• Title/Summary/Keyword: ground excavation

Search Result 916, Processing Time 0.039 seconds

Excavation and Building Damage Assessment - Fundamentals (지반굴착과 주변 구조물 손상평가 - 기본개념)

  • 유충식
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.263-270
    • /
    • 2002
  • During deep excavation, changes in the state of stress in the ground mass around the excavation and subsequent ground losses inevitably occur. These changes in the stress and ground losses are reflected on surrounding ground in the form of ground movements, which eventually Impose strains onto nearby structures through translation, rotation, distortion, and possibly damage. A substantial portion of the cost of deep excavations in urban environments is, therefore, devoted to prevent ground movements. Prediction of ground movements and assessment of the risk of damage to adjacent structures has become an essential part of the planning, design, and construction of a deep excavation project in the urban environments. This paper presents excavation-induced ground movement characteristics as well as important issues related to excavation-induced building damage assessment.

  • PDF

Analysis of ground settlement due to circular shaft excavation (원형 수직구 굴착에 따른 발생 지반침하 분석)

  • Moorak Son;Kangryel Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.87-99
    • /
    • 2023
  • Ground excavation inevitably causes ground displacement of adjacent ground, and structures and facilities exposed to ground displacement may suffer various damages. Therefore, in order to minimize the damage and damage to adjacent structures and facilities caused by excavation, ground displacement (settlement and horizontal displacement) in the adjacent ground caused by excavation must first be predicted. There is many ground displacement information induced by general braced cut excavation, but the information is not enough for circular shaft excavation. This study aims to provide information on the estimation of ground settlement caused by circular shaft excavation through the case analysis of circular shafts and comparison with braced cut excavation. From this study, it was found that the use of the settlement criterion of braced cut excavation as the settlement management criterion for circular shaft excavation is a conservative approach in terms of safety. But when considering the economic aspect, it may result in overdesign of the wall and therefore, a more reasonable settlement criterion can be needed for circular shaft excavation.

Building Response to Excavation-Induced Ground Movements and Damage Estimation (굴착유발 지반변위에 의한 인접구조물의 거동 및 손상도 예측)

  • Son, Moo-Rak;Cording, E.J.
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.249-256
    • /
    • 2006
  • New infrastructures and buildings are being constructed increasingly in congested urban areas, and excavation-induced ground movements often cause distortion and damage to adjacent buildings. Protection of adjacent structures occupies a major part of the cost, schedule and third-party impacts of urban development. To limit damage or mitigate their effects on nearby structures, it is highly important to understand the whole mechanism from excavation to building damage, and to estimate building damage reliably before excavation and provide appropriate measures. This paper investigates the effects of excavation-induced ground movements on nearby structures, considering soil-structure interactions for ground and structures, and a building damage criterion, which is based on the state of strain, is proposed. The criterion is compared with other existing damage estimation criteria and a procedure is finally provided for estimating building damage due to excavation-induced ground movements.

  • PDF

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(II) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(II))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.248-259
    • /
    • 2010
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces one example of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. The characteristics of ground deformation and strut axial force change, the measured data obtained during construction process, were analysed, the effects of relatively deeper excavation than the specification on one excavation side and rapid drawdown of ground water level on the other excavation side were deeply investigated from the viewpoint of mutual influences between ground deformations of both excavation sides and strut axial force changes. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

Ground Deformation Analysis of Tunnel Excavation Based on the Ground Characteristic Line Concept (지반특성곡선 개념을 이용한 터널굴착 거동해석)

  • 손준익;정하익
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1992.04a
    • /
    • pp.118-125
    • /
    • 1992
  • The ground deformation due to the tunnel excavation is dependent on various factors such as ground condition, geometry of the tunnel, excavation method, installation of support members, construction condition of each excavation stage, etc. And the distance from the facing effects significantly the stress conditions of the supported and unsupported ground due to the 3-dimensional structural nature of the excavated tunnel. The concept of ground characteristic line has been applied to properly consider the loading condition given by staged tunnel excavation so that the imaginary supporting pressure is applied against the surface of excavated ground. Discussions on the results of the performed finite element analysis were mainly made with respect to the ground settlement, tunnel displacement, earth pressure, stress mobilized in supporting members.

  • PDF

The contiguity ground and structures sinkage analysis of in city excavation (도심지 굴착공사에 따른 인접지반 및 구조물 침하원인 분석)

  • Seong, Joo-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1301-1306
    • /
    • 2009
  • Recently, urban excavations are one of most frequent geotechnical work according to construction of a high rise building and subway. These kind of excavation affect to a adjacent ground or structure and it can trigger various severe accidents. Generally, the ground is closer to the excavation site, the deformation become larger. In this study, special ground settlement case due to adjacent ground excavation is presented and a cause of deformation is examined by various geotechnical exploration, lab-testing and numerical analysis.

  • PDF

Case Studies of Ground Subsidence Risk Ratings (GSRp) Applied to the Excavation Sites (지반함몰 위험등급 분류(GSRp)의 굴착현장 사례 연구)

  • Shin, Sang-Sik;Ihm, Myeong-Hyek;Kim, Hak Joon
    • The Journal of Engineering Geology
    • /
    • v.29 no.3
    • /
    • pp.289-302
    • /
    • 2019
  • As the occurrence of ground subsidence near the excavation site increases recently, studies are being conducted to predict the possibility of ground subsidence prior to excavation. In this study, the ground subsidence risk rating for pre-excavation (GSRp) developed by the previous study was applied to actual excavation sites to verify its applicability. The final results for the evaluation of the ground subsidence risk level for five excavation sites revealed that GSRp scores were calculated between 40 and 79 points and classified mainly into grades II (Good Ground)~III (Fair Ground). In order to verify the evaluation method, the obtained GSRp grades were compared with the measured horizontal displacements. The horizontal displacements measured in five excavation sites were between 25% and 47% of the allowable displacement, which were well agreed with the low subsidence risk level obtained from GSRp calculation. It is expected that the GSRp method can be used as an evaluation tool for predicting the risk of ground subsidence before excavation if GSRp is verified and supplemented through the additional research for the poor soil with the high risk of ground subsidence.

Case Study of Ground Disturbance Characteristic due to Drilling Machine in Adjacent Deep Excavation (근접 깊은 굴착에서 천공장비에 의한 지반교란 특성 사례 연구)

  • 김성욱;한병원
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.77-84
    • /
    • 2003
  • Deep excavations in the urban areas have been frequently going on in large scale. Soil-nailing and Earth-anchor supporting methods are generally used in deep excavation. These construction methods cause ground disturbances during drilling process, and damages of adjacent structures and ground due to the differential settlement throughout construction period, and unexpected behaviors of supporting system according to the characteristics of drilling machine and ground condition. This article introduces two actual examples of adjacent deep excavation for the construction of university buildings in granitic Seoul area. The important results of construction and measurements obtained using Crawler drilling machine for Soil-nailing and Earth-anchor supporting methods are summarized. And some suggestions are given to improve and develop the technique of design and construction in the deep excavation projects having similar ground condition and supporting method.

  • PDF

Laboratory investigation on deep excavation-induced ground movements (축소모형실험을 이용한 지반굴착시 주변 지반 거동 연구)

  • Yoo, Chung-Sik;Lee, Soung-Woo;Lee, Bong-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1476-1483
    • /
    • 2005
  • This paper presents the results of small scale model tests on the behavior of propped wall and ground movements during deep excavation. Small scale model tests were performed in order to investigate the effects of various influencing factors on the deep excavation, such as stiffness of ground and unsupported span length. The results of model tests indicated that the wall behavior is significantly influenced not only by the stiffness of ground but by the over-excavation, and that the wall behavior can be reduced by decreasing the unsupported span length and increasing the stiffness of ground.

  • PDF

Prediction of Deep-Excavation induced Ground surface movements using Artifical Neural Network (인공신경망기법을 이용한 깊은 굴착에 따른 지표변위 예측)

  • 유충식;최병석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.451-458
    • /
    • 2002
  • This paper presents the prediction of deep excavation-induced ground surface movements using artificial neural network, which is of prime importance in the perspective of damage assessment of adjacent buildings. A finite element model, which can realistically replicate deep-excavation-induced ground movements was employed and validated against available large-scale model test results. The validated model was then used to perform a parametric study on deep excavations with emphasis on ground movements. Using the result of the finite element analysis, Artificial Neural Network(ANN) system is formed, which can be used in the prediction of deep exacavation-induced ground surface displacements. The developed ANN system can be effecting used for a first-order prediction of ground movements associated with deep-excavation.

  • PDF