• Title/Summary/Keyword: project deliverables

Search Result 24, Processing Time 0.022 seconds

Design and Implementation of an Ethereum-Based Deliverables Management System for Public Information Software Project (이더리움 기반 공공정보 소프트웨어 사업산출물 관리 시스템 설계 및 구현)

  • Lee, Eun Ju;Kim, Jin Wook
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.11 no.6
    • /
    • pp.175-184
    • /
    • 2022
  • Blockchain is being studied in various fields such as logistics, fintech, medical care, and the public sector. In the public information software project, some deliverables are omitted because the developed deliverables and the deliverables requested by the project management methodology do not match, and an additional process is required for payment. In this paper, we propose the deliverables management system for public information software project which is configured a distributed environment using the Ethereum blockchain and which has an automatic payment system only when all deliverables are approved. This system can keep the service available in case of system failure, provide transparency and traceability of deliverables management, and can reduce conflicts between the ordering company and the contractor through automatic payment. In this system, the information of deliverables is stored in the blockchain, and the deliverables that their file name is the hash value calculated by using the version information and the hash value of the previous version deliverable, are stored in the SFTP server. Experimental results show that the hash value of the deliverables registered by the contractor is correct, the file name of the deliverables stored in the SFTP server is the same as the hash value registered in the Ethereum blockchain, and the payment is made automatically to the Ethereum address of the contractor when all deliverables are approved.

Effective Management of Construction Information Using a XML Based Project Deliverable Management System (XML 데이터베이스를 활용한 성과물 관리 프로세스의 효과)

  • Moon, Sungwoo;Yang, Byungsoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.481-489
    • /
    • 2006
  • These days construction management is executed in an information technology environment, which creates a large volume of digital data. At the completion of a project, the contractor is required to transfer to the owner the digital data as project deliverables usually in a form of CD's. From an enterprise-wide view point, this traditional way makes the management of project deliverables ineffective as the data accumulated from different projects could be enormous. The objective of this paper is to propose a structured way to utilize a XML database for better management of project deliverables. The XML database provides an environment which users can access through a project deliverable management system (PDMS). A pilot of the PDMS has been developed to test the effectiveness of document control. The result of the test demonstrates that the effectiveness of project deliverable management can be increased by providing a high transportability and usability of data in the construction life cycle.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

RELATIONAL CONTRACTING: THE WAY FORWARD OR JUST A BRAND NAME?

  • Fiona Y.K. Cheung;Steve Rowlinson
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1013-1016
    • /
    • 2005
  • Accounts of the development of a successful construction project often stress the importance of team relationship, project environment and senior management commitment. Numbers of studies carried out in the past decades indicate there needs to be a change of culture and attitude in the construction industry. In order for a turn around in the industry, relational contracting approaches have become more popular in recent years. However, not all relational contracting projects were successful. This paper details the fundamental principles of relational contracting. It further reports findings of a research currently taking place in Australia, how effective is relational contracting in practice. The problem addressed in this research is the implementation of relational contracting: • Throughout a range of projects • With a focus on client body staff The context within which the research was undertaken is: • Empowerment, regional development and promotion of a sustainable industry • The participating organisations have experience of partnering and alliancing • Success has been proven on large projects but performance is variable • Need has been identified to examine skill sets needed for successful partnering/alliancing The practical rationale behind this research is that: • Partnering and alliancing require a change of mind set - a culture change • The Client side must change along with contracting side • A fit is required between organisation structure and organisation culture Research Rationale: The rationale behind this project has been to conduct research within participating organisations, analyse, rationalise and generalise results and then move on to produce generic deliverables and "participating organisation specific" deliverables. This paper sets out the work so far, the links between the various elements and a plan for turning the research output into industry deliverables.

  • PDF

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Assessment of BIM-Based Government Funded Projects at the Design Phase (BIM 적용 공공 프로젝트 설계단계의 평가 방안에 관한 연구)

  • Shin, Seung-Hyup;Ham, Nam-Hyuk;Kim, Jea-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.213-216
    • /
    • 2010
  • Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.

  • PDF

ACTION LEARNING TEACHING-LEARNING STRATEGY IN ARCHITECTURAL ENGINEERING DESIGN CLASSES

  • Myunghoun Jang;Hee-Bok Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.525-530
    • /
    • 2013
  • The importance of engineering design increases due to the expansion of engineering education certification. But there are not much teaching methods and examples of engineering design to be referred to the college classes. This paper introduces a new teaching and learning method of Action Learning adopted to a engineering design class in the Department of Architectural Engineering, J University in Korea. The class included a team project to find problems of facilities or safety management factors in a building construction site, and to provide the alternatives to solve the problems. The Action Learning helped to improve the learning effect of students and to increase the quality of the project deliverables.

  • PDF

A Software Quality Assurance Methodology and a Direction for Its Usage (SQA 활동 지원을 위한 방법론 및 그 활용방향)

  • 김성근;편완주
    • The Journal of Information Technology and Database
    • /
    • v.7 no.1
    • /
    • pp.113-130
    • /
    • 2000
  • As software projects become larger and more complex, we need to take a more systematic approach to quality assurance. One plausible approach is the use of SQA (software quality assurance) methodology. Since this SQA methodology was not available, our study presents a SQA methodology. This methodology has a repository in which a set of quality assurance tasks with their related techniques and deliverables is defined and from which one can select only appropriate tasks based upon characteristics of project. This study further suggests a rule-based approach for supporting task selection process.

  • PDF

Development of Work Breakdown Structure for Nuclear Power Plant (원자력발전소 Work Breakdown Structure 개발)

  • Cho, Yeong-Heock;Yang, Myung-Duck
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.52-53
    • /
    • 2014
  • The Work Breakdown Structure (WBS) is a primary tool which provides a framework that defines clear scope of all deliverables throughout the project life cycle. Once the WBS is established in projects, it should allow project team members to measure and manage work performances by the WBS; further, it should provide a reference point when any work scope needs to be redefined. Based on the project information in the Progress and Performance Measurement System (PPMS) of UAE's Barakha Nuclear Power Plant (BNPP) projects, an attempt was made to develop a new WBS which provides hierarchical and systematical decomposition of the total work scope of NPP construction projects while avoiding from the preexistence concept in Korean NPP projects that the WBS is a combination of Physical Breakdown Structure (PBS) and Functional Breakdown Structure (FBS). The unique features of the new WBS are as follows: (1) defined the definition of each level of the WBS, (2) subdivided the WBS into 5 hierarchical levels, and (3) adopted globally used general coding structure. The new WBS provides a basic hierarchical structure for the project scope and can be used as a basic tool for schedule control, performance measurement, project status monitoring, and communication among project participants. In addition, by putting the Work Package (WP) under the WBS, the Earned Value Management System (EVMS) per WP can be utilized for the project.

  • PDF

Development of Security Evaluation Management System Based on Common Criteria (공통평가기준을 기반으로 한 보안평가관리 시스템의 개발)

  • Kang Yeon-Hee;Bang Young-Hwan;Lee Gang-Soo
    • The Journal of Society for e-Business Studies
    • /
    • v.10 no.3
    • /
    • pp.67-83
    • /
    • 2005
  • Common Criteria(CC) was announced in June, 1999 in order to solve a problem which be happened by applying a different evaluation criteria among nations. Currently, a official version is v2.2 and v3.0 is a draft version. Because an evaluation demand is increased in the inside and outside of the country, an evaluation market growth is expected. Also, It needs methodology and work automation and project management for evaluation. In this paper, we propose A CC based Security Evaluation Management System(CC-SEMS) that is managing evaluation resources(deliverables , evaluation criteria, evaluators) and is useful in evaluation environment efficiently. CC-SEMS is to have integrated project management, workflow management, process management and is composed of deliverables, Evaluation Activity Program(EAP), Management Object(MO), Evaluation Database(EDB), Evaluation Workflow Engine(EWE).

  • PDF