Analysis of Fire Accident on DC Electric Traction Vehicles Caused by Breakdown in the Line Breaker (회로 차단기 절연파괴로 인한 직류 전기철도 화재 사고사례 분석)

  • Park, Nam-Kyu;Song, Jae-Yong;Goh, Jae-Mo;Kim, Jin-Pyo;Nam, Jung-Woo
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.16-21
    • /
    • 2017
  • Fire or electrical problem while DC electric traction vehicle operation caused by various reasons can lead to not only suspension of the operation, but also severe aftermath such as massive casualty. In this paper, fire analysis on DC electric traction vehicle caused by electrical breakdown on line breaker, which is in connection with the power supply, is presented. When the electric arc, the by-product of frequent line breaker operation, is not fully diminished, it leads to electrical breakdown and fire. Especially, electrical breakdown can be easily induced by the open-and-close operation of inner contractor inside line breaker, eventually followed by ground fault and generation of transient current. Electric arc is consequent on the ground fault and acts as possible ignition source, leading to fire. Also, during the repetitive operation of the line breaker, the contactor is separated each other and some copper powder is generated, and the copper powder provided breakdown path, resulting in fire.

Exchanging of old electrical equipment and discussion of SCADA system's operation related with exchanging of old electrical equipment (노후전력설비 교체에 따른 SCADA시스템의 운용 고찰)

  • Kim, Youn-Sik;Park, Rai-Hyug;Lee, Gi-Seung
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.417-422
    • /
    • 2008
  • The DC high speed circuit breaker used in Seoul Metro for line no.1.2 is Japan HITACHI and FUJI breaker, and for line no.3.4 is Whipp & Bourne MM74 breaker from UK. The years that each breakers made are 1973(line no.1), 1984(line no.3.4), So that equipments are superannuated. Nowday the for equipment exchanging is executing, equipment for exchanging were used the Secheron breaker from Swiss. but now the Intec breaker made in Korea is used. The RTU of supervisory control and data acquisition system have the capabilities that can observe, control and work the installation efficiently. In this paper, as summarizing the solving process of problem that happened the SCADA system when old-equipment exchange and concerned point for logical supervision and control of reservation factors and equipment, I'll provide the direction that can do receiving-process of control-equipment, progressed with the exchange of old-electronic equipment.

  • PDF

A Study on the Reducing the Return Line Pressure Fluctuation of the Hydraulic Breaker System (유압 브레이커의 리턴 라인의 압력 맥동 감소에 관한 연구)

  • 성원준;노태봉;송창섭
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.20 no.9
    • /
    • pp.70-76
    • /
    • 2003
  • In this study, the hydraulic breaker system was analyzed and simulated using. The simulation result was certified comparing with the experimental result. From the parametric analysis, the effects of each factor were revealed. Through the simulation with varying parameters, the method to reduce the return line pressure fluctuation was presented.

Forced reclosing in transmission line (송전선의 강제재폐로)

  • 김준현
    • 전기의세계
    • /
    • v.29 no.6
    • /
    • pp.401-409
    • /
    • 1980
  • This paper deals with the implementation of forced reclosing the transmission line. Because the ground circuit breaker method decrease the secondary arc current sufficiently, the reclosing time can be reduced. As the secondary arc current is large and its residual time is long in UHV transmission line, this method is more effective in that system. The resistance of ground circuit breaker which minimize the secondary arc current is determined according to the system voltage and the length of transmission line.

  • PDF

Analysis of SLF Interruption Performance of Self-Blast Circuit Breaker by Means of CFD Calculation

  • Kim, Hong-Kyu;Chong, Jin-Kyo;Lee, Se-Hee
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.1
    • /
    • pp.254-258
    • /
    • 2014
  • This paper presents the performance analysis results of a short line fault interruption of a gas circuit breaker, particularly a self-blast type breaker. Hot gas flow analysis was carried out using a CFD calculation combined with the arc model and nozzle ablation model. To evaluate the interruption performance, the index function was defined using the pressure in the heating chamber and the density above the arc region. The simulation and test results showed that the gas flow field and suitable choice of an interruption performance index can be used to predict the interruption characteristics and provide guidelines for designing self-blast breakers with a higher interruption capability.

Simplified Synthetic Testing Facility with Modified TRV Circuit

  • Chong, Jin-Kyo;Lee, Kyung Seob;Lee, Chang-Hoon;Kim, Gyu-Tak
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.2
    • /
    • pp.881-885
    • /
    • 2018
  • In order to develop a gas circuit breaker (GCB), the breaking performance of the short line fault (SLF) should be prioritized over that of the breaker terminal fault (BTF). In brief, it is necessary to evaluate the thermal characteristics of the insulating gas that is filled in a GCB. In the process of developing a GCB, many companies use the simplified synthetic testing facility (SSTF).In order to evaluate the SLF breaking performance of a GCB with a long minimum arcing time, a modifications to the conventional SSTF was proposed. In this study, we developed the SSTF with a modified transient recovery voltage circuit. The performance of the newly developed SSTF was verified by an $L_{90}$ breaking performance test on a rating combination of 170 kV, 50 kA, and 60 Hz.

Fault Analysis of a Gas Circuit Breaker in the 154kV Power Line (154kV 전력계통 가스차단기 고장 분석)

  • Kim, Young-Kyu;Ko, Young-Hoan;Jung, Lee-Sig;Lee, Sang-Il
    • Proceedings of the KIEE Conference
    • /
    • 2008.11a
    • /
    • pp.342-344
    • /
    • 2008
  • This paper describes fault analysis of a $SF_6$ gas circuit breaker of a transformer in a hydro power plant which is connected to the 154kV line. The fault is a single-line-to-ground fault, so that it gives power generation halt and economical loss. The analysis has been done in aspects of the status of the breaker, insulation degradation, surge invasion and earthing resistance of the switchyard.

  • PDF

The Study on Application of Circuit Breaker without Closing Resistor in Short Transmission Line (단거리송전선에서 투입저항이 없는 차단기적용에 관한 연구)

  • 김정배;정영환;송원표
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.53 no.1
    • /
    • pp.31-37
    • /
    • 2004
  • In this paper, the analysis result of the switching surge in substation including GIS(Gas Insulated Switchgear) has been described using the EMTP(Electro Magnetic Transient Program) program. After performing the modeling of the input data, we have reviewed the energization overvoltages of GCB(Gas Circuit Breaker) without closing resistor in 345kV network, according to the conditions of simultaneously operating switch and statistically operating switch. Firstly, it can be known that the energization overvoltage of single line is higher than that of parallel energized line. Secondly, the maximum energization overvoltage obtained in statistics switch is higher than one in simultaneous switch. From these results, it can be known that the phase-to-earth energization overvoltages of $\alpha$-$\beta$ section are less than 2.2 p.u when closing resistor is eliminated. Therefore, it is possible to consider the circuit breaker eliminated the closing resistor in $\alpha$-$\beta$ section.

Application & Examination of the Plan for Optimum Stability through Water-hammer in Pipe Line and Booster Pump Station (관로계통 및 가압펌프장 수격에 따른 최적 안정성 확보방안)

  • Ra, Beyong-Pil;Park, Jong-Ho
    • The KSFM Journal of Fluid Machinery
    • /
    • v.12 no.5
    • /
    • pp.19-24
    • /
    • 2009
  • This paper is performed to find out the stability of water-hammer in pipe line and pump station that is happened when additional water needs demanded. At first, the water supply construction project is planned to supply $6,000\;m^3/day$ through 17.9 km pipe line. But additional demand ($1,200\;m^3/day$) happened from Cheong-ra water reservoir. In this situation, air-chamber($4\;m^3$) and vacuum breaker valve(${\varphi}100\;mm$) are needed to prevent water-hammer. When the additional water is supplied, the existing facilities (air-chamber, vacuum breaker valve) are sufficient to alleviate shock not changing capacity alteration, judging from the airspace change and rise. Therefore, there is no problem for water-hammer by installing air-chamber($4\;m^3$) and vacuum breaker valve(${\varphi}100\;mm$) at the top of Yeo-ju hill.

Artificial line for short-line fault test (근거리선로고장전류 차단시험용 Artificial line)

  • Park, Seung-Jae;Rhyou, Hyeong-Kee;Kang, Young-Sik;Koh, Heui-Seog
    • Proceedings of the KIEE Conference
    • /
    • 2001.07c
    • /
    • pp.1783-1785
    • /
    • 2001
  • With the 4-MJ synthetic testing facilities completed, KERI can perform the circuit breaker testing up to 420 kV, 50 kA ratings. The short-line fault test is one of the necessary test items which are required for the circuit breaker, and in order to perform the short-line fault test KERI(Korea Electrotechnology Institute) has used the "new artificial line" which has small dimension and is easy to generate the saw-tooth wave. This paper describes the following items of the new artificial line. -Description of 4-kinds of artificial lines and determination of the circuit parameter of artificial line. -TRV characteristics of saw-tooth waves for each circuit. -KERI's artificial line.