• 제목/요약/키워드: primary wastewater treatment

검색결과 106건 처리시간 0.027초

화학적 처리에 의한 1차 하수처리장의 처리효과 개선 -현장시험을 중심으로- (Chemically Enhanced Primary Treatment at D Wastewater Treatment Plant)

  • 곽종운;김승현;이찬원
    • 상하수도학회지
    • /
    • 제11권1호
    • /
    • pp.99-108
    • /
    • 1997
  • This study examined the feasbility of upgrading D waste water treatment plant which treats incoming wastewater by primary sedimentation only. By adding 20-40 ppm of Hi-PAX into the outlet of the aerated grit chamber, BOD and SS removal efficiences were improved from 29% and 36% to 53 % and 73%,respectively. However, chemically enhanced primary treatment failed to meet the upcoming wastewater quality standard(BOD and SS <20 mg/l) consistently. This was suspected to result from the deteriorated plant return stream. The wastewater treatment by chemical treatment should have increased the amount of the sludge to be removed as the sludge production was increased. Chemically enhanced primary treatment is anticipated to consistently produce effluent of the 1996 standards quality by adjusting the amount of the sludge to be removed. Besides BOD and SS removal, chemically enhanced primary treatment resulted in the improved T-P removal from 30% to 64-74%. However, such benefit was not observed in T-N removal. Improved T-P removal will be expected to help control water pollution in Masan bay.

  • PDF

초기강우 유입 시 하수처리시설 일차 침전지 운전제어 전략 (Control strategy of primary clarifier operation in wastewater treatment plant during rainfall inflow)

  • 유광태;권혁재
    • 한국수자원학회논문집
    • /
    • 제52권11호
    • /
    • pp.947-950
    • /
    • 2019
  • 이 논문의 주요 특징은 초기강우 유입 시 일차 침전지 처리효율을 개선하기 위한 운전제어 전략을 제공하는 것이다. 최근 IoT 기술과 센싱 기술이 발전함에 따라 하수처리시설 운전제어를 위한 기반이 개선되고 있으며, 온라인 측정결과를 활용한 일차침전지 처리효율 개선에 따라 미처리 하수의 하천 유출을 최소화하고, 하수처리시설 운영효율 개선에기여할 수 있다.

하수처리수의 재이용을 위한 벼 재배시험 (Rice Cultivation with Reclaimed Wastewater Irrigation for Wastewater Reuse)

  • 강문성;박승우;김상민;성충현
    • 한국농공학회논문집
    • /
    • 제46권1호
    • /
    • pp.75-86
    • /
    • 2004
  • The objective of the research is to develop agricultural resue technologies of reclaiming the effluents from a municipal wastewater treatment plant and reusing for irrigated rice paddies. The Suwon wastewater treatment plant was selected for wastewater reuse tests. The control was the plots with groundwater irrigation (TR#1), the treatment (TR#2) using polluted stream water as it was, and three others using wastewater after treatment. Three levels of wastewater treatments were employed: the effluent from the wastewater treatment plant (TR#3), sand filtering after treatment plant(TR#4), and ultra-violet treatment after sand filtering (TR#5). The randomized block method was applied to wastewater application to paddy rice with five treatments and six replica. The effects of various wastewater treatment levels on water quality, paddy soil, crop growth, yields, and the health hazards were investigated. The primary results indicate that cultivating rice with reclaimed wastewater irrigation did not cause a problem to adverse effects on crop growth and yields. Overall, wastewater could be used as a practical alternative measure for reclaimed wastewater irrigation. However, long-term monitoring is recommended on the effects on soil chemical characteristics and its related health concerns.

활성슬러지법에 의한 고농도 중화학공장 폐수처리에 관한 연구 (Bench-Scale Evaluation of the Activated Sludge Process for Treatment of a High-Strength Chemical Plant Wastewater)

  • 조영하
    • 한국환경보건학회지
    • /
    • 제19권3호
    • /
    • pp.1-16
    • /
    • 1993
  • This paper describes an investigation to determine whether the activated sludge (AS) process could be used for the treatment of wastewater at the Union Carbide Coporation (UCC) plant in Seadrift, Texas. This plant presently utilizes a waste stabilization pond (WSP) system for treatment of the wastewater. The treatment system consists of an in-plant primary WSP and two off-plant WSPs (secondary and tertiary WSPs), run in series. The total hydraulic detention time of the WSP system is approximately 150 days. Several laboratory-based treatability studies have been conducted to evaluate the performace of the WSP system and the degradability of specific chemical compounds. From an additional study, it was determined that the WSP system was stressed and occasionally operating near the limit of its treatment capacity. The existing primary WSP plays an important role in the overall treatmemt system, because it not only functions as a pH and organic-strength equalization basin, but also serves as a "preconditioning" basin by fermenting high strength organic wastes to volatile organic acids for subsequent degradation in the escondary WSP. However, in view of pending RCRA legislatin conerning the "proposed organic toxicity characteristics limits" (40 CFR Part261: Federal Register, July, 1988), it is possible that the primary WSP will have to be abandoned in favor of alternative treatment options. Therefore the main purpose of this study was to perform activated sludge treatability evaluations for the development of an alternative to the existing primary WSP treatment ststem. In addition, another purpose was to determine the degradability of bis(2-chloroethyl)ether (Chlorex or CX) and benzene(BZ) in the activated sludge process. The presence of these two chemicals in the wastewater of the plant prompted the question of whatedether they could be degraded in an activated sludge system.

  • PDF

산업폐수 관리체계 개선을 위한 수질오염물질 배출목록 구축에 대한 연구: 1차 철강 제조업과 석유정제품 제조업 (A Study on the Water Pollutant Discharge Inventories for the Improvement of Industrial Wastewater Management System: Primary Steel Manufacturing Facility and Petroleum Refining Products Manufacturing Facility)

  • 안태웅;김동민;손대희;김재훈
    • 한국물환경학회지
    • /
    • 제36권5호
    • /
    • pp.453-467
    • /
    • 2020
  • This study aimed to inventory the water pollutant discharge of wastewater from two facilities, one primary steel manufacturing facility and one petroleum refinery, both of which are located in Korea, and to identify ways to improve the wastewater treatment process through field investigation. Probability evaluation was used to inventory the substances in polluted water. The samples collected in this study included original wastewater, on processing wastewater, and treated water. The general description of wastewater occurrence, major sources, and treatment facilities were also investigated to obtain an integrated database of the pollutants created by different industrial categories. Based on our analysis of raw wastewater and final effluent, the detected pollutants were confirmed by analyzing their presence in the raw or supplemental materials, the potential of formation as byproducts, and the possibility of inclusion as impurities. The compounds detected for each category were screened via investigation of their possible sources and confirmed as the final water pollutant inventories. Thirty kinds of water pollutants were emitted by the primary steel manufacturing facility (reference in case A), including 14 specified hazardous water pollutants. The petroleum refinery (reference in case B) emitted 36 water pollutants, including 16 specified hazardous water pollutants.

원전 일차계통 HyBRID 제염공정 발생 폐액 내 불순물 제거 및 분해 (Removal and Decomposition of Impurities in Wastewater From the HyBRID Decontamination Process of the Primary System in a Nuclear Power Plant)

  • 은희철;정준영;박상윤;박정순;장나온;원휘준;심지형;김선병;서범경
    • 방사성폐기물학회지
    • /
    • 제17권4호
    • /
    • pp.429-435
    • /
    • 2019
  • 원전 일차계통 HyBRID 제염공정에서 발생되는 제염폐액에는 황산이온과 방사성 핵종을 포함한 금속이온 및 발암성 물질의 하이드라진을 포함하고 있어 이를 안전한 수준으로 처리할 수 있는 기술개발이 필요하다. 본 연구에서는 모의 제염폐액내 황산 및 금속이온의 제거와 하이드라진의 분해시험을 실시하여 황산이온, 금속이온 및 하이드라진을 효과적으로 제거할 수 있는 HyBRID 제염폐액 처리공정을 도출하였으며, 1 L 규모에서의 반복실험과 Pilot 규모(300 L/batch)에서의 평가시험을 통해 도출한 HyBRID 제염폐액 처리공정의 성능 재현성과 적용성을 검증하였다.

정수장에서 발생된 탈수슬러지의 량에 의한 배출수처리시설용량에 대한 평가 (Estimation on the Design Capacities of Residuals Treatment Facilities by the Quantity of Dewatered Sludge Generated from Water Treatment Plants)

  • 문용택
    • 상하수도학회지
    • /
    • 제18권6호
    • /
    • pp.715-723
    • /
    • 2004
  • The quantity of residuals generated from water treatment plants depends upon the raw water quality, dosage of chemicals used, performance of the treatment process, method of sludge removal, efficiency of sedimentation, and backwashing frequency. Sludge production by the physical separation of SS occurs under quiescent conditions in the primary clarifier, where suspended solids are allowed to settle and to consolidate on the clarifier bottom. Raw primary sludge results when the settled solids are hydraulically removed from the tank. The relative solid and liquid fractions of a slurry are most commonly described by the solids concentration, expressed as mg/L or percent solids. The purpose of the present investigation is to estimate a suitability on the design capacities of residuals treatment facilities by the quantity of dewatered sludge generated from water treatment plants.

의암호 유역에서 발생하는 자체생산 유기물 저감방안에 관한 연구 (The Study on Decline Plan of Primary Production Organic Matter of Uiam Lake Basin)

  • 허인량;이건호;함광준;최지용;정의호
    • 한국환경보건학회지
    • /
    • 제30권1호
    • /
    • pp.50-58
    • /
    • 2004
  • The present study was designed to evaluate primary production organic matter in basin of lake around by execution of total maximum daily loading. BOD influent loading of Uiam lake was 2,819 kg/day, which was less then 28.3 percent, total effuluent loading as 3,619 kg/day, in comparision with BOD, total nitrogen influent loading was 4,681 kg/day, which was less then 10.0 percent, total effuluent loading as 5,150 kg/day. But in case of total phosphors influent loading was 73.3 kg/day, which was more then 34.2 percent, total run off loading as 48.3 kg/day. The result of survey reduction plan of primary production organic matter in basin of lake around which objectives of abstract is as follows. First plan was reduction of primary production organic matter by moving the outlet of municipal wastewater treatment center from present place to lake downstream. Secondary plan was improvement by diffusion type of outlet municipal wastewater treatment center. The third plan was reduction of environmental impact by passing and storing of municipal wastewater. Finally plan was decline water surface level which was present hydrouric retention time was reduction from 7.6 day to 6.0 day per meter.

CFD를 이용한 농축조 슬러지의 유출흐름특성 해석 (Analysis of the sludge thickening characteristics in the thickener using CFD Model)

  • 박노석;문용택;김병군;김홍석
    • 상하수도학회지
    • /
    • 제25권5호
    • /
    • pp.777-782
    • /
    • 2011
  • The residual treatment facilities in WTP(water treatment plant) play an important role in solid-liquid separation. At present, it is difficult to solve problems related with thickening and dewatering of WTP sludge, and discharging waste water to river. The quantity of residuals generated from water treatment plants depends upon the raw water quality, dosage of chemicals used, performance of the treatment process, method of sludge removal, efficiency of sedimentation, and backwashing frequency. Sludge production by the physical separation of SS(Suspended Solid) occurs under quiescent conditions in the primary clarifier, where SSs are allowed to settle and to consolidate on the clarifier bottom. Raw primary sludge results when the settled solids are hydraulically removed from the tank. In this study, Drawing characteristics of the sludge thickening in the thickener of Water Treatment Plants was simulated by Using CFD(Computational Fluid Dynamics.

고도처리공법이 적용된 하수처리시설에서의 공법적용의 적정성 평가 (Validity evaluation of wastewater treatment system applying advanced treatment processes)

  • 안준수;박태술;조정호
    • 한국산학기술학회논문지
    • /
    • 제11권10호
    • /
    • pp.4055-4068
    • /
    • 2010
  • 본 연구는 고도처리공법을 적용하여 수년간 가동 중인 하수처리시설에 대한 운전현황을 측정 분석하여, 고도처리공법 적용의 적정성을 평가하고자 하였다. 단위공정별 처리효율은, BOD의 경우 1차침전지 35, 생물반응조 87, 최종방류수 48 %, T-N의 경우 1차침전지 18, 생물반응조 40, 최종방류수 25 %, T-P의 경우 1차침전지 23,, 생물반응조 38, 최종방류수25 % 등으로, 각 단위공정별로 양호한 처리효율을 나타내었다. 생물반응조 내의 미생물 관측 결과, 다양한 종류의 세균과 원생동물 및 후생동물이 관측되었고, 담체의 세균 부착기능이 안정적으로 유지되고 있음을 알 수 있었다. 최종방류수질은 BOD 5.5, COD 9.9, SS 4.6, T-N 11.8, T-P 0.99 mg/L으로 방류수 수질기준보다 낮은 양호한 수질상태를 나타내었다.