• Title/Summary/Keyword: feasibility analysis

Search Result 3,623, Processing Time 0.047 seconds

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안 분석 연구)

  • Kim, Gyeong-Su;Min, Seong-Gi;Kim, Cheol-Hwan
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

DEVELOPMENT OF FEASIBILITY ANALYSIS MODEL FOR DEVELOPER-REQUESTED HOUSING PROJECTS

  • Young-Ki Huh;Bon-Gang Hwang;Joong-Seok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.847-855
    • /
    • 2009
  • While many studies on feasibility analysis for housing projects have been released, the main focus was on economic feasibility and factors related to developers were not clearly identified enough to be used in practice. In order to establish a feasibility analysis model for apartment development projects requested by developers in Korea, 31 driving factors behind projects' success were identified under seven different categories. Criterions of the each factor were also developed, and weight of each factor was assigned by applying the Analytical Hierarchy Process(AHP). Finally, based on the Monte Carlo simulation, the feasibility analysis model was established, providing probability distribution of project's grade. The model was applied to 12 housing projects to verify its reliability, and found that the model properly filtered projects that are unlikely to be profitable, indicating reasonable reliability of the model. The model can be a useful tool for contractors, especially with less experience in analyzing project development feasibility.

  • PDF

A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

A Study of Feasibility Study on Construction a Public Library (공공도서관 건립 타당성 조사에 관한 연구)

  • Lee, Sang-Bok
    • Journal of Korean Library and Information Science Society
    • /
    • v.35 no.4
    • /
    • pp.491-516
    • /
    • 2004
  • The purpose of this study is to analyze the approach of economic feasibility and political and technical feasibility in the construction of a new public library. The results show that the cost-benefit analysis using in economic feasibility have the problems of benefit counting and discount rate, and also political and technical feasibility have the problems of wrong use in the rationalization of construction project. The result of this study is expected to be useful in preparing the feasibility study.

  • PDF

A Model Feasibility Analysis of Commerce Building (상업건축물의 사업타당성 분석 모형 구축)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • KIEAE Journal
    • /
    • v.7 no.3
    • /
    • pp.71-79
    • /
    • 2007
  • The starting point of successful building production process is the feasibility study of the project. If the feasibility study is poor which is affected in direct production processes such as designing and engineering, it incurs a great unrecoverable loss to the company. The government institutionalized the feasibility study for projects that budgets over 50billion won in an effort to ensure competitiveness of the construction industry after IMF; however, the system and effort to created systematic studies or guidance preparation for private construction development projects are lacking in great deal. Therefore, the objective of this study is to establish the analysis factors of feasibility study and evaluation standard by systematic analysis in consideration of the changes of various variables and mutual relationships using system dynamics technique for office buildings among commercial buildings.

A Study on the Economic Feasibility Analysis of Public Library Construction - Focused on the Case of Geumsaem Library Construction - (공공도서관 건립의 경제적 타당성 분석에 관한 연구 - 금샘도서관 건립 사례를 중심으로 -)

  • Kang, Hee-Kyung;Lee, Yong-Jae
    • Journal of Korean Library and Information Science Society
    • /
    • v.48 no.2
    • /
    • pp.99-119
    • /
    • 2017
  • As a part of feasibility study of constructing Geumsaem library, the purpose of this study is to examine the result of economic feasibility analysis on constructing the library. In order to achieve the purpose, we evaluated policy relevance, investigated people's demand for constructing the library, and examined the result of economic feasibility analysis. As the tools of economical efficiency analysis, we used the techniques like cost-benefit ratio, net present value and internal rate of return to analyse the economic feasibility, and we estimated the amount of benefit by contingent valuation method. As the result of this study, cost-benefit ratio for constructing Geumsaem library was turned out as 1.28, and we could get an assessment of positive economic feasibility about constructing the library.

A Study of the Situation in the Feasibility Analysis for Public Rental Housing (공공임대주택 개발사업의 사업성분석 현황 연구)

  • Lee Sang-Gon;Lee Jae-Young;Lee Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.222-225
    • /
    • 2003
  • The development project of a public rental housing require the accurate and systemical feasibility analysis for the successful performance owing to the long project duration. But, the item and procedure of the existing feasibility analysis are not standardized and the correlation among each of items is not clear. Therefore, analysis has much difficulty. The purpose of this study is to present the basic data for the modeling of the feasibility analysis system, through the domestic public enterprise-oriented survey and interview and collection of the report about the feasibility analysis.

  • PDF

A Study on Feasibility Analysis and Alternatives for Infrared Detector Development (적외선 검출기 개발가능성 및 대안분석 연구)

  • Min, Sung Ki;Kim, Chul Whan;Kim, Kyoung Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.1 no.1
    • /
    • pp.1-13
    • /
    • 2005
  • The purpose of this paper analyze development feasibility and alternatives for infrared detector development in both technology and cost. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 10 2008 year. We got raw input data from development and technical expert, and then analyze cost and technology for development feasibility, and alternatives study. Technology level is analyzed by TRL(Technology Readiness Level) and AOA(Analysis of Alternatives) is done by development cost estimate. Estimating the development cost, we use SEER-H that is parametric cost estimating tool based on Knowledge Base. This study can help those who are related to the cost and development feasibility analysis of other weapon systems.

  • PDF

Engineering Feasibility of IT and Smart Sensor Technology Applications for the Next Generation High Speed Train (차세대 고속전철에 적용할 IT 및 스마트센서 기술의 타당성 검토에 관한 연구)

  • Chang, Duk-Jin;Kang, Song-Hee;Song, Dahl-Ho
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.547-556
    • /
    • 2009
  • In this paper, we tried to find the engineering feasibility of the component functions of the seven selected application technologies which are going to be installed on the next generation high speed train as the IT and smart sensor application technologies. The component functions of the seven applications, including the "Emergency or reminder notification", were identified and analyzed. In order to justify the feasibility of applications development, effect analysis and sufficiency analysis were performed. In effect analysis, how each function has an effect on safety, convenience, and efficiency of the passengers and attendants was evaluated. In sufficiency analysis, the importance and implementability of each function as a component was evaluated. The feasibility analysis was focused on the technical aspects of the functions. The following work will be the settlement of the final applications that are going to be designed and implemented. This will be done by studying the strategic feasibility in relation to the service or business of the high speed train.

  • PDF

Preliminary Feasibility Study for Water Resources Policy Effect Analysis Direction (수자원분야 예비타당성 조사 정책효과 분석 방향)

  • Seong, Yeonjeong;Choi, Seungan;Kwon, Hyun-Han;Jung, Younghun
    • Journal of Korean Society of Disaster and Security
    • /
    • v.14 no.3
    • /
    • pp.1-16
    • /
    • 2021
  • Recently, large-scale projects are required in the water resources sector considering safety and publicitythe due to uncertainty of securing water resources and changes in the ecological environment by climate change. Among these large-scale projects, the projects that fall under the preliminary feasibility study are determined by comprehensive analysis based on economic analysis, policy analysis, and balanced regional development analysis. However, most of the results of the preliminary feasibility study showed a tendency to depend heavily on economic analysis. For this reason, projects in non-metropolitan areas sometimes fail in the preliminary feasibility study. To supplement this point, the Korea Development Institute revised the standard guidelines for preliminary feasibility studies for water resources sector projects that place a high weight on policy feasibility analysis. Therefore, the objective of this study is to analyze the cases of the preliminary feasibility study conducted previously and to suggest the direction of policy analysis in the preliminary feasibility study for water resources sector projects. For this, we analyze preliminary feasibility studies conducted for 18 years from 2002 to 2019, and suggest direction of policy analysis method using the benefit items not included in the economic analysis.