• Title/Summary/Keyword: planning of monitoring

Search Result 596, Processing Time 0.031 seconds

The Study on Elaboration and Applications of the Urban Regeneration Monitoring Indicators - Based on Foreign Cases - (도시재생사업 모니터링 지표 구축 및 적용 방안 연구 - 해외 도시재생 모니터링 지표 고찰을 중심으로 -)

  • Choi, Min-Ah;Choi, Ji-In;Yang, Dong-Suk
    • KIEAE Journal
    • /
    • v.13 no.3
    • /
    • pp.51-60
    • /
    • 2013
  • The necessity of urban regeneration is recently increasing because of the deterioration existing urban area and the slowdown of new development operations. The urban regeneration is differentiated from other private operations by its public characters, which is the basis of public support. This character demands verification of the adequacy for public finance support by monitoring urban regeneration planning and operation. Therefore, this study aims to show the monitoring indicators and its application in legal system for urban regeneration through the examination of foreign countries cases. London, San Francisco, and France urbanism regulation and planning system show the measure for introducing urban regeneration monitoring system into korean urbanism institution. This study is significant by suggesting the circulation structure of urban regeneration by linking planning, operations and monitoring phases. The monitoring system permits improvement of urban regeneration by clarifying objects and ameliorating efficiency by continuos observation and application of its evaluation.

A Study of Strategy for Planning of Rework in Semiconductor Monitoring Burn-in Test Process (반도체 MBT 공정의 Rework 제품 투입결정에 관한 연구)

  • Lee, Do-Hoon;Ko, Hyo-Heon;Kim, Sung-Shick
    • IE interfaces
    • /
    • v.18 no.3
    • /
    • pp.350-360
    • /
    • 2005
  • This paper considers a strategy for planning of rework in semiconductor monitoring burn-in test process. The equipment error in monitoring burn-in test process generates many defects. These defects are transformed into good products by rework process, i.e. retest. Rework has the advantage of saving production costs. But rework increases holding costs and incurs rework costs. In monitoring burn-in test process, rework depends on operator's experience with no pre-defined specification. In practice, a number of rework activities are performed with respect to the product importance and inventory quantity. Moreover, disregard for order jobs schedule have caused due date penalties. So a strategy for planning of rework by which order jobs schedule are not affected is suggested. Futhermore, production costs, rework costs and inventory costs for planning of rework are considered.

Export Yard Planning System Integrated with Yard Monitoring System in Container Terminal (장치장 모니터링 시스템과 통합된 효율적인 수출 장치장 계획 시스템)

  • Lee, Chae-Min;Shin, Jae-Yeong
    • Journal of Navigation and Port Research
    • /
    • v.27 no.1
    • /
    • pp.31-40
    • /
    • 2003
  • Because yard monitoring system is a part of real-time operation system and yard planning system, most planers, in container terminal, Busan Port, can not consider real-time and exact yard situation and container information such as position of equipments or movement of container with current planning system when export yard planning os established. Therefore, many planers recognize the limit of current planning system and try to find the solution to get over it. The reason of this, heuristic algorithms for the export yard the limit of current planning ,operating on monitoring system, are suggested and integrated export yard planning system is designed and developed in this paper.

Power Quality Monitoring System with a New Distributed Monitoring Structure

  • Won, Dong-Jun;Chung, Il-Yop;Kim, Joong-Moon;Ahn, Seon-Ju;Moon, Seung-Il;Seo, Jang-Cheol;Choe, Jong-Woong
    • KIEE International Transactions on Power Engineering
    • /
    • v.4A no.4
    • /
    • pp.214-220
    • /
    • 2004
  • Power quality monitoring is the cornerstone for power quality analysis, diagnosis and improvement. The measurement of power quality (PQ) evolves from instantaneous metering to continuous monitoring. Furthermore, recent technologies enable us to construct more flexible, reliable, rapid and economical power quality monitoring system (PQMS). Therefore, this paper presents an improved PQMS with a new distributed monitoring structure. The proposed PQMS consists of a PQ meter, PQ analyzer and GUI. The PQ meter only collects raw data and the PQ analyzer performs power quality analysis. It has several advantages compared to conventional structures in economic efficiency, modularity, speed, etc. PQ monitoring algorithms to catch steady-state trends and to detect PQ events are also adapted to the proposed structure. Using the proposed structure and monitoring algorithm, a prototype PQMS is constructed and real-time testing is performed.

Discussion on the Technology Route for Land Degradation Monitoring and Assessment based on 3S Technique

  • Jing, Wang;Ting, He;Zhang, Ji-Xian;Li, Hai-Tao
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.757-765
    • /
    • 2002
  • This paper analyzes three theories for land degradation assessment and internationl/domestic methods for land degradation monitoring and assessment. Under the guidance of absolute degradation thought, this paper proposes the technological framework for monitoring and appraising cultivated land degradation based on the 3S technique. We can apply 3S technique and analyze the nature, the environmental, the social, and the economic elements which influence the land utilization and degradation synthetically, to set up the indicator system of the cultivated land degradation monitoring and assessment based on 3S technique; to propose the degradation information extraction methods based on 3S technique; to create the quantitative assessment model and method for land degradation; to analyze the ecological environment response of land use and degradation quantitatively; and to propose the measure, policy and suggestion for solving the land degradation problem from the point of view of land utilization.

  • PDF

Orienteering Problem with Unknown Stochastic Reward to Informative Path Planning for Persistent Monitoring and Its Solution (지속정찰 임무의 경로계획을 위한 불확실 기댓값 오리엔티어링 문제와 해법)

  • Kim, Dooyoung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.22 no.5
    • /
    • pp.667-673
    • /
    • 2019
  • We present an orienteering problem with unknown stochastic reward(OPUSR) model for persistent monitoring tasks with unknown event probabilities at each point of interest. Prior studies on orienteering problem for persistent monitoring task assume that rewards and event probabilities are known as a prior. In this paper, we propose a stochastic reward model with unknown event statistics and a path re-planning algorithm based on Bayesian reward inference. Experiments demonstrate the efficiency of our method.

The Development of a Performance Evaluation Tool for Health Promotion Programs of Public Health Center (보건소 건강증진사업 성과평가지표 개발 -금연, 운동, 영양, 절주, 고혈압사업을 중심으로-)

  • 서영준;이동현;손동국;정승원;정애숙;박남수;김주경;이희원;이무식
    • Korean Journal of Health Education and Promotion
    • /
    • v.21 no.2
    • /
    • pp.1-16
    • /
    • 2004
  • The ultimate goal of health promotion programs is to improve the quality of life through promoting community health. Since the performance of health promotion programs are greatly affected by the quality of the planning and implementation process of the programs, the proper quality assessment of the program process is very important. According to existing literature, the tool for assessing the quality of the process and implementation as well as the outcome. However, no assessment tool for the quality of the process of health promotion programs has been developed in Korea. The purpose of the study is to develop a quality assessment tool for the process of health promotion programs being conducted at public health centers in Korea. The quality assessment tool developed in the study consists of the following four domains: strategic planning (14 items), program management (11 items), monitoring and evaluation (13 items), and resources and information (15 items). The strategic planning deals with the function of the planning staff and committees, community data analysis, the feasibility of the program, and the approach methods for attaining the goal of the program. The program management includes items on the qualification and power of the program staff. Monitoring and evaluation deals with the planning and education for monitoring, reporting and communication among program units, and feedback after monitoring. Finally, the resource and information covers the planning and activities for obtaining resources and information, community networking, beneficiaries' response, and consulting activity of the staff.

Multi-Robot Path Planning for Environmental Exploration/Monitoring (미지 환경 탐색 및 감시를 위한 다개체 로봇의 경로계획)

  • Lee, Soo-Yong
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.5
    • /
    • pp.413-418
    • /
    • 2012
  • This paper presents a multi-robot path planner for environment exploration and monitoring. Robotics systems are being widely used as data measurement tools, especially in dangerous environment. For large scale environment monitoring, multiple robots are required in order to save time. The path planner should not only consider the collision avoidance but efficient coordination of robots for optimal measurements. Nonlinear spring force based planning algorithm is integrated with the spatial gradient following path planner. Perturbation/Correlation based estimation of spatial gradient is applied. An algorithm of tuning the stiffness for robot coordination is presented. The performance of the proposed algorithm is discussed with simulation results.

Integrating GIS, GPS, and Optimization Technologies for Pick-up/Delivery Service (소포 집배송 서비스를 위한 GIS, GPS 및 최적화 기술의 통합)

  • Jung Hoon;Lim Seung-Kil
    • Korean Management Science Review
    • /
    • v.21 no.3
    • /
    • pp.115-127
    • /
    • 2004
  • In this paper, we describe an intelligent monitoring and control system for pick-up/delivery service. This system applies geographical information system(GIS), global positioning system(GPS) and wireless communication technologies for managing pick-up/delivery operations more effectively. It consists of three subsystems, pick-up/delivery sequence planning system, pick-up/delivery monitoring system, and PDA execution system. Pick-up/delivery sequence planning system generates routes and schedules for pick-up/delivery using GIS and optimization techniques. Pick-up/delivery monitoring system monitors current positions of vehicles and actual pick-up/delivery results as compared with planned routes and visit times, while PDA execution system transmits information for vehicles positions and actual pick-up/delivery results using GPS and wireless communication technologies. The intelligent monitoring and control system is currently being used for the pick-up parcel service in a local post office of Korea Post.

A Study on the Improvement of Planning and Monitoring for the Rural Center Village Development Project (농촌중심지 마을만들기를 위한 계획수립과 모니터링 개선 방안)

  • Kang, Sin-Gil;Choi, Young-Wan;Kim, Keun-Ho;Kim, Young-Joo
    • Journal of Korean Society of Rural Planning
    • /
    • v.24 no.3
    • /
    • pp.117-125
    • /
    • 2018
  • After it was reorganized as the rural center revitalization project recently, there is an opinion that the nature of the project was changed to solve long-time aspired projects of some districts unlike various projects according to the previous project purposes. Therefore, this study analyzes the current status of revitalization project plans and operation monitoring to make rural center villages, establishes plans that can be applied to the rural center village revitalization project and suggests the improvement plans for monitoring. With the necessity of connectivity with centrality analysis for long-term and sustainable growth of the rural center revitalization project, the analysis on the 8 districts' centrality analysis and the function of the master plan were compared and analyzed, but there is not enough interrelation. Regarding the consulting methods for weak districts to activate facility operation after the project is implemented, the field consulting performed by the collaboration of Gyeongsangnam-do government, Gyeongnam Rural Revitalization Support Center and Gyeongnam branch of Korea Rural Community Corporation shows 87.6% of satisfaction level, which indicates it is the most effective. Based on the above results, it is necessary to reinforce the methods on resident demand survey, dimension and the reflection process of the project when preliminary plans are established for effective implementation of the rural center village revitalization project. It is also necessary to revise relevant standards not to change preliminary plans excessively during the master plan establishment process, and to oblige preliminary investigation of experts. The joint monitoring and consulting systems of experts and local governments should be applied from the establishment stage of the master plan, so that it can be sustainable rural center village revitalization project.