• Title/Summary/Keyword: management%26maintenance

Search Result 135, Processing Time 0.028 seconds

A Comparative Study on the Condition of Management and Consciousness of Bogumjari Housing Complex and Private Condominium (보금자리주택 단지와 민간분양아파트 단지의 관리 실태와 관리의식 비교연구)

  • Kang, Soon-Joo
    • Journal of the Korean housing association
    • /
    • v.26 no.2
    • /
    • pp.29-38
    • /
    • 2015
  • The purpose of this study is to understand the actual condition of Bogumjari Housing Complex residents' management consciousness and to provide suggestions on ways to induce residents' volunteer participation and practice of the apartment management. This study was performed on Bogumjari Housing Complex which was occupied in 2012 and the similar-sized apartment complex of the private condominium to compare and analyze their actual condition of management and consciousness of their residents. The results of the analysis could be summarized as follows: 1) In terms of management of operation, there is no distinct difference. In terms of maintenance management, Bogumjari Housing Complex has difficulty in maintenance because of lack of management manpower. Also, the apartment complex of the private condominium has higher spontaneous participation rate, which seems to be influenced by activation of various organizations. 2) In terms of the satisfaction of management process, Bogumjari Housing Complex has have higher satisfaction with promotion of the apartment Management Rules, but it has lower satisfaction with public hygiene, community facility maintenance and operation of program than that of apartment complex of the private condominium. 3) Bogumjari Housing Complex has higher maintenance and participation consciousness, drawing conclusion that Bogumjari Housing Complexs' residents have higher expectations for apartment, a keen interest and strong will.

BrDSS: A decision support system for bridge maintenance planning employing bridge information modeling

  • Nili, Mohammad Hosein;Zahraie, Banafsheh;Taghaddos, Hosein
    • Smart Structures and Systems
    • /
    • v.26 no.4
    • /
    • pp.533-544
    • /
    • 2020
  • Effective bridge maintenance reduces bridge operation costs and extends its service life. The possibility of storing bridge life-cycle data in a 3D parametric model of the bridge through Bridge Information Modeling (BrIM) provides new opportunities to enhance current practices of bridge maintenance management. This study develops a Decision Support System (DSS), namely BrDSS, which employs BrIM and an efficient optimization model for bridge maintenance planning. The BrIM model in BrDSS extracts basic data of elements required for the optimization process and visualizes the inspection data and the optimization results to the user to help in decision makings. In the optimization module of the DSS, the specifically formulated Genetic Algorithm (GA) eliminates the chances of producing infeasible solutions for faster convergence. The practicality of the presented DSS was explored by utilizing the DSS in the maintenance planning of a bridge under operation in the southwest of Iran.

Development of PEID for Acquiring Maintenance Information during Product Lifecycle of Marine Vessels (선박해양구조물의 제품수명주기 내 유지보수 정보 획득을 위한 PEID에 관한 연구)

  • Jeon, Jeong-Ik;Lee, Jang-Hyun;Son, Gum-Jun
    • Journal of Ocean Engineering and Technology
    • /
    • v.26 no.5
    • /
    • pp.63-72
    • /
    • 2012
  • The product lifecycle of a marine vessel can be classified into the design-production, operation-maintenance, and disposal phases. During the operation and maintenance phase, status data should be gathered from the major machinery and instruments installed on the marine vessel in order to perform efficient maintenance work. Although a PLM (product lifecycle management) system can manage the product information during the design and assembly stage, a PLM based on asset management technology is more appropriate for product information management during the operation stage. Product embedded information devices (PEIDs) are suggested for gathering real-time maintenance information during the operation and maintenance lifecycle. A PEID allows PLM to provide the capability of offering active information exchange between the lifecycle management system and equipment. This study designed a PEID to effectively obtain information and interact with a PLM system. It consists of sensors, wireless communication, and a micro-processor, which allow it to accumulate status data on the PLM system. The embedded information device and PLM enable the seamless information flow, tracking, and updating of MRO (maintenance repair and overhaul) information for a product throughout the middle of the product lifecycle.

A Study on Professional Qualification System for Electric Vehicles (전기자동차 관련 전문자격제도의 개선방향과 과제)

  • Jeon, Ju Su;Jeon, Jinwon
    • Journal of Auto-vehicle Safety Association
    • /
    • v.13 no.3
    • /
    • pp.26-31
    • /
    • 2021
  • Although the number of domestic electric vehicle registrations exceeded 100,000 in the first half of 2020, legal and institutional concerns for maintenance and management are insufficient. In particular, the existing automobile maintenance business and qualification holders are not prohibited from performing electric vehicle maintenance without additional qualifications or training under the current laws. In this study, we review the current status of Korean laws and regulations, examine discussions abroad such as the UK, the US, and Germany, and then discuss desirable laws and institutional reform. This study proposes to temporarily reorganize the system in a way that separates the electric vehicle maintenance business and the electric vehicle maintenance qualifications from conventional vehicle.

A Study on Classification of the Management Works in the Apartment House (공동주택 관리업무 유형화에 관한 연구)

  • 박현옥
    • Journal of the Korean Home Economics Association
    • /
    • v.26 no.3
    • /
    • pp.125-134
    • /
    • 1988
  • This study is for classification of the management works in the Apartment House. The approach of this study depends on the consultation of concerned references and direct interview by structured questionnaire. The management works are classified and compared, analysized with foreign cases. 1) It is 13 hour a day to carring out the management works in the Board. 2) Compared the management works in the Apartment House with England and the united states, the leaders, they are the first I performing all of management. The secondaries are the Japan and Korea. Specially Japan is collecting data in the maintenance. In case of Korea, they are performing all of management but little. We expect a more thoroughgoing preinvestigation, control of planning and management of community life for the inhabitants in time to come. 3) the management works of the Apartment House are classified three types. \circled1management of administration \circled2 management of maintenance \circled3 management of community life control.

  • PDF

Effects of Chemical Accident Risk Warning System in High Risk Workplaces of Major Industrial Accidents (중대산업사고 고위험 사업장에서의 화학사고위험경보제의 효과)

  • Woo Sub Shim;Ji Ung Choi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.765-774
    • /
    • 2023
  • The Ministry of Employment and Labor implemented the process safety management(PSM) system from 1996 to prevent major industrial accidents caused by chemical substances, but the number of accidents did not drastically decrease. Even in workplaces with excellent PSM ratings, large-scale chemical accidents still occur due to non-compliance with safety work procedures and insufficient safety measures during maintenance and other work. Accordingly, the chemical accident risk warning system was introduced in 2014 to supplement the PSM system and prevent accidents that may occur during regular or unexpected maintenance and repair work. In the meantime, changes in the safety management system have been checked since the introduction of the chemical accident risk warning system at chemical handling workplaces, and based on the results, a plan for upgrading this system has been proposed. The effect of the CARW system was found to directly prevent accidents through wired and on-site consulting and post-management at the workplace and indirectly contribute to the establishment of a safety and health management system at the workplace, such as improving safety culture awareness.

Restructuring the Public Assessment of Housing Management Toward Standardization

  • Lee, Hyunjeong
    • Architectural research
    • /
    • v.16 no.1
    • /
    • pp.17-25
    • /
    • 2014
  • This research is to restructure the public assessment of housing management in a standardized fashion, and a self-administered questionnaire survey was employed for data collection and analysis. In doing so, all the assessment tools nationwide were identified and assembled to extract the items included in the survey form. The survey form was mailed out to local officers in charge of housing management and professional housing managers in the nation, and the responses were statistically analyzed in order to structure the standard assessment tool of housing management. This research classified 3 main areas (General Maintenance, Operation and Community Living) in evaluating the housing management performance, and identified 35 essential items and 52 optional items. The 35 essential items were drawn from the 16 categories of the 3 areas (11 items of 5 categories for General Maintenance, 7 items of 4 categories for Operation, and 17 items of 7 categories for Community Living), and the rest 52 optional items were from the 16 categories of the 3 areas (24 items of 7 categories for General Maintenance, 26 items of 7 categories for Operation, and 2 items of 2 categories for Community Living). While all the items in the research are quantifiable, it's suggested that qualitative measurements be complementarily utilized in the assessment not only to explore the best practices of housing management but also to refine and modify the standardized tool in response to various environmental changes. As the public assessment of housing management is context-sensitive and critically related to local housing profile, the continuous implementation of the assessment will facilitate shifting the housing paradigm from production and consumption to management and reproduction.

Perception Survey on the Necessity of Improvement for the Standard Buoys Fouling Maintenance

  • Yoo, Yun-Ja;Kim, Tae-Goun;Gug, Seung-Gi
    • Journal of Navigation and Port Research
    • /
    • v.43 no.2
    • /
    • pp.93-100
    • /
    • 2019
  • In 2001, about 20 years after the introduction of the standard buoys, the natural environment and maritime traffic flow changes in the waters near Korea and the necessity of improvement of the AtoN (Aids to Navigation) maintenance was suggested. The IALA provides guidelines for maintenance and management of AtoN, and Korea provides guidelines for the management and operation of standard buoys by means of the Enforcement on the AtoN laws. The objective of this study was to investigate the installation status and the repair status of the standard type buoys by sea area in order to improve the management and operation of the steel standard buoys. In addition, a survey was conducted on the improvement of the steel buoy fouling and the improvement of the lifting inspection cycle towards on the AtoN managers and producers of the representative authority by sea area. In the case of LL-26 (M) buoy type, the standard type buoy installation status of Korea in 2017 was 57.1%, and the LL-26 (M) type was 58.9% showing the highest repair rate. According to the results of the survey on buoys fouling, 51.2% were caused by the attachment of shellfish, and 43.2% were caused by bird feces. The results of the survey on the improvement of the regular buoy inspection cycle showed that the measures are to maintain the current inspection period of 2 years regardless of the characteristics of the sea area (water depth, inside and outside port, buoy size, etc.).

Research on RAM-C-based Cost Estimation Methods for the Supply of Military Depot Maintenance PBL Project (군직 창정비 수리부속 보급 PBL 사업을 위한 RAM-C 기반 비용 예측 방안 연구)

  • Junho Park;Chie Hoon Song
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.5
    • /
    • pp.855-866
    • /
    • 2023
  • With the rapid advancement and sophistication of defense weapon systems, the government, military, and the defense industry have conducted various innovative attempts to improve the efficiency of post-logistics support(PLS). The Ministry of Defense has mandated RAM-C(Reliability, Availability, and Maintainability-Cost) analysis as a requirement according to revised Total Life Cycle System Management Code of Practice in May 2022. Especially, for the project budget forecast of new PBL(Performance Based Logistics) business contacts, RAM-C is recognized as an obligatory factor. However, relevant entities have not officially provided guidelines or manuals for RAM-C analysis, and each defense contractor conducts RAM-C analysis with different standards and methods to win PBL-related business contract. Hence, this study aims to contribute to the generalization of the analysis procedure by presenting a cost analysis case based on RAM-C for the supply of military depot maintenance PBL project. This study presents formulas and procedures to determine requirements of military depot maintenance PBL project for repair parts supply. Moreover, a sensitivity analysis was conducted to find the optimal cost/utilization ratio. During the process, a correlation was found between supply delay and total cost of ownership as well as between cost variability and utilization rate. The analysis results are expected to provide an important basis for the conceptualization of the cost analysis for the supply of military depot maintenance PBL project and are capable of proposing the optimal utilization rate in relation to cost.

An Optimization Model for O&M Planning of Floating Offshore Wind Farm using Mixed Integer Linear Programming

  • Sang, Min-Gyu;Lee, Nam-Kyoung;Shin, Yong-Hyuk;Lee, Chulung;Oh, Young-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.12
    • /
    • pp.255-264
    • /
    • 2021
  • In this paper, we propose operations and maintenance (O&M) planning approach for floating offshore wind farm using the mathematical optimization. To be specific, we present a MILP (Mixed Integer Linear Programming that suggests the composition of vessels, technicians, and maintenance works on a weekly basis. We reflect accessibility to wind turbines based on weather data and loss of power generation using the Jensen wake model to identify downtime cost that vary from time to time. This paper also includes a description of two-stage approach for maintenance planning & detailed scheduling and numeric analysis of the number of vessels and technicians on the O&M cost. Finally, the MILP model could be utilized in order to establish the suitable and effective maintenance planning reflecting domestic situation.