• Title/Summary/Keyword: erection

Search Result 331, Processing Time 0.03 seconds

Comparative Study of the Papaverine-induced Artificial Erection and the Nocturnal Penile Erection (Papaverine 주사에 의한 인위적 음경발기와 야간의 수면중 음경발기의 비교관찰)

  • Choi, I.G.;Oh, M.M.;Kim, S.C.
    • Clinical and Experimental Reproductive Medicine
    • /
    • v.16 no.1
    • /
    • pp.107-112
    • /
    • 1989
  • In order to compare the nocturnal penile erection and the erection induced by intracavernosal injection of papaverine, digital palpation of penis, erectile angle, and the rigigram using $Rigiscan^{(R)}$ were evaluated in 38 erectile dysfunction patients(13 psychogenic, 18 vasculogenic, 1 neurogenic, 3 vasculo-neurcgenic, and 3 undetermined). The following results were obtained. 1. Among the 32 patients of the nocturnal penile erection > 40% on rigigram, only 15 patients(46.9 %) demonstrated rigidity > 4+, a sufficient rigidity for sexual intercourse, on papaverine test. 2. The maximal degree of rigidity was also measured by the erectile angle of the penis. Among the 32 patients of nocturnal penile erection > 40% on rigigram, 23 patients(71.9%) had an angle > $45^{\circ}$. 3. Sixteen patients(42.1%) demonstrated similar increase in the maximal circumferential expansion of the distal portion of the penis on nocturnal penile erection and papaverine-induced erection. Nineteen patients showed larger circumferential expansion on nocturnal penile erection than on papaverine-induced erection. Fifteen patients showed similar circumferential increase of the basal portion of the penis on nocturnal penile erection and artificial erection, while 12 patients(31.6 %) showed larger circumferential increase on artificial erection than on nocturnal penile erection. 4. In the 15 patients of nocturnal penile erection > 40 % on rigigram and > 4+ on papaverine test, the duration of maintenance of the maximum erection on nocturnal penile erection and artificial erection proved to be not proportional. Thus, the arthficial erection induced by papaverine and the nocturnal penile erection can not to be said to be of same in nature and therefore, in order to make more definite diagnosis, both tests should be done and compared.

  • PDF

Heuristic Algorithms for Resource Leveling in Pre-Erection Scheduling and Erection Scheduling of Shipbuilding (조선 선행탑재 및 탑재 일정계획에서의 부하평준화를 위한 발견적 기법)

  • Woo, Sang-Bok;Ryu, Hyung-Gon;Hahn, Hyung-Sang
    • IE interfaces
    • /
    • v.16 no.3
    • /
    • pp.332-343
    • /
    • 2003
  • This paper deals with pre-erection scheduling and erection scheduling in shipbuilding. Among shipbuilding scheduling, the ship erection scheduling in a dock is one of the most important since the dock is the most critical resource in a shipyard. However, it is more reasonable to consider pre-erection scheduling and erection scheduling as unified because they compete with the common constrained resources such as labor, crane, space, and so on. It is very hard to consider two scheduling problems simultaneously, and hence, we approach them sequentially. At first, we propose space resource leveling heuristics in pre-erection scheduling given erection date. And then, considering the manpower resource determined by pre-erection scheduling, we also propose manpower resource leveling heuristics in erection scheduling. Various experimental results with real world data show that the proposed heuristics have good performance in terms of scheduling quality and time.

Spatial Scheduling in Shipbuilding Industry

  • Duck Young Yoon;Varghese Ranjan;Koo Chung Kon
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2004.05a
    • /
    • pp.106-110
    • /
    • 2004
  • In any large heavy industry like that of ship building, there exist a lot of complications for the arrangement of building blocks optimally for the minimal space consumption. The major problem arises at yard because of laxity in space for arranging the building blocks of ship under construction. A standardized erection sequence diagram is generally available to provide the prioritised erection sequence. This erection sequence diagram serves as the frame work. In order to make a timely erection of the blocks a post plan has to be developed so that the blocks lie in the nearest possible vicinity of the material handling devices while keeping the priority of erection. Therefore, the blocks are arranged in the pre-erection area. This kind of readiness of blocks leads to a very complex problem of space. This arises due to the least available space leading to an urgent need of an availability of intelligent spatial schedule without compromising the rate of production. There exists two critical problems ahead namely, the spatial occupation layout of pre-erection area and the emptying pattern in the spatial vicinity. The block shape is assumed be rectangular. The related input data's are the dates of erection (earliest as well as the latest), geometrical parameters of block available on pre-erection area, slack time and the like.

  • PDF

Flutter stability of a long-span suspension bridge during erection

  • Han, Yan;Liu, Shuqian;Cai, C.S.;Li, Chunguang
    • Wind and Structures
    • /
    • v.21 no.1
    • /
    • pp.41-61
    • /
    • 2015
  • The flutter stability of long-span suspension bridges during erection can be more problematic and more susceptible to be influenced by many factors than in the final state. As described in this paper, numerical flutter stability analyses were performed for the construction process of Zhongdu Bridge over Yangtze River using the commercial FE package ANSYS. The effect of the initial wind attack angle, the sequence of deck erection, the stiffness reduction of stiffening girders, the structural damping, and the cross cables are discussed in detail. It was found that the non-symmetrical sequence of deck erection was confirmed to be aerodynamically favourable for the deck erection of long-span suspension bridges and the best erection sequence should be investigated in the design phase. While the initial wind attack angle of $-3^{\circ}$ is advantageous for the aerodynamic stability, $+3^{\circ}$ is disadvantageous compared with the initial wind attack angle of $0^{\circ}$ during the deck erection. The stiffness reduction of the stiffening girders has a slight effect on the flutter wind speed of the suspension bridge during erection, but structural damping has a great impact on it, especially for the early erection stages.

A Study on the Improvement of Erection Bar Detailing in Domestic Building Construction (국내 건축물 조립용 철근 배근현황 및 개선방안에 관한 연구)

  • Jung, Hyeon-Ok;Cho, Hun-Hee;Park, U-Yeol
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.2
    • /
    • pp.39-46
    • /
    • 2009
  • The erection bar is defined as the assistant bar used to fix the position of the reinforcing steel as the reinforcing steel is placed on site. As the erection bar do not bear the structural load and is not showed in the structural drawings, it is not managed importantly. But as chair bars in mat footing is used in large quantities to support the upper main bars, the detailing standards need to be suggested. and some erection bar is placed by experience of the fabricator and placer. Therefore, in this study, a survey about the erection bars was conducted to the reinforcement detailer, the fabricator and placer of domestic construction industry. 11 placing drawings is analyzed to find out the problems of detailing and the quantities of the erection bars. According to the analysis of the survey, the erection bar details in placing drawings were not standardized, and some erection bars are omitted in placing drawings. The improvement in the erection bar detailing was sought by analyzing the results of the survey.

Load Leveling of Block Erection Network Using Diminution of Maximum Load Based on Constraint Satisfaction Technique (제약만족기법 기반의 최대부하감소를 통한 탑재 네크워크의 부하평준화)

  • Ryu, Ji-Sung;Kim, Hong-Tae;Park, Jin-H.;Lee, Byung-No;Shin, Jong-Gyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.41 no.5
    • /
    • pp.55-62
    • /
    • 2004
  • The logistics of entire shipbuilding process are integrated during the block erection process and the schedules for the erection process are made prior to. the schedules of any other processes. Therefore, efficient scheduling of the block erection process are one of most important issues in shipbuilding. There are only a few studies published regarding block erection scheduling methods because of its complexity and variability. This paper proposes an algorithm for diminution of maximum load based on constraint satisfaction technique. it is developed primarily for the efficiency in load leveling and applicability to the actual block erection process. The proposed algorithm is applied to actual block erection process and the results shows improvements in load leveling. It can also be used for the scheduling of fabrication, sub-assembly, and assembly to improve load leveling.

Prototype of Block Tracing System for Pre-Erection Area using PDA and GPS (PDA 및 GPS를 이용한 옥외 작업장 블록 위치 추적 시스템 개발)

  • Shin, Jong-Gye;Lee, Jang-Hyun
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.43 no.1 s.145
    • /
    • pp.87-95
    • /
    • 2006
  • There are hundreds of ship blocks which are under the block assembly, painting, and outfitting assembly works in the pre-erection shops of shipyard. Generally, each block is planned to be processed in a pre-erection shop according to the block type by the long-term production-scheduling before six months. However, many blocks can't be processed in the planned time and the planned shop since the before and after block-processing changes or delays the planned sequential works in pre-erection shops. Therefore, it is essential to monitor the current location of each block and work in process to cope with the changed situation of pre-erection shops. Present study integrates PDA, GPS, and CDMA not only to chase the location of each block but also to exchange the pre-erection work order and the work report between the production-scheduling server and the production managers in the pre-erection shops. This study shows a prototype for the block tracing and process monitoring in the pre-erection shops.

Generation of Erection Sequence in Shipbuilding Process Planning (조선 공정계획에서 탑재 순서 생성)

  • Hong, Yoon-Gee;Jung, Eun-Kyung;Jun, Jin;Kim, Se-Young
    • IE interfaces
    • /
    • v.10 no.1
    • /
    • pp.189-207
    • /
    • 1997
  • This paper explains a way of describing the erection sequence using the connecting relationship among blocks of a hull in shipbuilding industry. The information of the adjacent blocks such as upper, lower, right, left, front, rear, and their erection status, etd., is defined and the proper use of this allows us to determine one of the possible erection sequences. The methodology suggested also includes some useful benefits of avoiding insert blocks or maintaining stability in erection process. Further, an algorithm for generating the initial erection network is shown and this network may be a basis for designing daily erection scheduling. Some examples illustrate the procedure developed in this study and the results support the model's fidelity.

  • PDF

Case Study of Precast Concrete Erection Work of the Heavy-Loaded Long Span Structure (초대형 건축물의 PC부재 양중작업 사례연구)

  • Cho, Wonhyun;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.58-59
    • /
    • 2016
  • Along with the logistics development, heavy-loaded warehouses and sales facilities tend to be bigger and designed as a PC structures. PC erection work of heavy-loaded structures is influenced by various factors, including the required construction duration, site and surrounding situations, safety, PC member procurement, equipment rental cost, which ultimately impact the construction cost. It requires creative efforts and a lot of time when preparing an erection plan in consideration of these factors, and the plan prepared has a great influence on safety as well as the construction duration and cost. However, many engineers do not have enough experiences on PC erection work of heavy-loaded, long span structures, making it difficult for them to set erection plans and establish simulations. The study's results will provide a knowledge to obtain a solution for engineers to establish PC erection plans of heavy-loaded, long span structures.

  • PDF

The Erection Method of Starter Segment for Cable Stayed Bridge using Asymmetric System and Cable (케이블과 비대칭 구조를 이용한 사장교 주두부 시공 방법)

  • Cho, Seo-Kyung;Yoon, Tae-Seob;Jeong, Seung-Wook;Lee, Jea-Chan;Eo, Jun
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.1031-1038
    • /
    • 2002
  • In this paper the erection method of the Seohae Bridge starter is presented. The erection method of starter for cable stayed bridge was changed from conventional bracket supported erection to heavy lifting supported directly by stays. There was the need to reduce the erection time drastically. The cost saving was obtained as a bonus.

  • PDF