• Title/Summary/Keyword: hydro-electricity generation

Search Result 31, Processing Time 0.037 seconds

Public Preferences for Replacing Hydro-Electricity Generation with Coal-Fired Power Generation (석탄화력 발전 대비 수력 발전에 대한 국민 선호도 분석)

  • Choi, Hyo-Yeon;Ryu, Mun-Hyun;Yoo, Seung-Hoon
    • Journal of Energy Engineering
    • /
    • v.24 no.1
    • /
    • pp.164-171
    • /
    • 2015
  • Although coal-fired power generation has played a role as base load unit, it has incurred various social costs in the process of generating and providing electricity. It is necessary to extend the proportion of low-carbon power generations, and reduce the ratio of coal-fired power generation to cope with global climate changes. This study, therefore, attempts to estimate the public's willingness-to-pay (WTP) for substitution of supplied electricity from hydro-electricity generation, a representative renewable energy, for coal-fired power generation. To this end, we apply the contingent valuation (CV) method, widely used technique when valuing non-market goods, to elicit the public's WTP. In addition, a spike model is employed to consider zero WTPs. After the empirical analysis with 1,000 households CV survey data, the results show that mean household's WTP for replacing supplied electricity from hydro-electricity generation with coal-fired power generation is estimated to be about 54 KRW per kWh. The results of this study are expected to contribute to determining energy-mix and provide benefit information of hydro-electricity generation.

Effect of Bidding Strategies of Hydro Generation on an Electricity Market (수력발전기의 경쟁적 입찰전략이 전력시장에 미치는 영향)

  • Lee Kwang-Ho
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.9
    • /
    • pp.461-466
    • /
    • 2005
  • This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power. Simulation results show some parameters have an influence on the market power of an electricity market including a hydro generator.

Hydro-electric Power Generation System of Multi-purpose Dams in Koresa - A Framework for Investment Justification and Economic Operation - (한국의 다목적댐 수력발전 체계 - 투자의 정당화와 경제적 운영 -)

  • 이승규;박용삼
    • Korean Management Science Review
    • /
    • v.12 no.1
    • /
    • pp.157-173
    • /
    • 1995
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

  • PDF

Effect of Venturi System on Acceleration of Low-speed Water Flow at the Venturi Throat Installed at the Inlet of Hydro Turbine

  • Jung, Sang-Hoon;Seo, In-Ho;Kim, Chul-Ho
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.35 no.7
    • /
    • pp.914-920
    • /
    • 2011
  • For a hydro turbine electricity generation system in river or bay, a venturi system could be applied to accelerate flow speed at the inlet of the turbine system in a flow field. In this study, a steady flow simulation was conducted to understand the effect of venturi system on the acceleration of current speed at the inlet of a hydro turbine system. According to the continuity equation, the flow speed is inversely proportional to the cross-section area in a conduit flow; however, it would be different in an open region because the venturi system would be an obstruction in the flow region. As the throat area is 1/5 of the inlet area of the venturi, the flow velocity is accelerated up to 2.1 times of the inlet velocity. It is understood that the venturi system placed in an open flow region gives resistance to the upcoming flow and disperses the flow energy around the venturi system. The result of the study should be very important information for an optimum design of a hydro turbine electricity generation system.

A Framework for Investment Justification and Economic Operation- (한국의 다목적댐 수력발전 체계-투자의 정당화와 경제적 운영-)

  • 이승규;박용삼
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.12 no.1
    • /
    • pp.157-157
    • /
    • 1987
  • Hydro-electric power generation from multi-purpose dams has been playing important roles in the electric power supply network in Korea. Although the total share of hydro power in national electricity supply now becomes very small, the peak-shaving and frequency control capability of hydro power helps the power company enormously in maintaining the quality of power. But since the company that builds and operates the multi-purpose dams in Korea has to sell all the electricity produced to the monopolistic utility, there have been various problems in justifying the investment, designing pricing mechanism, and controlling operations of the power plants. In addition, economic evaluation of the hydro power has been distorted by a variety of reasons and hence it has been very difficult to encourage effective development and utilization of national water resources. To make the problem worse, both parties are public companies with X-inefficiency problems. Thus, changing environment requires to reengineer the system that governs hydro power generation. We address the problems of Korean hydro-electric power generation system in four areas: the investment justification process, the operations decison right of the hydro power plants, the pricing of the purchased-power, and the negotiation of contract revision. Then we propose improvement directions of new hydro-electric power system in view of static and dynamic efficiency, X-inefficiency and equity.

Analysis on a Bidding Strategy of the Hydro Generation in an Electricy Market (전력시장에서 수력발전기의 입찰전략 분석)

  • Shin, Jae-Hong;Lee, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.807-809
    • /
    • 2005
  • This paper addresses the bidding strategies of a hydro generator in an electricity market, and their effect on the electricity market in accordance with some parameters: the water volume, the demand elasticity, and the hydro unit performance. The competition of a hydro generator is formulated as a hi-level optimization problem, and the solving scheme for the equilibrium condition is proposed as a set of nonlinear simultaneous equations. The equilibrium of the oligopolistic model is evaluated by comparison with that of a perfect competition model from the viewpoint of a market power.

  • PDF

A Scheme on Energy Efficiency Through the Convergence of Micro-grid and Small Hydro Energy (마이크로그리드와 소수력 에너지의 융합을 통한 에너지 효율화 기법)

  • Kang, Bo-Seon;Lee, Keun-Ho
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.1
    • /
    • pp.29-34
    • /
    • 2015
  • As smart grid techniques developed, public attention is concentrating on energy efficiency. So it is necessary to study on new renewable energy in order to manage the energy within micro grid consisting smart grid. Among them, small hydro energy has the advantage of being installable anywhere depending the amount of water used by the users within micro grid. This study examines if the measured value is appropriate for small hydro power generation by measuring generation quantity and operation rate of generator based on the sewage flow used by apartments and multi-unit dwellings where those users live. Some appropriate apartments and multi-unit dwellings generate electricity with small hydro generator using sewage as potential energy. This study intends to suggest more effective management by introducing energy management system and electricity storage device of micro grid.

Formation Strategy of Renewable Energy Sources for High Mountain Off-grid System Considering Sustainability (지속가능성을 고려한 산악지역 독립망 전력시스템의 신재생 에너지원 구성 전략)

  • Ahn, Sung-Hoon;Lee, Kyung-Tae;Bhandari, Binayak;Lee, Gil-Yong;Lee, Caroline Sun-Yong;Song, Chul-Ki
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.9
    • /
    • pp.958-963
    • /
    • 2012
  • Characteristics of off-grid hybrid renewable energy sources for high mountain villages are discussed. Considering reliability of electric power generation, Photovoltaic (PV)-wind hybrid and PV-hydro hybrid system are suggested. Connecting two or more villages with these hybrid systems, an extended hybrid off-grid can be formed. Sustainability of entire system is important in design of off-grid system, and income generation of the village people using the electricity should be considered.

Fault Immune Pico-Hydro Powered Base Station of Remote Telecommunication Tower

  • Verma, Vishal;Pant, Peeyush;Singh, Bhim
    • Journal of Power Electronics
    • /
    • v.16 no.4
    • /
    • pp.1612-1620
    • /
    • 2016
  • This paper presents the dynamic excitation control of a siphon-turbine coupled pico-hydro powered cage rotor induction generator and load matching for off-grid electricity generation. Through the proposed dual-role of the current-controlled voltage source converter (VSC), acting as static synchronous compensator and load controller, real and reactive power are dynamically controlled in a decoupled manner with a self supported DC-bus. The proposed scheme entails minimal computation for ensuring the rated (set) capacity of real power. The scheme also exhibits fault immunity for protection, thus enabling the effective handling of constant power electrical loads presented by base telecom station towers in remote locations. The performance of the system is evaluated under MATLAB/Simulink and is experimented through a developed hardware prototype. Simulation and experimental results show close conformity and validate the effectiveness of the proposed scheme.

Economic Effects of the Post-2020 Climate Change Mitigation Commitments: From the Generation Industry's Perspective (Post-2020 신기후체제의 발전부문 대응에 따른 경제적 파급효과 분석)

  • Yun, Taesik;Lee, Bongyong;Noh, Jaeyup
    • Journal of Energy Engineering
    • /
    • v.25 no.3
    • /
    • pp.136-148
    • /
    • 2016
  • We analyze economic effects of GHG reduction measures of the generation industry to meet 2030 GHG reduction target using the scenario based approach. We estimate the GHG emission of the Korean power industry in 2030 based on both the $7^{th}$ Electricity Supply & Demand Plan and the GHG emission coefficients issued by IAEA. We set up three scenarios for reduction measures by replacing the coal fired plants with nuclear power, renewable energy and carbon capture and storage. Once and for all, the nuclear power scenario dominates the other energy technologies in terms of GHG reduction quantities and economic effects.