• Title/Summary/Keyword: prefabricated shear wall

Search Result 3, Processing Time 0.019 seconds

Test on the anchoring components of steel shear keys in precast shear walls

  • Shen, Shao-Dong;Pan, Peng;Li, Wen-Feng;Miao, Qi-Song;Gong, Run-Hua
    • Smart Structures and Systems
    • /
    • v.24 no.6
    • /
    • pp.783-791
    • /
    • 2019
  • Prefabricated reinforced-concrete shear walls are used extensively in building structures because they are convenient to construct and environmentally sustainable. To make large walls easier to transport, they are divided into smaller segments and then assembled at the construction site using a variety of connection methods. The present paper proposes a precast shear wall assembled using steel shear keys, wherein the shear keys are fixed on the embedded steel plates of adjacent wall segments by combined plug and fillet welding. The anchoring strength of shear keys is known to affect the mechanical properties of the wall segments. Loading tests were therefore performed to observe the behavior of precast shear wall specimens with different anchoring components for shear keys. The specimen with insufficient strength of anchoring components was found to have reduced stiffness and lateral resistance. Conversely, an extremely high anchoring strength led to a short-column effect at the base of the wall segments and low deformation ability. Finally, for practical engineering purposes, a design approach involving the safety coefficient of anchoring components for steel shear keys is suggested.

Pseudo-dynamic test of the steel frame - Shear wall with prefabricated floor structure

  • Han, Chun;Li, Qingning;Jiang, Weishan;Yin, Junhong;Yan, Lei
    • Steel and Composite Structures
    • /
    • v.20 no.2
    • /
    • pp.431-445
    • /
    • 2016
  • Seismic behavior of new composite structural system with a fabricated floor was studied. A two-bay and three-story structural model with the scale ratio of 1/4 was consequently designed. Based on the proposed model, multiple factors including energy dissipation capacity, stiffness degradation and deformation performance were analyzed through equivalent single degree of freedom pseudo-dynamic test with different earthquake levels. The results show that, structural integrity as well as the effective transmission of the horizontal force can be ensured by additional X bracing at the bottom of the rigidity of the floor without concrete topping. It is proved that the cast-in-place floor in areas with high seismic intensity can be replaced by the prefabricated floor without pouring surface layer. The results provide a reliable theoretical basis for the seismic design of the similar structural systems in engineering application.

Cyclic load experiment study on the laminated composite RC walls with different concrete ages

  • Zhang, Hongmei;Lua, Xilin;Li, Jianbao;Liang, Lin
    • Structural Engineering and Mechanics
    • /
    • v.36 no.6
    • /
    • pp.745-758
    • /
    • 2010
  • 12 typical laminated composite reinforced concrete (RC) walls with different concrete ages and 3 cast-in-place RC walls subjected to low frequency cyclic load were carried out in this study. The failure mode, force-deformation response and energy dissipation capacity of these specimens were investigated. Differences of structural behaviours between composite RC walls and common cast-in-place RC walls were emphasized in the analysis. The compatibility of the composite specimens with different concrete ages was discussed based on the experiment. Test results indicated that the differences between the lateral bearing capacity and the displacement ductility of the composite walls and the common walls were not so obvious. Some of the composite specimen even has higher bearing capacity under the experiment loading situation. Besides, the two parts of the laminated composite specimens demonstrates incompatibility at the later loading sequence on failure mode and strain response when it is in tension. Finally, this laminated composite shear walls are suggested to be applied in rapid reconstruction structures which is not very high.