• Title/Summary/Keyword: prestressed concrete box

Search Result 124, Processing Time 0.03 seconds

Behavior of optimized prestressed concrete composite box-girders with corrugated steel webs

  • Lu, Yanqiu;Ji, Lun
    • Steel and Composite Structures
    • /
    • v.26 no.2
    • /
    • pp.183-196
    • /
    • 2018
  • The traditional prestressed concrete composite box-girders with corrugated steel webs have several drawbacks such as large deflection and potential local buckling. In this study, two methods were investigated to optimize and improve the prestressed concrete composite box-girders with corrugated steel webs. The first method was to replace the concrete bottom slab with a steel plate and the second method was to support the concrete bottom slab on the steel flanges. The behavior of the prestressed concrete composite box-girders with corrugated steel webs with either method was studied by experiments on three specimens. The test results showed that behavior of the optimized and upgraded prestressed concrete composite box-girders with corrugated steel webs, including ultimate bearing capacity, flexural stiffness, and crack resistance, is greatly improved. In addition, the influence of different shear connectors, including perfobond leisten (PBL) and stud shear connectors, on the behavior of prestressed concrete composite box-girders with corrugated steel webs was studied. The results showed that PBL shear connectors can greatly improve the ultimate bearing capacity, flexural stiffness and crack resistance property of the prestressed concrete composite box-girders with corrugated steel webs. However, for the efficiency of prestressing introduced into the girder, the PBL shear connectors do not perform as well as the stud shear connectors.

Nonlinear Analysis of Prestressed Concrete Box Girder Bridges Using Macro Element (매크로요소를 이용한 프리스트레스트 콘크리트 박스거더 교량의 비선형 해석)

  • Oh, Byung-Hwan;Lee, Myung-Kue
    • Magazine of the Korea Concrete Institute
    • /
    • v.11 no.1
    • /
    • pp.77-87
    • /
    • 1999
  • The conventional design of prestressed concrete box girder bridges has been based on the linear elastic analyses using simplified geometric models. To overcome the restriction involved in the simplifications, a macro element for the rational analysis of prestressed concrete box girder bridges with variable cross sections is incorporated in the present analysis. Through the adoption of nonlinear material models, the behaviour of prestressed box bridges up to ultimate loading stage can be examined. The time dependent material models included in the present macro element code enable to predict the long term behaviour of prestressed concrete box girder bridges. The proposed macro element code with the nonlinear material models and time dependent routines can be efficiently used for the realistic analysis of prestressed concrete box girder bridges with arbitrary shapes.

Development of Macro Element for the Analysis of Prestressed Concrete Box Girder Bridges (프리스트레이트 콘크리트 박스거더교량 해석을 위한 매크로요소의 개발 및 유한요소 정식화(1))

  • 오병환;이명규
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.04a
    • /
    • pp.436-441
    • /
    • 1997
  • A Formulation based on macroelement concept is developed to analysis the prestressed concrete box girder bridges. The proposed method enables to model the arbitrary shapes and boundary conditions of prestressed concrete box girder bridges. The validity of the algoriyhm is demonstrated through comparisons with other results.

  • PDF

Prestress and excitation force identification in a prestressed concrete box-girder bridge

  • Xiang, Ziru;Chan, Tommy H.T.;Thambiratnam, David P.;Nguyen, Andy
    • Computers and Concrete
    • /
    • v.20 no.5
    • /
    • pp.617-625
    • /
    • 2017
  • Prestress force identification (PFI) is crucial to maintain the safety of prestressed concrete bridges. A synergic identification method has been proposed recently by the authors that can determine the prestress force (PF) and the excitation force simultaneously in prestressed concrete beams with good accuracy. In this paper, the ability of this method in the application with prestressed concrete box-girder bridges is demonstrated. A reasonable assumption is made to capture the similarity of the dynamic behavior of the prestressed concrete box-girder bridge and a beam under a certain loading scenario, and the feasibility of this method for application in a prestressed box-girder bridge is affirmed. A comprehensive laboratory test program is conducted, and the effects of PF, excitation, measuring time and uncertainties are studied. Results show that the proposed method can predict the PF and the excitation force in a prestressed concrete box-girder accurately and has a great robustness against uncertainties.

A Study on the Behavior of Prestressed Concrete Box Girder Bridges According to material Properties (재료특성치의 변화로 인한 프리스트레스트 콘크리트 박스거더 교량의 거동분석)

  • 오병환;양인환;김의성;최인혁;김세훈
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1997.10a
    • /
    • pp.627-632
    • /
    • 1997
  • Recently, the prestressed concrete box girder bridges are increasingly built at various locations in the world. The mechanical and structural behavior of prestressed concrete brides varies because of time-dependent material properties and sequential change of structural system due to stepwise construction. The time-dependent behavior of concrete is of importance in the design and construction of segmentally constructed and cast-in-place prestressed concrete box girder bridges. The structural response is affected b variations in creep, shrinkage properties of concrete. In this study, the example of time-dependent deformations is extended to establish how the variability in concrete properties affects the accuracy of the calculated deformations in such a bridge, and finally the results are discussed.

  • PDF

Design of Diaphragm of Prestressed Concrete Box Bridge by Strut-Tie Model (스트럿-타이 모델에 의한 프리스트레스트 콘크리트 박스교 격벽부의 상세 설계)

  • 선민호;김영훈;송하원;변근주
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.39-46
    • /
    • 1998
  • This paper is about design for diaphragm of prestressed concrete box bridge using strut-tie model. In this paper, equivalent loads for the diaphragm are computed by considering loading conditions on continuous prestressed concrete box bridge and analyses for both longitudinal section and transverse section of the diaphragm an done by considering the equivalent loading and the prestressing. Based on principal stress trajectory obtained from the analyses, strut-tie model for each sections are constructed. By analyzing the constructed strut-tie model for each sections, the amounts and the locations of reinforcement for the diaphragm are obtained. The application of strut-tie model in this paper shows that the design by soul-tie model for the diaphragm of prestressed concrete box bridges can be rationally performed.

  • PDF

Nonlinear Analysis of the Segmentally Erected Prestressed Concrete Box-Girder Bridges and Post-Processing (PC 박스거더교량의 시공단계별 비선형 해석 및 후처리 기법)

  • 오병환;강영진;이형준;이명규;홍기증;김영진;임선택
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.10a
    • /
    • pp.368-373
    • /
    • 1994
  • Recently, a large number of box girder bridges with cantilevered decks have been constructed. Especially, segmentally erected prestressed concrete box girder bridges are widely used as economic and aesthetic solutions for long span bridges. Segmental erection is a particularly attractive construction alternative in cases where continuously supported formwork is impractical or uneconomical. In segmentally erected bridges, the structural systems are changed as the construction stages are progressive and redistribution of member forces occurs due to time dependent effects of concrete and relaxation of prestressing steel. Then, in segmentally erected bridges, analysis are required at each construction states. In this study, nonlinear analysis progam of the segmentally erected prestressed concrete box girder bridges is developed in taking into account nonlinearity of material and geometry, time dependent effect of concrete and relaxation of prestressing steel.

  • PDF

Cracking behavior of transversely prestressed concrete box girder bridges (횡방향 프리스트레스트 박스거더의 균열거동 연구)

  • Oh, Byung-Hwan;Choi, Young-Choel
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2005.05a
    • /
    • pp.303-306
    • /
    • 2005
  • The cracking behavior of prestressed concrete members is important for the rational design of prestressed concrete structures. However, the test data on the cracking behavior of prestressed concrete structures are very limited. The purpose of the present study is to investigate the crack spacing and crack width in transversely post-tensioned decks of concrete box girder bridges under applied loading. For this purpose, large scale test members of concrete box girder segments were fabricated and tested. The crack widths, crack spacings and crack patterns were investigated for various load levels. The crack widths and steel strains were continuously monitored during the loading process. To derive a rational predicton equation for crack width, the bond characteristics of post-tensioned steel and nonprestressed rebar in the PSC members were explored first. This was done by measuring the strains of prestressing steel and nonprestressed rebar in the test members under loading. A simple equation for the prediction of maximum crack width in transversely post-tensioned concrete one-way slabs is proposed by considering bond characteristic of prestressing steel and nonprestressed reinforcement. The comparison of proposed equation with experimental data shows good correlation. The present study indicates that ACI and CEB-FIP code equations exhibit rather large deviation from test data on prestressed concrete members.

  • PDF

Thermo-mechanical behavior of prestressed concrete box girder at hydration age

  • Zhang, Gang;Zhu, Meichun;He, Shuanhai;Hou, Wei
    • Computers and Concrete
    • /
    • v.20 no.5
    • /
    • pp.529-537
    • /
    • 2017
  • Excessively elevated temperature can lead to cracks in prestressed concrete (PC) continuous bridge with box girder on the pier top at cement hydration age. This paper presents a case study for evaluating the behavior of PC box girder during the early hydration age using a two-stage computational model, in the form of computer program ANSYS, namely, 3-D temperature evaluation and determination of mechanical response in PC box girders. A numerical model considering time-dependent wind speed and ambient temperature in ANSYS for tracing the thermal and mechanical response of box girder is developed. The predicted results were compared to show good agreement with the measured data from the PC box girder of the Zhaoshi Bridge in China. Then, based on the validated numerical model three parameters were incorporated to analyze the evolution of the temperature and stress within box girder caused by cement hydration heat. The results of case study indicate that the wind speed can change the degradation history of temperature and stress and reduce peak value of them. The initial casting temperature of concrete is the most significant parameter which controls cracking of PC box girder on pier top at cement hydration age. Increasing the curing temperature is detrimental to prevent cracking.

Long Term Behavior and Analysis of Full Span Precast Segmental Bridge (풀스팬 프리캐스트 세그먼트 교량의 해석 및 장기거동 해석)

  • 오병환;채성태;정상화;박지언
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.434-441
    • /
    • 1999
  • The newly proposed Precast Segmental Mettled (PSM), which makes use of precast elements for election, is relatively new, efficient and fast mettled for the construction of prestressed box girder bridges. A precast segment of 25m long pretensioned in the fabrication yard is transported by a special trailer and a launching truss to its final position. The segments are then connected in the site by post-tensioning to make a continuous prestressed concrete box girder bridges. The purpose of this parer is to analyze and evaluate the design of precast prestressed concrete box girder bridges. The detailed analyses including time-dependent behavior of PSM bridges are conducted. The major results and findings, which have been obtained from finite element analysis of PSM bridge, are discussed in this paper and these results will be a good base for the design and analysis of a new precast bridges.

  • PDF