vibration amplitude of the pipe about 5.9% and regenerated energy nearly 1.9 (mJ/s). It was also revealed that the designed semi-active electromagnetic damper has better performance and more energy regeneration than the passive electromagnetic damper.

주물 파이프 Gasket을 통한 유기화학물질의 이동 (Permeation of Organic Chemicals through Gasketed Cast Iron Pipe)

  • Yong-Chan Seo;Nack-Joo Kim
    • 한국환경과학회지
    • /
    • 제8권1호
    • /
    • pp.45-50
    • /
    • 1999
  • 깨끗한 모래로 채워진 4개의 16갤론 크기 드럼통에 주물 파이프가 설치되었고 각 파이프에는 3개의 styrene butadiene rubber gasket(1개의 joint와 2개의 end caps)을 장치하였다. 각 파이프는 상수로 채워 내부의 압력을 약 40psi로 유지하였다. 첫 번째 드럼은 일정량의 휘발유로, 두 번째 드럼은 pyrene과 naphthalene을 포함한 휘발유로, 세 번째 드럼은 toluene으로 채워졌고, 네 번째 드럼은 대조군으로 사용되었다. 외부 오염물질의 이동에 의한 오염을 조사하기 위해 일정 간격으로 파이프 내의 물을 약 2년 간 조사하였다. 오염 물질이 투입된 3개의 드럼에서 약 100일 후부터 유기 오염 물질이 검출되었고 외부에 채워진 유기물이 고갈될 때까지 계속적으로 증가하는 추세를 보였다. 이미 오염된 물을 깨끗한 물로 청소한 후에도 오염된 gasket에 남아있는 유기물질이 유출되어 파이프 내의 물이 쉽게 오염되었으며 약 10일 후에는 청소 이전의 농도로 검출되어 gasket에 의한 오염이 오래 동안 지속되는 것으로 나타났다.

  • PDF

수격 현상에 의한 파이프의 과도진동응답 해석 (Analysis of a transient vibration response caused by Water Hammer in a pipe-line system)

  • 조성문;서영수;정의봉;정호경
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2004년도 춘계학술대회논문집
    • /
    • pp.119-124
    • /
    • 2004
  • A water hammer mostly comes out when a valve fixed at the downstream end of the pipe-line system is rapidly closed or opened. A simple phenomenon of water hammer is often caused around us, and this phenomenon imperils the pipe systems occasionally. In this paper, we confirmed the phenomenon of water hammer by an experiment and forecasted a change of pressure in the pipe-line system by a numerical method. Also a vibration response, which is caused by water hammer, of the pipe-line system confirmed by an experiment and analyzed by a numerical method.

  • PDF

High-temperature ultrasonic thickness monitoring for pipe thinning in a flow-accelerated corrosion proof test facility

  • Cheong, Yong-Moo;Kim, Kyung-Mo;Kim, Dong-Jin
    • Nuclear Engineering and Technology
    • /
    • 제49권7호
    • /
    • pp.1463-1471
    • /
    • 2017
  • In order to monitor the pipe thinning caused by flow-accelerated corrosion (FAC) that occurs in coolant piping systems, a shear horizontal ultrasonic pitch-catch waveguide technique was developed for accurate pipe wall thickness monitoring. A clamping device for dry coupling contact between the end of the waveguide and pipe surface was designed and fabricated. A computer program for multi-channel on-line monitoring of the pipe thickness at high temperature was also developed. Both a four-channel buffer rod pulse-echo type and a shear horizontal ultrasonic waveguide type for high-temperature thickness monitoring system were successfully installed to the test section of the FAC proof test facility. The overall measurement error can be estimated as ${\pm}10{\mu}m$ during a cycle from room temperature to $200^{\circ}C$.

Methods and Systems for High-temperature Strain Measurement of the Main Steam Pipe of a Boiler of a Power Plant While in Service

  • Guang, Chen;Qibo, Feng;Keqin, Ding
    • Journal of the Optical Society of Korea
    • /
    • 제20권6호
    • /
    • pp.770-777
    • /
    • 2016
  • It has been a challenge for researchers to accurately measure high temperature creep strain online without damaging the mechanical properties of the pipe surface. To this end, a noncontact method for measuring high temperature strain of a main steam pipe based on digital image correlation was proposed, and a system for monitoring of high temperature strain was designed and developed. Wavelet thresholding was used for denoising measurement data. The sub-pixel displacement search algorithm with curved surface fitting was improved to increase measurement accuracy. A field test was carried out to investigate the designed monitoring system of high temperature strain. The measuring error was less than $0.4ppm/^{\circ}C$, which meets actual measurement requirements for engineering. Our findings provide a new way to monitor creep damage of the main steam pipe of a boiler of an ultra-supercritical power plant in service.

Development of Pipe-Inspection System Using Computer Vision

  • Park, Chan-ho;Lee, Byungryoung;Soonyoung Yang;Kyungkwan Ahn;Hyunog Oh
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2002년도 ICCAS
    • /
    • pp.99.1-99
    • /
    • 2002
  • In this paper, a computer-vision based pipe-inspection algorithm is developed. The algorithm uses the modified Hough transformation and a line-scanning approach to identify the edge line and radius of the pipe image, from which the eccentricity and dimension of the pipe-end is calculated. Line and circle detection was performed using Laplacian operator with input image which are acquired from the front and side cameras. In order to minimize the memory usage and the processing time, a clustering method with the modified Hough transformation for line detection. The dimension of inner and outer radius of pipe is calculated by proposed line-scanning method. The method scans several lines along t...

  • PDF

ON-POWER DETECTION OF PIPE WALL-THINNED DEFECTS USING IR THERMOGRAPHY IN NPPS

  • Kim, Ju Hyun;Yoo, Kwae Hwan;Na, Man Gyun;Kim, Jin Weon;Kim, Kyeong Suk
    • Nuclear Engineering and Technology
    • /
    • 제46권2호
    • /
    • pp.225-234
    • /
    • 2014
  • Wall-thinned defects caused by accelerated corrosion due to fluid flow in the inner pipe appear in many structures of the secondary systems in nuclear power plants (NPPs) and are a major factor in degrading the integrity of pipes. Wall-thinned defects need to be managed not only when the NPP is under maintenance but also when the NPP is in normal operation. To this end, a test technique was developed in this study to detect such wall-thinned defects based on the temperature difference on the surface of a hot pipe using infrared (IR) thermography and a cooling device. Finite element analysis (FEA) was conducted to examine the tendency and experimental conditions for the cooling experiment. Based on the FEA results, the equipment was configured before the cooling experiment was conducted. The IR camera was then used to detect defects in the inner pipe of the pipe specimen that had artificially induced defects. The IR thermography developed in this study is expected to help resolve the issues related to the limitations of non-destructive inspection techniques that are currently conducted for NPP secondary systems and is expected to be very useful on the NPPs site.

Determination of structural performance of 3D steel pipe rack suspended scaffolding systems

  • Arslan, Guray;Sevim, Baris;Bekiroglu, Serkan
    • Structural Engineering and Mechanics
    • /
    • 제64권5호
    • /
    • pp.671-681
    • /
    • 2017
  • This study investigates the structural performance of 3D steel pipe rack suspended scaffolding systems. For the purpose, a standard full scale 3D steel pipe rack suspended scaffolding system considering two frames, two plane trusses, purlins and wooden floor is constructed in the laboratory. A developed load transmission system was placed in these experimental systems to distribute single loads to the center of a specific area in a step-by-step manner using a load jack. After each load increment, the displacements are measured by means of linear variable differential transducers placed in several critical points of the system. The tests are repeated for five different system conditions to determine the structural performance. The means of system conditions is the numbers of the tie bars which are used to connect plane trusses under level. Finite elements models of the 3D steel pipe rack suspended scaffolding systems considering different systems conditions are constituted using SAP2000 software to support the experimental tests and to use the models in future studies. Each of models including load transmission platform is analyzed under a single loading and the displacements are obtained. In addition, to calibrate the numerical models some uncertain parameters such as elasticity modulus of wooden floor and connection rigidity of purlins to plane trusses are assessed experimentally. The results of this work demonstrate that when increasing numbers of tie bars the displacement values are decreased. Also the results obtained from developed numerical models have harmony with those of experimental. In addition, the scaffolding system with two tie bars at the beginning and at the end of the plane truss has the optimum structural performance compared the results obtained for other scaffolding system conditions.