• Title/Summary/Keyword: hybrid scheduling

Search Result 135, Processing Time 0.028 seconds

Inverted Pendulum 제어를 위한 새로운 하이브리드 퍼지게인스케쥴링 제어기의 설계

  • 정병태;박재삼
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 1997.03a
    • /
    • pp.235-246
    • /
    • 1997
  • Hybrid fuzzy gain scheduling controller is composed of a PD control and a fuzzy control for taking the advantage of each scheme. The key structure of the hybrid fuzzy gain scheduling control scheme is so called a switch which calculates weighting values between the fuzzy controller and the PD controller. However, due to the requirement of the switch , the hybrid fuzzy gain scheduling control scheme needs extra fuzzy logic processing, thus the structure is complicated. and requires more calculation time. To eliminate the drawbacks, a new hybrid fuzzy gain scheduling control scheme is proposed in this paper. In the proposed scheme, the membership function, for calculating of weithting value, and the input and output membership functions are combined. Thus the proposed hybrid scheme does not require switch for calculation of weighting value, and as a result, the calculation time is faster and the structure is more simple than the existing hybrid controller. Computer simulation results for an inverted pendulum model under Pole-Placement PID controller, fuzzy gain scheduling controller,existing hybrid controller , and proposed hybrid controller are compared to demonstrate the good property of the proposed hybrid controller.

Scheduling Methods for a Hybrid Flowshopwith Dynamic Order Arrival (주문 생산 방식을 따르는 혼합 흐름 공정에서의일정계획에 관한 연구)

  • Lee, Geun-Cheol
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.32 no.4
    • /
    • pp.373-381
    • /
    • 2006
  • This paper considers a scheduling problem for a hybrid flowshop with dynamic order arrival. A hybrid flowshop is an extended form of a flowshop, which has serial stages like a flowshop but there can be more than one machine at each stage. In this paper, we propose a new method for the problem of scheduling with the objective of minimizing mean tardiness of orders which arrive at the shop dynamically. The proposed method is based on the list scheduling approach, however we use a more sophisticated method to prioritize lots unlike dispatching rule-based methods. To evaluate the performance of the proposed method, a simulation model of a hybrid flowshop-type production system is constructed. We implement well-known dispatching rules and the proposed methods in the simulation model. From a series of simulation tests, we show that the proposed methods perform better than other methods.

Enhanced Technique for Performance in Real Time Systems (실시간 시스템에서 성능 향상 기법)

  • Kim, Myung Jun
    • Journal of Information Technology Services
    • /
    • v.16 no.3
    • /
    • pp.103-111
    • /
    • 2017
  • The real time scheduling is a key research area in high performance computing and has been a source of challenging problems. A periodic task is an infinite sequence of task instance where each job of a task comes in a regular period. The RMS (Rate Monotonic Scheduling) algorithm has the advantage of a strong theoretical foundation and holds out the promise of reducing the need for exhaustive testing of the scheduling. Many real-time systems built in the past based their scheduling on the Cyclic Executive Model because it produces predictable schedules which facilitate exhaustive testing. In this work we propose hybrid scheduling method which combines features of both of these scheduling algorithms. The original rate monotonic scheduling algorithm didn't consider the uniform sampling tasks in the real time systems. We have enumerated some issues when the RMS is applied to our hybrid scheduling method. We found the scheduling bound for the hard real-time systems which include the uniform sampling tasks. The suggested hybrid scheduling algorithm turns out to have some advantages from the point of view of the real time system designer, and is particularly useful in the context of large critical systems. Our algorithm can be useful for real time system designer who must guarantee the hard real time tasks.

Intelligent FMC Scheduling Utilizing Neural Network and Expert System (신경회로망과 전문가시스템에 의한 FMC의 지능형 스케쥴링)

  • 박승규;이창훈;김유남;장석호;우광방
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.5
    • /
    • pp.651-657
    • /
    • 1998
  • In this study, an intelligent scheduling with hybrid architecture, which integrates expert system and neural network, is proposed. Neural network is trained with the data acquired from simulation model of FMC to obtain the knowledge about the relationship between the state of the FMC and its best dispatching rule. Expert system controls the scheduling of FMC by integrating the output of neural network, the states of FMS, and user input. By applying the hybrid system to a scheduling problem, the human knowledge on scheduling and the generation of non-logical knowledge by machine teaming, can be processed in one scheduler. The computer simulation shows that comparing with MST(Minimum Slack Time), there is a little increment in tardness, 5% growth in flow time. And at breakdown, tardness is not increased by expert system comparing with EDD(Earliest Due Date).

  • PDF

A Hybrid Genetic Algorithm for Job Shop Scheduling (Job Shop 일정계획을 위한 혼합 유전 알고리즘)

  • 박병주;김현수
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.26 no.2
    • /
    • pp.59-68
    • /
    • 2001
  • The job shop scheduling problem is not only NP-hard, but is one of the well known hardest combinatorial optimization problems. The goal of this research is to develop an efficient scheduling method based on hybrid genetic algorithm to address job shop scheduling problem. In this scheduling method, generating method of initial population, new genetic operator, selection method are developed. The scheduling method based on genetic algorithm are tested on standard benchmark job shop scheduling problem. The results were compared with another genetic algorithm0-based scheduling method. Compared to traditional genetic, algorithm, the proposed approach yields significant improvement at a solution.

  • PDF

An Energy-Efficient Hybrid Scheduling Technique for Real-time and Non-real-time Tasks in a Sensor Node (센서 노드에서 에너지 효율적인 실시간 및 비실시간 태스크의 혼합 스케줄링 기법)

  • Tak, Sung-Woo
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.15 no.8
    • /
    • pp.1820-1831
    • /
    • 2011
  • When both types of periodic and aperiodic tasks are required to run on a sensor node platform with limited energy resources, we propose an energy-efficient hybrid task scheduling technique that guarantees the deadlines of real-time tasks and provides non-real-time tasks with good average response time. The proposed hybrid task scheduling technique achieved better performance than existing EDF-based DVS scheduling techniques available in the literature, the FIFO-based TinyOS scheduling technique, and the task-clustering based non-preemptive real-time scheduling technique.

Generating Unit Maintenance Scheduling Considering Regional Reserve Constraints and Transfer Capability Using Hybrid PSO Algorithm (지역별 예비력 제약과 융통전력을 고려한 발전기 예방정비 계획 해법)

  • Park, Young-Soo;Park, June-Ho;Kim, Jin-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.11
    • /
    • pp.1892-1902
    • /
    • 2007
  • This paper presents a new generating unit maintenance scheduling algorithm considering regional reserve margin and transfer capability. Existing researches focused on reliability of the overall power systems have some problems that adequate reliability criteria cannot be guaranteed in supply shortage regions. Therefore specific constraints which can treat regional reserve ratio have to be added to conventional approaches. The objective function considered in this paper is the variance (second-order momentum) of operating reserve margin to levelize reliability during a planning horizon. This paper focuses on significances of considering regional reliability criteria and an advanced hybrid optimization method based on PSO algorithm. The proposed method has been applied to IEEE reliability test system(1996) with 32-generators and a real-world large scale power system with 291 generators. The results are compared with those of the classical central maintenance scheduling approaches and conventional PSO algorithm to verify the effectiveness of the algorithm proposed in this paper.

Hybrid Scheduling in Millimeter Wave Full-Duplex Systems (밀리미터파 전 이중 시스템에서의 혼성 스케줄링)

  • Mai, Vien V.;Kim, Juyeop;Choi, Sang Won;Shin, Won-Yong
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.1
    • /
    • pp.52-57
    • /
    • 2016
  • We introduce a hybrid scheduling in a multi-path poor scattering full-duplex (FD) system, which consists of one multi-antenna FD base station and a large number of single-antenna half-duplex mobile stations. Our hybrid scheduling utilizes partial channel state information at the transmitter. In particular, unlike the conventional scheduling method using opportunistic transmission for both uplink and downlink, the proposed scheme combines a random transmit beamforming for downlink and a zero forcing beamforming for uplink. As our main result, via computer simulations, it is shown that the proposed scheme has a superior sum-rate performance than that of the conventional scheduling method beyond a certain signal-to-noise ratio regime.

NHS: A Novel Hybrid Scheduling for ILP

  • You, Song-Pei;Mashiro Sowa
    • Proceedings of the IEEK Conference
    • /
    • 2000.07a
    • /
    • pp.310-313
    • /
    • 2000
  • This paper presents a new scheduling method for ILP processing called NHS(Novel Hybrid Scheduling). It concerns not only exploiting as much ILP as possible like other state-of-the-art scheduling scheme, but also choosing the most important instructions among many ready-to-execute instructions to processors in order to reduce the execution time under limited hardware resource. At the heart of NHS is a conception called CCP(Complex Critical Path), an extension of CP(Critical Path). By using CCP, compiler not only can get a global information of the whole program to extract ILP, but also can collecting data dependence information and control flow information. The paper also presents the simulation results, to date, of our attempts to study the NHS scheduling method. The results indicate good potential for this scheduling method.

  • PDF

Cross-Layer Cooperative Scheduling Scheme for Multi-channel Hybrid Ubiquitous Sensor Networks

  • Zhong, Yingji;Yang, Qinghai;Kwak, Kyung-Sup;Yuan, Dongfeng
    • ETRI Journal
    • /
    • v.30 no.5
    • /
    • pp.663-673
    • /
    • 2008
  • The multi-scenario topology of multi-channel hybrid ubiquitous sensor networks (USNs) is studied and a novel link auto-diversity cross-layer cooperative scheduling scheme is proposed in this paper. The proposed scheme integrates the attributes of the new performance evaluation link auto-diversity air-time metric and the topology space in the given multi-scenario. The proposed scheme is compared with other schemes, and its superiority is demonstrated through simulations. The simulation results show that relative energy consumption, link reception probability, and end-to-end blocking probability are improved. The addressing ratio of success with unchanged parameters and external information can be increased. The network can tolerate more hops to support reliable transportation when the proposed scheme is implemented. Moreover, the scheme can make the network stable. Therefore, the proposed scheme can enhance the average rate performance of the hybrid USN and stabilize the outage probability.

  • PDF