• Title/Summary/Keyword: prevention of claim

Search Result 52, Processing Time 0.032 seconds

Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects (공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발)

  • Shin, Chang-Joon;Kim, Yoon-Kyum;Cho, Kyu-Man;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.13-22
    • /
    • 2011
  • Many studies on cause and prevention of claim have been carried out but they were mostly intended to come up with the improvement measures, improvement system or the measures to deal with the claim, which consequently lacked the substantial ways to identify the details of claim for prevention purpose. That is, there's in fact no tool, in preparation for potential claims, to identify and review the major potential causes at design stage to mitigate the claim and thus, it's necessary to develop the tool such as checklist needed to prepare the claim-supporting documents, check the relevant laws as well as to identify the cause of claim. Hence the study, given the fact that cause of claim is mostly generated at the design stage though the claim itself tends to occur at the construction stage, was aimed at developing the checklist based on contract document such as design documents at design stage for public construction projects in a bid to prevent the potential claim occurred at the design stage.

Occupational Injuries Among Construction Workers by Age and Related Economic Loss: Findings From Ohio Workers' Compensation, USA: 2007-2017

  • Harpriya Kaur;Steven J. Wurzelbacher;P. Tim Bushnell;Stephen Bertke;Alysha R. Meyers;James W. Grosch;Steven J. Naber;Michael Lampl
    • Safety and Health at Work
    • /
    • v.14 no.4
    • /
    • pp.406-414
    • /
    • 2023
  • Background: This study examined age-group differences in the rate, severity, and cost of injuries among construction workers to support evidence-based worker safety and health interventions in the construction industry. Methods: Ohio workers' compensation claims for construction workers were used to estimate claim rates and costs by age group. We analyzed claims data auto-coded into five event/exposure categories: transportation incidents; slips, trips, and falls (STFs); exposure to harmful substances and environments; contact with objects and equipment (COB); overexertion and bodily reaction. American Community Survey data were used to determine the percentage of workers in each age group. Results: From 2007-2017, among 72,416 accepted injury claims for ~166,000 construction full-time equivalent (FTE) per year, nearly half were caused by COB, followed by STFs (20%) and overexertion (20%). Claim rates related to COB and exposure to harmful substances and environments were highest among those 18-24 years old, with claim rates of 313.5 and 25.9 per 10,000 FTE, respectively. STFs increased with age, with the highest claim rates for those 55-64 years old (94.2 claims per 10,000 FTE). Overexertion claim rates increased and then declined with age, with the highest claim rate for those 35-44 years old (87.3 per 10,000 FTE). While younger workers had higher injury rates, older workers had higher proportions of lost-time claims and higher costs per claim. The total cost per FTE was highest for those 45-54 years old ($1,122 per FTE). Conclusion: The variation in rates of injury types by age suggests that age-specific prevention strategies may be useful.

CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project - (건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 -)

  • Yoon Jun-Seon;Seo Choon-Taek
    • Journal of Arbitration Studies
    • /
    • v.15 no.1
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

Development of Natural Hazard Risk Map using Insured Claim Payouts and Its Application (보험 손실액을 활용한 자연재해 위험 지도 개발 및 적용방안 연구)

  • Kim, Ji-Myong;Park, Young Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.257-258
    • /
    • 2015
  • The amount of damages caused by natural hazards is consistently growing due to the unusual weather and extreme events. At the same time, property damage by natural hazards is rapidly increasing as well. Hence, we need systematic anti-disaster activities and consulting that can react to such a situation. To address these needs, we investigated and analyzed insured claim payouts from natural hazards by administrative area, and calculate the risk index utilizing GIS. According to the index, this map is identifying the areas of greatest natural hazard risk. The ranking of natural disaster vulnerability based on the risk index, and risk grades were divided into five based on the ranking. This map integrates the natural hazard losses to assist in comprehensive and effective loss prevention activities using analysis of regional loss claims from natural hazards. Moreover, this map can be as utilized as loss mitigation and prevention activities to verify the distribution of exposure and hazards.

  • PDF

A Sduty of Analyzing Claim Factor and Making Strategies to Prevent Claim in Bidding and Contracting Stage for Architectural Turn-Key Project (건축턴키공사 입찰.계약 단계에서의 클레임 예방을 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내대형건축턴키공사 사례중심으로 -)

  • 윤준선;백준홍
    • Journal of Arbitration Studies
    • /
    • v.13 no.2
    • /
    • pp.353-376
    • /
    • 2004
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

A Study on a System of Resolving Claim according to the Delay of Construction Projects - Focus on Liquidated Damages - (공기지연에 따른 클레임 대응방안에 관한 연구 - 지체상금을 중심으로 -)

  • 이영민;이상범;김정길
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.111-116
    • /
    • 2002
  • The delay of the completion of the construction project occurs frequently because the origin schedule is affected by numerous factors that contribute to the overall delay in completing the project. But in our country. the dealing with a claim is not sufficient yet by reasons of fairl relation between owner and constructor, cognitive shortage in claim, and such. especially they have make a wrong application of baseless the rule. In this study. we make a rational model ; that includes calculating of dispute costs, and suggest the solution and the prevention for claim by considerating the law followed liquidated damages.

  • PDF

A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project - Focusing on Domestic Project - (건축턴키공사 초기 단계에서의 클레임 방지를 위한 클레임요인 분석 및 대응방안에 관한 연구 - 국내공사 사례중심으로 -)

  • Yoon Jun-Seon;Yoo Byoung-Eok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.93-99
    • /
    • 2006
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Proposing the response devices to the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

Developing of Construction Project Risk Analysis Framework by Claim Payout and its Application

  • Kim, Ji-Myong;Park, Young Jun;Kim, Young-Jae;Yu, YeongJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.192-194
    • /
    • 2015
  • The growing size and complex process in construction project recently leads to increase risk and the losses as well. Even though researchers have identified the major risk indicators, there is lack of comprehensive and quantitative research for identifying the relationship between the risk indicators and economic losses associated with construction projects. To address this shortage of research, this study defines risk indicators and create a framework to assess the influence of economic losses from the indicators. An insurance company's claim payout record was accepted as the dependent variable to reflect the real economic losses. Based on the claims, we categorized the causes and results of accidents. To establish framework, built environment vulnerability indicators and geographical vulnerability indicators were employed as the risk indicators. A Pearson correlation analysis was adopted to validate the relationship with loss ratio and risk indicators. Consequently, this framework and its results may offer significant references for under writers of insurance companies and loss prevention activities.

  • PDF

Analysis and Prevention Countermeasures of Claim factors in Domestic Apartment Construction (국내 아파트공사의 클레임요인 분석 및 예방대책)

  • Lim Jong-Chan;Song Yong-Sik;Kim sun-kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.341-344
    • /
    • 2002
  • Claims are on an increasing trend in the domestic construction field with changes of negative thought about them. But there are still many factors of causing disputes Potentially due to old customs that an owner is predominant over a contractor. Unless these factors are solved, it is obvious that many disputes will occur henceforward. This study derives claim factors that must be solved first of all through analyzing how claim factors influence construction management factors such as time, cost, quality, and presents countermeasures that may prevent these claims.

  • PDF