• Title/Summary/Keyword: prevention projects

Search Result 228, Processing Time 0.026 seconds

Estimation of Post Evaluation Index of Natural Disaster Prevention Projects using Structure Equation Modeling (구조방정식모델을 이용한 자연재해예방사업의 사후 평가 지수 산정)

  • Heo, Bo Young;Song, Jai Woo;Yoon, Sei Eui;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.6
    • /
    • pp.1807-1814
    • /
    • 2014
  • Natural disaster has been hard to prevent the occurrence of itself, thus in order to reduce the economic damages and loss casualties, it is important to be prepared in cases that the disasters should occur in advance. Interest of the related project to prevent various natural disasters has been grown along with an investment in Korea. Along with this movement, when investments related to natural disaster prevention projects were built on, the post evaluation that can verify the ripple effects of those investments on the community should be emerging as an essential task. For evaluating the effects of public investment projects such as natural disaster prevention projects in this study, the related researches would continue through qualitative analyses, for example, cost-benefit analysis. Even the qualitative analysis alone cannot fully explain the effects of those projects, the diverse methods of analyzing and evaluating those effects might not have been presented in those fields. For the post evaluation of natural disaster prevention projects through the qualitative analysis, this study derived subjects that had effects on the post evaluation of natural disaster prevention projects. Also, employing the structural equation modeling (SEM), the causation between post evaluation subjects and the effects of projects were quantitatively analyzed, and the weighting factors of evaluation items were calculated respectively. Based on these results, post evaluation index formula was proposed for the natural disaster prevention projects in Korea.

A Framework for developing the automated management system of environmental complaints in construction projects

  • Hong, Juwon;Kang, Hyuna;Hong, Taehoon;An, Jongbaek;Jung, Seunghoon
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.417-422
    • /
    • 2020
  • Vast quantities of environmental pollutants from construction projects are causing significant damage to nearby local communities and thus generate environmental complaints. The construction company, responsible for compensating and resolving environmental complaints, suffers economic damages due to additional expenditures and schedule delays in construction projects. Meanwhile, the construction industry can stagnate from a broader perspective. Therefore, this study aimed to propose a framework for developing an automated management system which consists of two models for environmental complaints in construction projects: (i) the prediction model: a model for predicting environmental complaints based on factors related to environmental complaints; and (ii) the prevention model: a model for providing construction companies with the optimal prevention measure to effectively prevent environmental complaints according to the results of the prediction model. In addition, the algorithm for integrating the developed models into the management system in construction projects was proposed. Eventually, the application of the management system to construction projects can ensure the profitability of construction companies and mitigate damage from environmental pollutants to the nearby local community.

  • PDF

On Efficient Implementation of the Regeneration Projects for the Zones Vulnerable to Natural Disasters (자연재해위험지구 정비사업의 효율적인 추진방안 연구)

  • Kim, Seonguen;Cho, Woncheol;Lee, Taeshik;Shim, Jaehyun
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.1
    • /
    • pp.45-51
    • /
    • 2008
  • The purpose of this study is to suggest some effective ways to implement the regeneration projects for the zones vulnerable to natural disasters which have been delayed due to shortage of the financial resources, and thereby complete the disaster prevention projects as early as possible and thus secure the financial resources for the projects continuously. For this purpose, the researcher reviewed the statutory grounds and designation procedures or the zones vulnerable to natural disasters, and thereupon, examined and analyzed the regeneration projects being implemented in Gyeonggi-do in view of contents by zone, history of damages, annual investment plans and financial resources for investments. In addition, the researcher examined the criteria for reserve of the disaster management fund and its uses and investigated the fund sources and expenditures and thereby, addressed the problems of the statutory reserve and suggested their solutions. All in all, the researcher suggested that the disaster management fund should be invested in regeneration projects for the zones vulnerable to natural disasters in order to remove the disaster risks earlier and that the uses of the fund should be adequately deregulated with a reserve fund ceiling system to secure the financial resources for the disaster prevention projects continuously.

  • PDF

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

A Study on the Priority Making of Human Error Prevention Business Using AHP (계층화분석기법(AHP)을 이용한 철도 인적오류 예방 사업의 우선순위 분석 연구)

  • Han, Kee-Youl;Back, You-Seoung
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.3
    • /
    • pp.111-117
    • /
    • 2012
  • In this paper to prevent human errors analyzed the causes of railway accidents and human error in last 5 years(2007~2011). The 2nd Railway Comprehensive Safety Plan currently being implemented in the safety business for prevention of human error. The accidents are often resulted from multiple causes with hardware failure and human errors. And prevention of human error associated with the implementation details of the priority projects, 14 projects were selected by draw. Then Analytic Hierarchy Process(AHP) methodology was used to select what projects were effective to human error.

System Thinking on Diabetes Prevention and Management (당뇨병 예방 및 관리의 시스템 사고)

  • Noh, Young-Min;Lee, Ji-Uhn;Park, Jun-Hee;Choi, Nam-Hee;Homer, Jack B.;Yun, Eun-Kyoung
    • Korean System Dynamics Review
    • /
    • v.17 no.1
    • /
    • pp.25-40
    • /
    • 2016
  • This research aims to identify important variables and their effects on diabetes prevention or progression from prediabetes to diabetic complication using system thinking. Based on the existing studies, we have constructed a causal loop diagram explaining dynamics of diabetes and have found 7 important reinforcing loops and 3 balancing loops in the causal loop diagram. The CLD displays an effect of increasing prediabetes early detection and awareness on diabetes prevention. The findings indicate that the projects in Korea for reducing incidence of diabetes and potential risk of complication have focused on variables which are related only on diabetes even though prediabetes has been a critical point on diabetes prevention and management. Thus, it also concludes that the effect of projects focusing only on diabetes have faced limitation to manage diabetes accordingly.

A Study on the Methodology for planning Construction Accident Prevention (건설안전 대책수립의 방법론에 관한 연구)

  • Son, Ki-Sang
    • Journal of the Korean Society of Safety
    • /
    • v.2 no.1
    • /
    • pp.43-49
    • /
    • 1987
  • Currently, Safety accidents have been raised & more concerned despite that Government has emphasized on preventing accidents in construction area of Korea. An accident is due to several causes of it, thus this the study, as the above, will specify the methodology to establish more effective safety prevention plan, itself, compared to most studies being based on a case, specially for the projects under Far-East District, Corps of Engineers, USA. Additionally, this study will be limitted for performance method and the projects will not be classified with the same sorts as domestic ones are.

  • PDF

A Study on Selection of Media to Communicate Information for Raising Awareness of Soil Erosion Control Projects (사방사업 인지도 확산을 위한 정보전달 매체 선정 연구)

  • Ryu, Yoon-Jin;Cho, Dong-Gil;Youn, Ho-Jung;Lee, Chang-Woo;Lee, Ji-Hyun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.21 no.2
    • /
    • pp.1-11
    • /
    • 2018
  • As a result of climate change, mountain sediment disasters due to localized heavy rain and mountain development are occuring more frequently, thus, increasing social attention to and demand for soil erosion control projects. However, since 2011 Seoul Wumyeon Mountain landslide, the public is expressing increasing anxiety as well as negative perception regarding defective project results. Therefore, this study investigated promotional terms and information media related to soil erosion control projects according to the consumer in order to increase awareness of soil erosion control projects. In this study, the information consumers were divided into experts and the general public and conducted a survey related to promotional terms and media for communicating relevant information. In the result, the experts chose landslide prevention and recovery projects (41.8%) as an appropriate promotional term for soil erosion control projects. The general public, however, chose mountain sediment disaster prevention projects (32.5%) as the appropriate promotional term. However, the analysis showed that it would be necessary to develop an promotional term that can encompass the concept of 'disaster prevention' including forest and soil disaster as the word 'landslide' can suggest soil erosion control is limited to landslides only. In the survey regarding the media for communicating information related to soil erosion control projects according to the consumer type, the experts preferred radio and TV as media to communicate the relevant information, while, among the general public, the youths preferred social media such as Facebook and Twitter (22.22%) and adults radio and TV (34.07%), As for the most effective way to promote soil erosion control projects, the experts chose traditional promotinal media such as newspaper, radio, and TV (0.172) whereas the adults and youths preferred the internet and Facebook (0.089). It appears that using the preferred media for communicating information related to soil erosion control projects according to the consumer type will be effective way to promote soil erosion control projects.

A Case Study on CPTED Projects for Regeneration of Deteriorated Residential Area - Focused on Cases of 'Deokpo-dong', 'Chilsan-dong' and 'Sujeong-dong' in Busan City (노후주거지 재생을 위한 범죄예방 환경디자인 사업 사례연구 - 부산시 '덕포동', '칠산동', '수정동' 시행사례를 중심으로 -)

  • Choi, Kang-Rim
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.5
    • /
    • pp.16-30
    • /
    • 2016
  • There is an increasing interest in and efforts for safe residential environment from crimes nationwide. Many cities are making efforts to create safe residential environment by enacting ordinances and guidances on safe design for preventing crimes and implementing demonstration projects. In line with the trends of the times toward 'improvement of living conditions' through urban regeneration, the importance of the Crime Prevention Through Environmental Design(CPTED) has recently emerged in the field of residential housing regeneration. Indeed, the CPTED is included as essential factor in the recent deteriorated residential area regeneration related projects. In this respect, the purpose of this study is to provide the basic data on the methodology of CPTED to be applied to the regeneration of deteriorated residential area in the future. To this end, this study selected three representative CPTED projects in Busan - 'Deokpo-dong Hope and Stepping Stone Village,' 'Chilsan-dong CPTED Happiness Village' and 'Sujeong-dong Crime Prevention and Safe Village' as objects of this study and then investigated and analyzed project contents, application of CPTED strategy, subjects who are implementing projects, and the time when they implement projects as the framework of my analysis. The findings from this study are as follows: First, the projects that were largely based on hardware should be improved by including software in the future. Second, the current Step 2 should expand into Step 3 Maintenance in applying CPTED strategy. Third, it is necessary to encourage exchange and cooperation between unit projects and subjects who are operating related projects.

Proposal Methodology for Disaster Risk Analysis by Region Using RFM Model (RFM 모형을 활용한 지역별 재해 위험도 분석 방법론 제안)

  • Kim, TaeJin;Kim, SungSoo;Jeon, DaHee;Park, SangHyun
    • Journal of the Society of Disaster Information
    • /
    • v.16 no.3
    • /
    • pp.493-504
    • /
    • 2020
  • Purpose: The purpose of this study is to propose an analytical methodology for selecting the priority of preventive projects in the course of carrying out disaster prevention projects that improve disaster-hazardous areas. Method: Data analysis was performed using RFM model which can divide data grade and perform target marketing based on Recency, Frequency, and Monetary. Result: The top 10% of the area with high RFM value was mainly in the East Sea and the South Sea coast, and the number of damage in private facilities was high. Conclusion: In this study, we used the RFM model to select the priority of disaster risk and to implement the regional disaster risk using GIS. These results are expected to be used as basic data for selecting priority project sites for disaster prevention projects and as basic data in the decision-making process for disaster prevention projects.