• Title/Summary/Keyword: monitoring plan

Search Result 739, Processing Time 0.029 seconds

Diagrammatic Representation of Environmental Monitoring Data

  • Yoshioka, Takahito;Sekino, Tatsuki
    • Korean Journal of Ecology and Environment
    • /
    • v.38 no.spc
    • /
    • pp.76-83
    • /
    • 2005
  • The marked increase in the number of environmental problems, combined with the increase in their intensity and spatial extent, has resulted in an ever-increasing need for constant monitoring. This is complicated by the occurrence of new and complicated environmental issues that often prevent a thorough understanding of the entire monitoring framework. In the present study, a diagrammatic method was developed to present the entire framework of a monitoring plan. The diagram was separated into three sections- "Problem Section", "Research Process and Data Section" and "Entities Section" - to clearly present the disparate relationships between monitoring objectives and the monitoring procedure. Notation of the diagrams was undertaken using Unified Modeling Language (UML). A hypothetical monitoring plan for an environmental problem was designed to assess usefulness of the diagrammatic method. The diagram was capable of reviewing and revising the monitoring plan and could be used to select a monitoring procedure according to the monitoring objectives of the plan. The results suggested that this diagrammatic method was effective for designing an appropriate monitoring plan for a given monitoring objective.

Case Study on Analysis the Problem and Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 문제점 분석 및 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03c
    • /
    • pp.93-104
    • /
    • 2000
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the methods of improvement were proposed for applying to subway monitoring maintenance effectively in future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF

Spaceborne Monitoring Plan for Land Management (국토관리를 위한 공중모니터링 방안수립에 관한 연구)

  • Shin, Dong-Bin;Ahn, Jong-Wook
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.26 no.4
    • /
    • pp.367-378
    • /
    • 2008
  • The study is the establishment of spaceborne monitoring plan for land management. Spaceborne monitoring is land use change detection, tracking and forecasting process. For land management spaceborne monitoring plan are First, land monitoring system and long-term planning. Secondly, the spaceborne monitoring agency dedicated to specify. Thirdly, to educate the spaceborne monitoring the area of professional manpower. Fourth, data sharing and distribution systems to be prepared. Fifth, to establish real-time airborne monitoring systems. Sixth, to improve the relevant legal and institution. Seventh, continuing research and development of related technologies, and support.

Monitoring Management Plan for Changed Region with respect to Revision Periods (변화지역에 대한 갱신주기별 모니터링 운영방안)

  • Han, You Kyung;Yeom, Jun Ho;Kim, Yong Il;Lee, Byoung Kil
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.5
    • /
    • pp.401-410
    • /
    • 2013
  • Due to the increasing need for spatial information, there have been a lot of research related with monitoring and revision of changed regions for the acquisition of the accurate and latest information. In this paper, the optimal monitoring management plan for changed regions with respect to the revision periods was proposed. For this purpose, the representative monitoring methods, which are based on database, professional manpower and crowdsourcing of continuous revision, and aerial imagery, satellite imagery and LiDAR of cyclic revision, were investigated. Then, the properties and application status of monitoring systems in Korea were illustrated according to the methods. Finally, the optimal monitoring management plan for continuous and cyclic revisions was suggested through the comparison of properties and revisionable objects of each method. From the result, it was shown to be appropriate for the optimal monitoring management plan of continuous revision as using Internet-Architectural Information System (e-AIS) database cooperated with professional manpower and crowdsourcing, and cyclic revision as using domestic high-resolution satellite images and LiDAR data processed semi-automatically.

A Study on the Improvement Plan of Construction Noise Monitoring (공사장 소음모니터링 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.23 no.12
    • /
    • pp.1056-1065
    • /
    • 2013
  • Noise generated from Construction site has been raised most civil complaints to 64.4 % among the environmental pollution in 2011. Therefore, local government recommends and prescribes that construction sites over a certain scale install sound level meter for noise monitoring. For example, Seoul has implemented a 24 hour noise monitoring system, with real time communication, to the large construction sites more than 10,000 $m^2$ from the end of August 2012. But it is difficult to use noise measurement data for the construction noise assessment, since the installation standards and technical specifications for construction noise monitoring system are not presented. In this paper, we proposed noise monitoring system improvement plan including technical specifications and installation standards using the investigating results of the problems of current noise monitoring system and the foreign cases.

Case Study on Technology and Regulation Improvement of Subway Maintenance Monitoring (지하철 유지관리 계측의 기술 및 제도 개선방안 연구)

  • 우종태;김홍석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.303-308
    • /
    • 2000
  • By means of analyzing of monitoring technology and monitoring regulation based on maintenance monitoring system installed in subway tunnel section, it needs monitoring system, development of operating program, monitoring analyzing system and development of analysis method, establishment of maintenance monitoring standard specification, and performance of responsible monitoring supervision for applying to subway monitoring maintenance effectively in future. It requires specialized monitoring and legislation of monitoring subcontract, improvement of monitoring work contract method, establishment the standard payment of monitoring, and effective calibration and correction of monitoring system in the plan of improving monitoring regulation.

  • PDF

The Development Plan of Voltage Security On-Line Monitoring System (전압안전성 온라인 감시시스템의 개발방안)

  • Jeon, D.H.;Kweon, S.G.;An, G.W.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07c
    • /
    • pp.1173-1175
    • /
    • 1998
  • This paper presented the development plan of voltage security on-line monitoring system (VSECOMs). VSECOMs consists of voltage security monitoring system and data management system. VSECOMs has the function of bus voltage watch. voltage stability analysis, and voltage security assessment. EMS data on-line acquisition, PSS/E file conversion, and overall data management. VSECOMs is designed with client/server structure. We will seek stable operation of KEPCO's power system by installation of VSECOMs in EMS of KEPCO.

  • PDF

The Study on the Integrated Monitoring of Water Quantity and Quality Data (수량 및 수질관측 통합연계 운영 연구)

  • Yi, Jae-Eung;Kim, Mun-Mo;Park, Sung-Je
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.5
    • /
    • pp.115-123
    • /
    • 2009
  • Integrated information to water quantity and quality is essential for planning water resources management as well as operating water-related infrastructures. Because data collection process including monitoring and maintenance is separated in different governmental agencies in Korea, integrating quantity and quality may provide effective and better management implementation. In this study, a number of suggestions regarding integration of water monitoring were concluded in terms of technological, legal and institutional implications. First, it is necessary to discuss national water monitoring plan, national water information management plan, agreement of standard terms of monitoring between ministries, and to revise the law(river law and water quality management law). Present stations for water monitoring should be used for both of quantity and quality monitoring. If station is newly installed or relocated, it is better that one single agency maintain monitoring frequency and data management as well. In addition, a monitoring protocol need to be agreed by each of parties. In order to develop integrated monitoring system, quality assurance of the collected data should be properly maintained. Since many purposes haven been concerned using of data analysis and assessment so far, it may not be easy to integrate water quantity and quality monitoring in a short period. However, the alternatives including enhancing institutional regulations and programs, advanced technology may promote an efficient integrated water monitoring.

A Study on the Monitoring and Evaluation of Priority Projects for Urban Regeneration (도시재생사업의 모니터링 및 평가방안 연구: 선도지역을 사례로)

  • Kim, Ryoon-Hee;Lee, Jong-Gun;Lee, Sam-Su
    • Land and Housing Review
    • /
    • v.6 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • This study is significant by suggesting the plan of urban regeneration strategy, selection of vitalization area and build basic DB for establishing a plan of urban regeneration vitalization and draw measures to evaluate and monitor as urban regeneration project is promoted in earnest. For the process of study, basic DB and evaluation monitoring index were examined based on collaboration proposal of 13 leading areas and (the agenda of) the plan of urban regeneration vitalization in 4 areas(Seoul, Changwon, Busan, Yeongju). This study can be concluded as follows; First, general information system which can support regeneration strategy vitalization plans for smooth promotion of the project and manage regeneration vitalization project and all kinds of city maintenance projects systematically are necessary. Second, monitoring of regeneration project should be firstly institutionalized. thrid, it's necessary to secure that city or county foundational management plan and the relations during the establishment of strategic vitalization plan. Finally, it's necessary to introduce and evaluate modularized plan suitable for Bottom-up regeneration project.